A backyard ice rink in Ladue usually sits on the level part of the lawn, which is also where a roofing crew wants to park the trailer, drop the dumpster and stack the shingle pallets. The rink is a liner pinned to a wood or plastic frame, a pump and hose, and a set of boards that stay on the grass for weeks. Nobody thinks about it while planning a roof. Then the bid arrives with a March start date, the liner is still full of water, and the crew asks where the trailer will stand.
Town roofing
The rink matters for three reasons on a Ladue lot. First, the ground under it stays wet and cold longer than the lawn beside it, because the liner blocks the sun and the water sits in one place. Second, the boards and the frame are solid objects that a loaded ladder and a stack of bundles have to walk around. Third, the pump, hose and heater cord usually run back to the house along a path that a roofer will cross on the way to the eave.
St. Louis freeze and thaw cycles change how that ground behaves. A late hard freeze can lock the lawn solid, and then a warm week in March turns the top few inches to slush. A ladder foot set on that slush sinks. A rink that was drained in February can leave a soft patch where the liner sat, and that patch may be exactly where the crew wants to set the ladder for the north eave of a two-story house. Ask the crew to walk the lawn with you after the thaw, not in January, and to mark the soft spots with flags.
Many Ladue lots are big enough that the roof truck does not need the rink's space, but the crew still needs a route from the street to the house and a place for the dumpster that does not sit on the drain line. Find out where the rink drains. If it runs to a storm inlet, the crew needs to know the inlet's location before the first bundle comes off the truck. If it runs onto the lawn, the water will soften the ground around the stack, and that matters for the trailer too.
What has to move, and what can stay
Once the rink is down, four things need a place to go before the roof crew arrives.
- The liner, frame and boards, which need a dry spot out of the drop zone and away from the path to the dumpster.
- The pump, hose and heater cord, which should be drained, unplugged and coiled, with the cord kept off the ground the crew walks on.
- The warming shed or bench, which is often set close to the house and may sit under the line of falling tear-off debris.
- The water itself, which has to leave the lawn by a route the bid names, not by a hose the crew finds on the morning of the job.
A rink still standing on the start date is a rink the crew will plan around, and that plan should be written. Keys Roofing puts a written scope with photos and measurements in the homeowner's hands before the first day, and the rink belongs on that scope the same way a trampoline or a gate motor does. The scope should name what moves, who moves it, and by what date.
Timing the rink's removal
A rink usually comes down in late February or March, once the weather holds above freezing for several days running. The liner is drained, the boards are lifted off the grass, and the frame is taken apart or left for the next winter. The roof schedule does not follow that calendar on its own. A bid written in January for a March start needs to name the day the rink comes down, or the crew arrives to a yard that is still a rink.
Ask the roofer to put the removal date on the same line as the start date, and to say what happens if the rink is still up that morning. A reasonable answer is that the start moves, not that the crew works around a flooded lawn. Also ask who decides that the ground is firm enough for the ladder. That decision should belong to the roofer, and it should be made after the thaw, with the rink already gone.
What it costs
The rink costs the homeowner nothing new on roof day, but moving it does. Draining a liner, folding it, lifting the boards and stacking them takes labor, and that labor might be the homeowner's, the roofer's or a hired hand's. A bid should not leave that work blank. If the roofer includes the rink move in the job, the line should show up in writing with a number. If the homeowner moves the rink, the bid should say that the crew will work around the stack, not into it.
Water is the cost people miss. A flooded rink holds a large volume of water, and draining it onto the grass can soak the soil where the ladder stands. Ask whether the water can go to the storm inlet or onto the lawn, and whether either choice is allowed on your lot. Hauling out a frame or a heater that has to go to a recycler is a separate trip, and each trip should appear as its own line, not folded into the roof labor.
What to ask
- Who moves the liner, frame, boards and heater, and by what date?
- Where will the pump and hose be coiled, and will the crew step over them on the way to the eave?
- Does the rink drain to the lawn or to a storm inlet, and who decides which?
- Which part of the lawn will the dumpster and the trailer use once the rink is gone?
- Will someone walk the lawn with me after the spring thaw, before the ladder is set?
- Is the rink on the written scope, with a line that names who handles it?
Call Keys Roofing at (314) 220-2333 if the rink is still on your lawn and the crew wants a start date. Bring photos of the rink, the frame and the lawn, and the crew can mark the stack spot, the trailer spot and the drain route on the scope before the first bundle moves. Ask for that plan in writing, and keep the copy with the rest of the roof paperwork.