Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

Who Takes the Zip Line Between Your Oaks Down Before Roof Day?

A cable strung between two back yard trees is a roof day question, so settle who removes it, what that costs, and when it comes down.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A zip line strung between two oaks in a Ladue back yard is three things at once: an anchor point in the ground, a cable under tension, and a line across the air where the roof crew wants to work. Most homeowners remember the swing set and forget the cable. On roof day the cable is the part that matters, because it can catch a ladder rail, a bundle sling, or a worker's lanyard before anyone sees it. This page is for the point where you still have time to decide what happens to it.

There are three honest answers. The line comes down for the tear-off and goes back up afterward. The line stays in place with its lower end lowered and marked, and the crew agrees on a clearance zone. Or the line moves to a new anchor pair. Each answer changes the bid, the staging plan, and who handles the trees. Pick one before a start date is set, and get it in writing.

Town roofing

Ladue lots tend to be wide, the houses sit back from the street, and the trees are old enough that their lower limbs reach the eave. A zip line usually runs between two of those trees at a height that clears the lawn. The trouble is that the roof crew needs the lawn. The side yard is where the shingle pallets wait, where a trailer or dumpster may sit, and where the nail gun cord runs to the ladder. A cable at head height across that strip turns an ordinary delivery into a stop.

The drop zone below the eave is the other problem. Tear-off debris falls straight down and then slides outward, so the ground under a cable line is part of the drop zone whether or not anyone plans for it. Ask the roofer to mark the drop zone on a sketch of your lot, and check whether the cable crosses it.

The cable also changes the ladder path. A straight ladder set at the eave needs clear ground for its feet, and its rails need to clear anything hanging at chest height. If the upper anchor sits on a tree that the ladder must pass, the crew will either lean the ladder on the trunk or walk around the line. Neither is a plan. Ask each roofer where the ladder will stand, then check that spot against the cable's path on a walk before the crew arrives.

St. Louis weather adds one more problem. Anchors set in spring can loosen through a freeze-thaw winter, and a cable that sags after a wet week can drop into a path that looked clear in August. If the line stays up through a late-fall roof start, check its tension and its ground anchor on the walk, not from memory.

Permits do not decide the zip line, but the permit paperwork does set the date. Before the roof is scheduled, confirm which office issues the permit for your address, because that answer decides which desk holds the paperwork and when an inspection can be booked. A line that has not been moved by the permit's start date can push the whole job.

What it costs

Removing a zip line, storing its cable and hardware, and reinstalling it after the roof is done is almost never a line in a roof bid. Usually it belongs to whoever installed the line, a tree or yard contractor, or the homeowner. That gap is where surprises show up. A roofer may say the line is not in scope and leave it there, and the homeowner learns about it on the morning the trucks arrive.

Ask for the removal as its own priced item, with the reinstall listed separately. If the roofer does not do the work, ask for the name of the company that will, and whether that company will come out on roof day to take the line down. A line that is not moved in time can cost a missed start, and a missed start changes the rest of the schedule. The removal date is worth a number in writing even when the number is small.

If the line is to be relocated rather than removed, the new anchor points need their own quote. Trees are not a roofing item, so a roofer who offers to set anchors in a tree should say who carries the liability for that work and who checks the tree afterward.

What to ask

  1. Where will the ladder stand, and what is the cable's path above that spot?
  2. Who takes the line down, who stores its cable and hardware, and who puts it back?
  3. Is that removal priced in the bid, or left as an allowance you would have to order yourself?
  4. If the line stays up, what clearance height will the crew mark, and who puts the marking on the cable?
  5. Which day does the line come down relative to the shingle delivery and the start of tear-off?
  6. Who inspects the anchors after the roof is finished and before the line takes weight again?

Write down each answer with the date you received it. A verbal assurance that the line will be handled tends to disappear once the crew is on the roof and the cable is still hanging. If the answers differ between two roofers, that difference is information. The roofer who names the cable, the clearance, and the storage spot is more likely to have looked at your yard closely enough to know where the trouble is.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.