Most two-story houses in Ladue have carpet in at least one upstairs room, and plenty carry it onto the stairs and down the hall. When the roof comes off, that carpet sits directly under the work. Old shingle grit, felt scraps and loose nail heads reach the floor even on a careful crew day, and any rain that reaches an open deck lands on the carpet first. The homeowner's decision is not whether the carpet gets touched. It is which rooms are cleared, which are covered, whether the carpet stays down or comes up, and who does each job, all written down before the first bundle goes up.
Town roofing
A Ladue roof is usually a set of planes rather than one long slope. Bedrooms that sit under a valley, a dormer cheek or a rear addition take more of the tear-off than a room under a flat run of field shingle, because the crew works a valley on its knees and drops the cut ends of old shingles there. Before a bid is signed, walk the upstairs with the estimator and mark on a floor plan every room with carpet, every room with a ceiling light or fan under a valley, and every bathroom fan that vents through the roof. Those three lists decide most of the carpet plan.
St. Louis winters add a second kind of risk. A freeze-thaw cycle in late winter can leave ice at the eave and water sitting behind the top plate, and a tear-off that starts on a thawing day can find the deck wet under the old felt. Carpet and pad take up that water and hold it against the subfloor for days, and the smell of a wet pad can last into the following spring. If the start date falls in a freeze-thaw month, the bid should say what the crew does when the deck is damp and who replaces a pad that was soaked on the job.
Hail season matters in a different way. After a storm, a ceiling stain in an upstairs bedroom may be the first sign the roof was hit, and the carpet below it may be the first thing a homeowner wants to dry out. Keys documents damage with dated photos and measurements and puts a written scope in the homeowner's hands. Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, so the insurer paperwork belongs to the homeowner, and the contractor's job is to document the damage and attend the visit as the contractor.
Where a bedroom closet sits under a sloped ceiling, the knee wall can hold a stack of boxes right against the rafters, and those boxes are the first things that get wet if a valley leaks in a storm. Clear the closet floor and the carpet under it at the same time, and do not leave that job to the crew's first morning on site.
Before the crew arrives, photograph each upstairs room with the date visible in the picture, including the carpet edges, the seams and any existing stains. That photo set is the homeowner's own record. It shows the carpet's condition before the roof work, and it is the simplest answer to a later question about whether a mark was already there. Keep the originals on the phone or a drive, not only the copies sent to a text thread.
What it costs
Carpet protection and carpet handling are usually separate lines from the shingle price, and they should appear that way on the bid. Look for four lines. The first is carpet protection, meaning taped plastic or board over the floor of each room below the work. The second is furniture moves, which covers who lifts the bed, the dresser and the nightstand and where each piece waits during the day. The third is carpet lift and reset, needed only where the carpet has to come up at a seam or at a valley wall. The fourth is pad replacement, needed if the old pad is soaked, stained or too brittle to reuse. Each one should carry its own dollar figure, so the homeowner can see what each costs instead of accepting a single allowance.
Ask each roofer whether the carpet line is priced by the room, by the square foot or by the hour. A room-based price is easy to check against the floor plan. An hourly price depends on how long the crew stays upstairs, and that is hard to predict until the tear-off starts. If one roofer quotes an allowance and another quotes a per-room line, the comparison has to be made on the same rooms. Otherwise the lower number may simply cover fewer rooms, and the difference shows up later as a change order.
Ask, too, whether the price assumes the carpet is dry and clean when the crew starts. A carpet that has been wet for a week before the roof date needs drying and possibly a pad replacement before anyone can protect it, and that work is not the same as ordinary protection. Get the drying step written as its own line, with the trigger named, so that a damp floor on the morning of the start does not become an argument about who pays.
What to ask
Bring these questions to each roofer and write the answers beside them:
- Which upstairs rooms sit under a valley, a dormer or an addition, and which of those have carpet?
- Who moves the furniture in each of those rooms, and where does it wait during the day?
- Is the carpet protection taped plastic, board or both, and does it reach the doorway and the hall?
- Does the crew tarp the open deck every night, and who checks the tarp after a wind?
- If rain reaches the carpet, what is the written step for drying it, and who pays for a replacement pad?
- Is the carpet lift a line in the bid, and is the reset included in that line?
- Who vacuums the carpet at the end of each day, and does the final walk include the upstairs floors?
The tarp answer matters because it covers the case the homeowner cannot control from the street. A roofer who names the tarp rule, the person who checks it and the room where the carpet is protected has answered the carpet question in writing. A roofer who says the crew will handle it when it comes up has not answered it at all.
Call the office at (314) 220-2333 with the room list from your floor plan, and the estimator can tell you which rooms need protection before a crew is booked.