Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

The Shingle Truck Turns In Off Clayton Road, So Plan the Approach

A Ladue lot on a busy road needs a written turn-in, a trailer stop and a short list of questions for each roofer before the bid is signed.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A Ladue roof job often starts with a question about the street before anyone asks about shingles. The lot may sit back from a road that carries steady weekday traffic, the drive may bend around a stand of trees, and the house may have a fence or a retaining wall between the front door and the nearest place a trailer can stop. Clayton Road and Ladue Road both carry heavy traffic at the hours a roof crew wants to arrive and leave, so the turn-in deserves a written answer before the bid is signed.

Town roofing starts at the curb

The shingle truck and the tear-off trailer decide the layout of a roof day more than almost anything else. The shingle truck is long and needs room to swing, and the trailer that takes away old shingles needs a flat place to sit for the length of the job. Neither one fits neatly on a narrow residential frontage, and neither should be parked on a sidewalk or across a neighbor's drive. Ask each roofer where the truck will stop, which direction it will enter from, and whether it will have to reverse onto the street. A written answer is more useful than a phone answer because the crew lead on the day may not be the person who took your call.

Many Ladue homes sit on lots where the drive is the only paved area that can take a truck. If your drive is short or sloped, ask whether the truck will stage in the street. In many municipalities, a vehicle or dumpster in the public right-of-way needs a permit, and the rule is set by the city, not by the roofing company. Confirm with the City of Ladue's building office before the crew arrives, and ask the roofer to say in writing who will apply for any street permit.

Check the turn before the trucks do

Walk the route yourself. Stand at the curb where the truck would stop and look at the overhead lines, the mailbox, the tree limbs and any posts or planters along the drive. Count the steps a crew would take from the truck to the ladder position. Then look at where the old shingles would be carried down and where they would land. Turn problems on roof day usually begin with a truck that could not make the turn, so it helps to test the path with a tape measure and a phone photo before the bid is final.

Sightlines matter too. A truck that stops near a corner, or at a drive that meets a busy road, needs a clear view both ways when it pulls out. Ask the roofer whether the driver will be guided out by a crew member on the day, and whether the crew will use cones or a sign while the truck is backing. A plan for pulling out is as useful as a plan for pulling in, and it is rarely written down.

Gates, hedges and the long drive

Ladue properties frequently have gates, hedges and privacy walls that narrow the route to the back of the lot. A gate that is too narrow for a pallet of bundles will slow the crew on every trip. Ask whether the gate will be opened for the job, who will open it, and who will close it at night. If the crew will carry bundles through the gate by hand, say so in the bid, since the number of trips changes the labor hours. Trees on a long drive can also drop limbs onto a lowered trailer or catch the boom of a hoist, so ask whether the crew will trim anything that sits in the path.

What it costs

The cost of a difficult approach is seldom a single line on a roof bid. It shows up as extra hauling, extra labor hours, a second trailer move, or a hoist if the truck cannot reach the eave. Some roofers price this into the labor. Others list it as a separate item, or leave it out and bill it later. Neither approach is wrong by itself, but you should be able to see which one applies to your lot before you compare totals.

When two bids differ widely, check whether one assumes the truck can reach the back of the house and the other does not. A bid that quotes hand-carrying bundles through a narrow side yard may carry a higher labor number than a bid that assumes a driveway stop. Ask each roofer to say in writing where the bundles will be staged and how they will reach the roof. A clear answer gives you a way to compare the numbers honestly.

Ask whether the approach affects the schedule as well. A crew that must carry every bundle by hand moves fewer squares in a day than one with a driveway stop, so the calendar may stretch. Ask how many working days the bid assumes for the approach you have described, and whether a change in the approach would change that number.

What to ask

Put these questions to each roofer in the same order, and keep the written answers together. Ask where the shingle truck will stop and which direction it will enter from. Ask whether the trailer will sit on the drive, in the street or somewhere else. Ask who will apply for any street or right-of-way permit and who will pay the fee. Ask how the crew will move bundles past a gate, a hedge or a side wall. Ask who will open and lock the gate each day. Ask whether overhead lines and limbs along the drive will be checked before the truck arrives, and who will coordinate that with the utility or the tree service.

  • Where the shingle truck stops, and the direction it enters.
  • Where the tear-off trailer sits for the length of the job.
  • Who applies for any street or right-of-way permit, and who pays for it.
  • How bundles get past a gate, a hedge or a side wall.
  • Who opens and locks the gate each day.
  • Whether overhead lines and limbs on the drive are checked before arrival, and by whom.

Ask each roofer what the crew does if the truck cannot reach the planned stop on the day. A good answer names a fallback location, a call to you before any change, and a written note of what changed. An answer that depends on finding a spot when the truck arrives leaves the decision to whoever is standing at the curb that morning.

Finally, ask for a photo of the approach with the stop marked on it. A roofer who has walked the lot can mark it in a few minutes. You can then check the mark against your own walk and decide whether the layout works before the crew is scheduled.

If you want to talk through your lot before you pick a roofer, call Keys Roofing at (314) 220-2333. Bring a photo of the drive, the gate and the turn, along with a rough measure of the gate width, and the office can help you sort out which questions matter most for your address.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office