Hardwood on the top floor of a Ladue house is the part of a roof job that homeowners forget until the dust shows up. Tear-off takes the old shingles, felt and nail-studded deck boards out through the attic, and the path those materials take runs past the hatch, the top of the stairs and the bedroom doors below. Grit that works under a door or a dropped tool on oak can dent boards and scratch the finish in an afternoon. This page is for the homeowner who is still deciding, and who needs to know what each roofer will lay on the floor before the first shingle comes off.
Town roofing
Many older houses in Ladue have a finished second floor with site-finished oak or fir over a plank or board subfloor, and plaster or lath ceilings below the roof. A crew working in that attic walks across the joists, lifts the hatch, and carries bundles and debris down through the same opening. Every trip moves weight and dust toward the rooms below, and the old deck itself sheds loose granules and mineral dust for days after the nails come out.
Winter timing matters here too. St. Louis freeze and thaw cycles mean a deck that is open overnight can take on moisture, then dry out as the house heats up. Hardwood responds to that swing. A floor that is covered, kept at a steady indoor temperature and not exposed to an open attic will move less than one that sits under a sky-open roof. The crew does not control your thermostat, but the bid can say whether the attic opening stays closed at night and who checks it before the crew leaves.
Keep the floor question separate from any leak question. A dry floor that is about to be walked on by a crew for two or three days needs protection and a plan. A floor that has already taken water needs a different first step and a different record. This page only covers the first case.
Ask each roofer about the stair run too. Carpet runners and bare treads take the most foot traffic on a roof job, because crews carry tools up and down at every break. Bare oak treads can scuff under boots that carry grit. A runner that is laid on day one and inspected on the last day is a small line item that prevents a larger repair call later.
What it costs
Floor protection is a material and labor line, not a courtesy. Rosin paper or a self-adhesive protective film over the travel path, plastic sheeting taped at doorways, corner boards or plywood runners where ladders and tool bags will rest, and the time to lay and remove all of it are real costs. A bid can carry this in three ways: as a numbered line with a price, as a sentence that says the crew will protect the floors, or not at all. Only the first can be compared across bids. The second states an intention. The third usually means the protection is either added later as a change order or skipped.
Ask for the floor covered in square feet, not just a count of rooms. A top-floor bedroom with a hatch directly above it needs more protection than a closet the crew never enters. Ask whether the protection is priced once for the job or per day. A three-day tear-off with a rain delay can run the protection line twice if the roofer relays runners every morning, and that difference should be visible in the bid before you sign rather than discovered on the invoice.
Ask what happens when protection tears or a board is marked anyway. A sound answer names a person and a sequence: the crew stops work in that room, photographs the mark with a dated file, and tells the homeowner the same day. That gives you something to hold the roofer to in writing. A vague answer is not a refusal, but it is a reason to ask again until the answer has a name and a step.
Keep an eye on the cleanup that comes after the crew leaves. Shingle grit tracked down the stairs into a finished hall has to be swept and often vacuumed with a HEPA tool, and oak that has been scratched may need refinishing rather than a touch-up. None of that belongs in the roofing price by default. Put it in the bid as its own line, or write down which party handles it.
What to ask
Before you sign, put these questions to each roofer and write down the answer:
- Which rooms, stair runs and landings get covered, and with what material?
- Is the attic hatch closed and sealed at the end of each day, and who checks it?
- Where do debris, shingle bundles and tools stage, and does any of that path cross an upstairs floor?
- Is floor protection a numbered line, and does it repeat on rain days?
- What happens when a board is scratched, marked or dented during the work?
- Who walks the floors at the end of the day, and is there a dated photo set from before the crew started?
Ask the same questions of every bidder, in the same order, so the answers line up on one sheet. A roofer who says the floors will be handled has not answered. A roofer who names the material, the rooms, the stair run and the person who checks the attic hatch each evening has.
Ask Keys Roofing the same questions when you call (314) 220-2333, and ask for the answers in writing before you choose a start date. Then compare the written answers against the bid, not the phone call.