A boiler vent and its condensate drain can sit where the ladder lands, so have the roofer name both in the bid before the crew starts.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Plenty of older houses in Ladue heat with a boiler in the basement, and that boiler breathes through a pipe that leaves the house near the eave. The pipe is easy to forget when the roof comes off, because it sits in the wall and the soffit and does not look like part of the roof. It is still a roof penetration. It is also a termination that has to stay clear of snow and foot traffic, and often a drain that carries water away from the appliance. When the crew stages its ladder under that side wall, the vent end and the drain can end up exactly where the ladder feet and the shingle drop land.

This page covers what to settle with the roofer before the bid is final, so the vent and the drain are named in writing rather than discovered on the day the crew reaches the wall.

Town roofing

The St. Louis winter is hard on these terminations. Snow drifts against a side wall and can bury a vent intake within a day. Ice builds on the termination cap and the grille. The freeze-thaw cycle works on the caulk and sealant where the pipe meets the wall or the roof, and by the time a roof is being replaced, that joint has often cracked and been reset several times. A crew that flashes the new roof without looking at that joint is leaving the old failure in place.

Each appliance has its own install manual, and the manual sets the minimum distances between the termination and windows, doors, soffit vents, and grade. Those distances are not something the roofer should interpret on the day. Ask whether the crew has the manual for the boiler in your house, and whether the new roof changes the distance from the termination to the new eave, the new fascia, or the new soffit. A deeper eave or a new soffit panel can move the edge of the roof closer to the vent than it was before, and that change needs to be checked against the manual before the new material goes on.

Tear-off is the moment the pipe is most at risk. When the crew strips the eave, the vent may have to be lifted, cut back, or supported while the sheathing and the drip edge come off. A vent pipe left hanging can crack at a joint, and a cracked joint in a flue or intake is not a small problem. Ask who holds the pipe during the work, who cuts it if it has to be cut, and whether the cut is made by the heating trade or the roofer. The bid should name one party for the reconnection, because the reconnection is where a loose joint is usually made.

The condensate drain needs a separate look. High-efficiency boilers produce acidic condensate, and in many installs it runs to an interior drain or a neutralizer instead of the outdoors. Some installs run the drain outside to a point near the foundation or the eave. If yours does, the water can freeze on the walk in January, and during a thaw it can spill over the splash block and into the bed. A roofer who has been working on the house for weeks should know where the drain ends. If nobody knows, that is the question to answer before the first ladder goes up.

The boiler usually has to be shut down while the vent is worked on, and in a St. Louis January that means the house goes cold while a crew is on the roof. Plan the shutdown and the restart with the heating contractor, and have the restart checked before the crew leaves for the day. Do not assume the roofer will restart it.

What it costs

There is no single price for a boiler vent on a roof job, and any figure you hear without a scope attached is a guess. The cost depends on what is actually touched. A vent that passes through the wall well below the eave, with only the termination cap moving, is a small job. A vent that runs up through the eave and through the roof deck is a larger one, because the penetration needs flashing, the pipe may need new sections, and the heating trade has to confirm the new run still meets the install manual.

Break the work into lines you can read. A written bid should show the flashing or boot at the roof penetration as its own item, the pipe sections or fittings if any are replaced, the termination relocation if the cap moves, the condensate drain work, and the heating service visit for the shutdown and restart. If any of those lines is folded into a general labor number, ask for it to be pulled out. You cannot compare two bids on a heating line that sits inside a roofing total.

Ask whether the heating work is in the roofing bid at all. Missouri has no state license for roofers, so the bid itself has to say who does what. Work on a boiler usually falls to a separate trade, and local permit rules may apply to the vent. Keys documents the roof, puts a written scope with photos and measurements in your hands, and attends as the roofing contractor while the heating contractor does its work. A line in the roof bid that says which trade owns the vent is more useful than a line that says the roofer will handle it.

What to ask

Before you sign, ask the roofer these questions and ask for the answers in the bid, not on a phone call.

  1. Where does the boiler vent leave the house, and does the roof crew stage a ladder, a shingle drop, or a dumpster within reach of the termination?
  2. Will the vent be lifted, cut, or supported during tear-off, and who reconnects it?
  3. What flashing or boot seals the penetration, and is it rated for the vent material and the temperature the appliance produces?
  4. Does the new eave, fascia, or soffit change the distance from the termination to the edge of the roof, and has that been checked against the install manual?
  5. Where does the condensate drain end, and will the crew disturb it?
  6. Who shuts the boiler down, who restarts it, and on what day?
  7. If the pipe is found cracked or loose under the old roof, what does the bid say happens next, and who approves the added work?

Compare the answers. A roofer who says the heating trade will look at the vent and report back in writing has described a process. A roofer who says it will be handled, without naming who handles it, has made a promise. Keep the written answers with your roof file, and ask for an updated bid if the vent scope changes once the eave is open.

If you want the boiler vent and drain written into your roof scope before the price is final, call the Keys office at (314) 220-2333 and ask for those lines to appear in the bid.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.