Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

Your Iron Front Fence Sets the Shingle Truck's Clearance

A wrought iron front fence can narrow the gate and the turn your shingle truck needs, so measure both before the delivery is booked.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

If your front lot has a wrought iron fence along the sidewalk, that fence decides more about the roof delivery than most homeowners expect. The shingle truck, the roof trailer and the dumpster all have to get from the street to your drive or apron, and an iron gate or a post set close to the curb can turn a simple delivery into a problem. Measure the gate opening and the clearance on both sides before anyone books a day.

Town roofing

Ladue front lots are often deep and wide, but the space that matters for a roof delivery is narrower than the lot. A shingle truck needs a clear lane to stop and unload, and the bundles then travel from the curb or drive to the eave. An iron fence adds two problems to that route. It narrows the gap the truck and trailer need, and it puts a hard edge where a crew member carrying a bundle might catch a shoulder or a knee.

Front fences on older lots often sit on the property line with the sidewalk running close behind them. That means the truck may stop in the street instead of on your lot, and the unloading path then crosses the fence line. Before the delivery is set, walk the route from the spot where the truck will stop to the spot where the bundles will sit, and count every post and gate on the way.

Ask the crew to show you where the truck will stop. Some crews stop at the curb, some pull into the drive, and some ask for a space on the street. Whether a truck or trailer may sit in the street depends on the city's rules for the right-of-way and on any parking limits on your block. Those rules come from the city, so check them directly rather than trusting a guess from the crew or from a neighbor. Keys Roofing can confirm what is practical on your lot, but the city decides what is allowed in its right-of-way.

The gate matters more than the fence. A gate opening that looks wide enough for a person may be too narrow for a pallet on a hand truck. Measure the clear opening, not the distance between posts, and note any latch, stop or hinge that sits inside the opening. A gate that swings into the walk can also block a crew member's path while a bundle is being carried through, so ask which way it will be held open during the day.

Iron pickets scratch and chip. A crew that carries bundles past a fence can take paint off the rails, and a bent picket or a loose post is easy to miss in the rush of a roof day. Take dated photos of the fence, the gate hardware and the posts before the first delivery. Those photos are the baseline for any later question about what was there before the work began, and they cost nothing but a few minutes with a phone.

Many older Ladue grounds also have stone or brick walls, and a fence set into a wall adds another fixed point. If the gate posts are set in masonry, the crew should know which part is the post and which part is the wall. Ask the crew to mark the spots that need care with chalk or flags, and ask them to tell you before any post, wall or cap stone is touched.

What it costs

A fence on the route does not usually add a line to a roof bid by itself. What adds cost is the work the fence forces. If the truck cannot reach the drive, the shingles may need to be carried by hand from the street, and that labor takes longer than a direct unload from the truck to the eave. A bid should say how the bundles get from the truck to the roof, and whether that hauling is included in the price or added later as a change.

Ask whether the bid assumes a smaller truck or a second delivery. A smaller truck carries fewer bundles per trip, which means more trips and more hours on the day. Ask each roofer to state how many trips the bid assumes, and what happens if the gate is blocked on the day and the bundles must wait at the curb overnight. The answer to that question should be in writing, because a bundle left at the curb is a bundle someone has to move.

Repairs to the fence are a separate matter. A bent gate, a cracked post or a scraped rail is damage that the crew should not leave for you to discover later. Ask each roofer who pays to repair fence hardware damaged during the job, and get the answer in the contract. A verbal promise that the crew will be careful is not the same as a written line that says who pays if something is bent.

Also ask whether the bid includes the time to open and close the gate each day, and whether the crew will need you home to unlock it. A gate that must be unlocked for every trip adds minutes to every hour of the day, and those minutes belong in the schedule, not in a surprise on the final invoice.

What to ask

  • Where will the truck stop, and is that spot on your lot, in the drive, or in the street?
  • What is the clear width of the gate, measured by you or by the crew, and where is the narrowest point on the route?
  • How will the bundles reach the eave, and is hand carrying through the gate included in the bid?
  • How many delivery trips does the bid assume, and what happens to bundles left at the curb if the gate is blocked on the day?
  • Who photographs the fence, the posts and the gate hardware before the first delivery, and who keeps those photos?
  • Who pays to repair fence hardware damaged during the job, and where in the contract is that written?
  • Does any part of the route cross a wall or a masonry post, and who marks those spots before the crew starts?
  • Who holds the gate open during the day, and who locks it at the end of each day?

Before you choose a roofer, send each one the same measurements of the gate and the truck stop you have in mind, and compare the answers line by line. Call the office at (314) 220-2333 to ask for a route check on your lot before any delivery is booked, and ask for the walk to be noted in writing so the fence is on the record before the first truck arrives.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office