Many older Ladue houses with hot-water heat have a radiant floor manifold, a short panel of supply and return pipes with a valve for each loop, mounted on a basement or utility room wall. It is easy to leave off the roof checklist because it is not a roof item. But the manifold often sits near the stairs, the back door or the exterior wall where the crew carries tear-off debris and bundles down, and a loop that loses heat in the middle of a cold week is a problem you will feel the same day.
Where the manifold usually sits
Radiant manifolds are usually mounted on a wall near the boiler or water heater, at a height that keeps the valves and gauges reachable. In a finished basement the panel may be behind a cabinet or a drywall access door. In a house with a crawl space or a partly finished lower level, it may sit in the path that leads from the garage or side yard to the stairs. The crew does not need to touch the manifold to do a roof, but they will walk past it, set materials near it, and carry dust through the same hallway. Find the panel, measure the clear space in front of it, and note whether the valves can be reached without moving anything else.
Take a photo of the manifold with the gauges, the labels on each loop, and the thermostat or zone controls it connects to. If a loop is not labeled, write down which room it heats while you can still test it. A roof crew that bumps a valve or a flow meter will not always notice, and a loop that goes cold afterward can be hard to trace back to a day when nobody was paying attention.
Keep the heat running while the deck is open
A roof replacement normally does not require shutting off the heat, but it does open the house to the weather for part of a day. Once the old shingles come off, the deck is exposed, and an unexpected shower can wet the attic and the rooms below before the underlayment is down. That is the moment you want the house heated and the thermostat set to a known temperature, so that any dampness dries and any frozen pipe is caught early. Ask each roofer whether the house will stay on its normal heat schedule while the deck is open, and whether anyone on the crew will switch a zone, close a valve or touch the boiler for any reason.
If your house runs on a boiler with a separate radiant loop, confirm which breaker or switch controls the circulator pump for the floors. Those pumps are often on a different circuit from the rest of the heat, and a crew working near the electrical panel should know which switch belongs to which loop before they start. Write the answer into the scope, not into a phone call.
What to ask each roofer
- Will any part of the heating system, including the manifold, the boiler, the circulator pumps or the thermostat, be touched during the roof work, and if so, by whom?
- Where will the crew carry tear-off debris and bundles inside the house, and does that route cross the manifold wall or the stairs to the basement?
- If rain gets into the attic while the deck is open, who calls you, who covers the affected rooms, and how long does the house stay on its normal heat schedule that day?
- Who is responsible for a loop that stops heating after the roof is done, and how will the crew document the condition of the manifold before the first nail?
- Will the crew stage materials, a dumpster or a hoist anywhere near the basement window that serves the manifold room?
The answers should be specific. A roofer who says the crew will be careful around the mechanical room has not answered the question. A roofer who says the crew will not open the manifold cabinet, will carry all debris out the side door, and will call you before entering the lower level has given you something you can check on roof day.
What to put in the scope
Keys puts a written scope with photos and measurements in the homeowner's hands before the work starts. For a house with a radiant manifold, that scope should name the manifold room, the route the crew uses to reach it, and the protection that goes on the floor and the wall. It should also say whether the manifold is excluded from the roof work entirely, which is the simplest answer when the crew has no reason to be near it. If the crew does need to pass through the room, the scope should say how the floor will be covered and who sweeps it at the end of each day.
If the manifold needs to move, be raised or be relocated to clear a path, that is not a roofing line. Get a separate quote from a licensed hydronic or plumbing contractor, and have the scope show that the roofer is not responsible for that work. A roof bid that quietly includes a plumbing change will be hard to compare with another bid, and the plumbing change will be hard to price after the fact.
Mark it before the crew arrives
On the day before the roof starts, walk the route from the driveway to the basement stairs with the roof lead and note every place where a door, a cabinet or a valve sits in the path. Tape a small card on the manifold cabinet that says Do not adjust. Call for help. Put the phone number of the household contact on the card. If you are away for the day, leave the manifold labeled and the thermostat set where you want it, and tell the crew in writing where the key or code for the basement door is kept.
The point of this check is not to make the roof more complicated. It is to make sure that the one piece of equipment in your house that cannot be replaced by a fresh shingle has a named owner, a clear route and a plan for the cold. A Ladue homeowner who has written that down before the trucks arrive will have far fewer questions on the day the deck is open. Questions about the roof itself can go to the roofer at (314) 220-2333, and questions about the heat should go to whoever services your boiler.