A tulip poplar is one of the tall trees that gives many older Ladue yards their height, and it is also a tree that drops a lot of material on a roof job. Twigs come down in ordinary wind, and the spent flower parts and seed clusters fall through the warm months and into fall. No single day brings much of it down. Over the weeks a roof crew is working, though, the litter builds up in the gutters, on the walk, in the flower beds, and across the lawn where the shingle bundles and the tear-off pile will sit. Roof bids rarely name it. This page is about the line that should be there.
Town roofing: what falls from the tree, and when
The tulip poplar is a broadleaf with large, flat-ended leaves that turn yellow in fall and drop over a short stretch of weeks. Along with the leaves, the tree sheds small twigs, especially after a windy night or a thunderstorm, and the leaf stalks break off and collect in gutters. The flowers look like tulips and come in late spring, and their petals fall in a short burst. Later in the season the seed clusters mature and begin to come apart, and the winged seeds drift down through fall and into winter. The timing moves with the weather from year to year, so a roof date in late fall should not assume the tree has finished shedding.
Aphids that feed on the tree can also leave a sticky film of honeydew on leaves and on anything parked below, including the roof crew's trucks and staging. That film is usually a cleanup issue rather than a roofing one, but it belongs in the same conversation because it is part of the litter the crew will walk through.
Where the litter ends up on a roof job
Gutters come first. Twigs and leaf stalks settle in the trough and wedge into the downspout outlets. Once the roof is stripped, the gutters also take tear-off grit on top of whatever was already there. A clogged gutter on the day the new shingles go on is a problem the homeowner will notice in the next heavy rain, so the cleaning has to happen before the crew starts pulling old roofing off the eave.
The ground is the second place. The crew stages bundles, the dumpster and the ladder on the lawn or drive. Twigs under the ladder feet and seed clusters on the walk add trip hazards for the crew and for anyone who crosses the yard during the job. A wet seed cluster on a paver walk can be slick, and a twig can wedge under a ladder rail. Ask which path the crew will use to reach the eave, and whether that path gets swept before the first climb of the day.
The third place is the beds. Tear-off debris and tree litter mix into the soil, and the beds can end up holding grit that a homeowner would rather not dig through in the spring. Most of this is manageable if it is named in the bid and worked into the daily cleanup.
What it costs, and what the bid should name
Gutter cleaning before tear-off is usually a small line, but a small line that is missing from the bid tends to appear later as a surprise on the final invoice. A roof bid that takes the tree into account says the litter in plain terms. Each item below is a line the homeowner can check against the crew's day, and each one can be answered in a sentence.
- Who clears twigs and seed clusters from the gutters and downspout outlets before tear-off begins, and whether that work is inside the bid or billed as a separate charge.
- Whether the gutters are cleared again after the new shingles go on, and who checks that the outlets are running clear.
- Which walk, drive and lawn strip the crew will use for ladders and bundles, and whether those surfaces get swept at the end of each day.
- Where the tear-off pile is staged, so that litter is not pressed into a flower bed or under the ladder feet.
- Whether the final cleanup covers the lawn and beds, and whether it happens before the magnet pass over the yard.
What to ask each roofer
Send the same questions to each roofer, in writing, and compare the answers. The answers that differ will tell you more than the totals do.
- Do you clear the gutters before tear-off, or only after the new roof is on?
- Is gutter cleaning in your total, or is it a line item you will add later?
- Where will your ladders and bundles sit, and will the crew sweep that spot each day?
- If a seed cluster or twig ends up in a downspout after the job, who goes back up to clear it, and who pays for that visit?
Timing the roof around the tree
Late fall and early spring are the seasons when tulip poplar litter is likely to be on the roof at the same time the crew is working. A roof scheduled in November may share the job with the last of the leaves and the seed clusters coming down. A roof scheduled for March may meet the first twigs of the spring cleanup and the wet weather that carries them into the gutters. Neither timing is a reason to avoid the date, but either is a reason to ask the roofer what the crew does with the litter on days when the tree keeps dropping.
If the homeowner clears the gutters before the crew arrives, that does not replace the roofer's line. The bid still needs to say who cleans after tear-off and before the final walk, because a gutter that was clear on Monday can be full again by Thursday.
What Keys puts in writing
Keys Roofing puts a written scope in the homeowner's hands, with photos and measurements of the roof and the work. The tree litter belongs in that scope the same way the flashing and the fasteners do. Before you sign, call (314) 220-2333 and ask which of the lines above appear in the scope, and how the crew handles the gutters and the lawn on each day of the job.