A roof job in Ladue does not stop because the people who keep your house running are still coming in. A housekeeper arrives on Tuesdays, a nanny meets the school bus at three, an estate manager signs for deliveries, and a cook works the kitchen through the morning. Each of them now shares a lot with a tear-off crew that will be on the roof, in the attic and in the driveway for several days. The roofing bid rarely names them. This page gives you the questions to settle with your household staff and with each roofer before the first truck turns in.
Start with who needs to be inside
List every person who has a key, a code or a standing reason to be in the house during the job. Include the staff you pay directly and any agency that sends people to your home. Then write down the hours each one is normally present. Do this first because most roof days in St. Louis run from early morning until the crew calls it at dusk, and anyone who keeps a fixed schedule will walk into a site that looks different each day. Ask each roofer whether the crew will be on the roof, in the attic or in the yard at those hours, and whether the crew will need the back door or the side door open.
Tell your staff in writing what to expect about the attic hatch, the closets under the roof line and the upstairs rooms that sit beneath the tear-off. Do not rely on a verbal message passed along through a family member. A short note that names the room, the date and the hour is easier to follow and easier to check afterward.
Where staff park on a crew day
Parking is where households and crews collide. A dump trailer, a shingle pallet staging area and a dumpster all want the same stretch of drive that your staff use to reach the service door. Ask each roofer to mark on a sketch where the trailer will sit and where the dumpster will sit, then compare that sketch with the place where your staff normally park. If the answer is that they will share the drive, get the turnaround written down, including whether the crew will move trucks when a car needs to leave.
On a Ladue lot with a long approach or a circular drive, the trailer often ends up near the front of the house while staff use the rear court. That split can work, but only if the rear court stays clear of shingle bundles and the dumpster faces away from the service entrance. Ask who moves the cones and who checks the drive at the end of each day.
The service entrance and the kitchen
Staff usually enter through a service door, a mudroom or a side door off the garage. Those same doors are often the ones a crew uses to carry tools, buckets and tarps into the house. Decide which door the crew uses, which door staff use, and whether the two should stay separate. Ask each roofer how the entry will be kept clear of grit and how the path to the kitchen will stay dry if a storm rolls in during the afternoon. Shingle grit on a kitchen floor is hard to clean, and it reaches counters, food and appliances faster than most people expect.
Water matters too. Crews need water for their own use, and most will ask to use an outside hose bib or a utility sink. Ask whether the crew will use household water or bring its own, and whether staff will be asked to share a bathroom that the crew also uses. A written answer protects your staff from a request they never agreed to.
The attic, the closets and the rooms under the tear-off
The attic is where the most private items sit. Staff who clean closets, fold linens or dust the top shelves may be the only people who know what is stored up there. Before the tear-off starts, ask each roofer for a dated photo set of the attic and of any closet directly below a roof section that will be opened. Ask your staff to remove anything they consider valuable or personal from those spaces and to leave the rest in place. A dated photo set is what protects everyone when a question comes up later.
Ask who covers the floors and furniture under the open roof. Ask who removes the trash the crew generates. Ask whether staff may enter the work zone at all during a tear-off day, and if so, what the safety rule is. Those answers belong in the bid or in a short written site rule, not in a conversation at the door.
What to ask each roofer
Put the same questions to every roofer you consider, in the same order, and compare the answers on paper. The list below shows whether the crew has planned for a home where people work every day.
- Who on the crew will be the contact your staff can reach during the day, and how do they reach that person?
- Where will the trailer, the shingle pallet and the dumpster sit, and does that leave the staff parking spot open?
- Which door will the crew use, and which door will be kept clear for household staff?
- Will the crew enter the attic or the rooms below the tear-off, and will they photograph those spaces before work starts?
- Does the crew use household water or a hose bib, and do they need access to a bathroom?
- Who sweeps the grit from the entry and the kitchen path at the end of each day?
- How does the crew handle a storm that arrives while staff are still in the house?
A vague answer is information. If a roofer says the crew will "work around" the staff without saying how, ask for the specific room, the specific door and the specific hour. A roofer who has done this before will have a sentence ready. One who has not will need to write it down before you sign.
The storm and the early stop
St. Louis weather changes fast in late spring and summer. A line of storms can bring hail, high wind and lightning within an hour, and a crew that is partway through the tear-off may need to stop and cover the open section. Ask each roofer what they do with an open roof when a storm is coming, and who in the household should be told. Staff should know the signal that work has stopped and the roof is being covered, so no one walks into the attic while the crew is still securing the deck. Ask the roofer to put the stop rule in writing and to name the person who will call the house.
Freeze and thaw matter in the cooler months too. A morning start can run into frozen decking, and the crew may delay until the surface is safe to walk. Staff who plan their days around a fixed schedule should get the revised start time as soon as the crew knows it.
Keep the written record
Once you have answers from each roofer, keep them with the contract and the scope. Write a one-page household note that lists the staff names, their hours, the doors they use, the parking plan and the attic rules, and share it with everyone who works in the house. Keep a copy of the dated photo set and a note of who was told what and when. If a question about a missing item or a damaged fixture comes up after the job, that record shows what was agreed and what was not.
Keys Roofing can walk the lot with you and your staff before the crew is scheduled, and puts the scope, the site plan and dated photos in your hands in writing at each stage. You can reach the office at (314) 220-2333. Any insurance conversation stays between you and your insurer, because Missouri law at RSMo 407.725 forbids a roofing contractor from representing or negotiating a homeowner's insurance claim and from saying anything about paying or covering a deductible.