The Gate Motor's Wire Runs Under the Drive the Trailer Uses

A Ladue gate operator's power run and keypad post sit in the path of the roof trailer, so settle them before the drive is loaded.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Many Ladue houses sit at the end of a long private drive, and a good number of those drives close behind an automatic gate. The gate operator is a motor in a steel box, usually set against a pier or in a planter near the arm. A power line and a control wire run underground from it to the arm, the keypad, and sometimes a camera or intercom post. The crew rarely notices any of it, and the homeowner often forgets it is there until a trailer clips the arm or a shovel cuts a wire.

This page is for the homeowner who has a gate, is comparing roof estimates, and needs to know which parts of the gate work belong in the roof plan. The gate matters for three things: when the trailer can come in, where the crew can stand while the arm is held open, and which buried wire or box sits where a stack of shingles is supposed to go.

Town roofing

Roof work on a Ladue lot often starts at the gate, not the house. The drive can run a long way back, bend past a garage or a pool, and cross a stretch that a roof truck cannot turn in. A roofer who has not walked that route will price the trip from the curb and find out the rest on the morning of the delivery. A gate that has to stay open all day, or a gate that closes on a timer, changes both the delivery window and the number of times someone has to walk back to the pier.

Keys can walk the drive with you before the estimate. The walk marks the gate box, the power run, the keypad post and the arm's swing on the ground, so the crew knows what to keep the trailer off and where a material stack can wait. The walk also gives you a dated photo set of the gate as it stood before the job, which is useful if anything about the gate changes during the roof work.

Where the gate touches the roof day

  • The trailer and the shingle delivery need the arm open for the whole time the truck is on the drive. Ask whether the gate will be held open by you, by the roofer, or left on a timer, and ask who has the remote while it is open.
  • The arm swings across the drive. A bundle stack, a dumpster or a pallet set in the swing path can jam the motor or bend the arm.
  • Power and control wire often run in a shallow trench along one edge of the drive. A plate compactor, a stake or a dumpster leg can cut it, and a cut control wire can stop the gate with no warning.
  • The keypad or intercom post sits near the curb in many setups. Crew traffic on a narrow drive can knock it loose or pull its cable.
  • If the gate has battery backup or a solar panel on the pier, check both before the crew arrives. A dead backup battery is usually found on the first night the gate fails to close.

Settle the wire before the trailer turns in

A gate operator is an electrical system, and the roof plan should say who touches it. Most roof crews will not open the operator box, and they should not. If the drive needs a material stack or a trailer parked where the power run sits, the wire has to be located first, marked, and kept clear. A roofer's paperwork does not tell you who will handle the gate wire, so the check is the written plan and the name of the person doing the electrical work.

If the gate itself is being moved, rewired or replaced during the roof job, that is a separate job with its own electrician or gate installer. Put it in a separate contract. Ask the Ladue building office whether any part of the gate work needs its own permit, and do not assume it is covered by the roof permit.

What it costs

The gate is usually not part of a roof price, but protecting it can be. A roof bid that says it will protect the drive should name what the protection is: a cone line, a mat over the wire path, a marked no-stack zone, or a plan to hold the arm open. A bid that says protection is included without naming it has not priced anything you can check.

If the crew must move the keypad, lift the arm for the trailer, or reset the gate after a delivery, those are added steps. Ask each roofer whether those steps are inside the bid, and if they are not, ask for the hourly line or the fixed line in writing before you sign. Ask also whether a damaged gate operator or cut wire is a separate repair with a separate quote, and who makes that call. Keys documents the gate as it stands before the job, puts the written scope and photos in your hands, and attends as the contractor. The gate repair itself is a separate trade.

What to ask

  1. Walk the drive with me before the estimate, and mark the gate box, the power run and the keypad post on the ground.
  2. Will the gate be held open for the whole delivery, and who holds the remote while it is open?
  3. Where will the trailer stand, and where will the shingle stack wait if the drive is too narrow to hold both?
  4. Does your bid include protecting the buried wire and the gate box, and how is that protection done?
  5. If a buried wire is cut, who calls the electrician, who pays for the repair, and how long does the gate stay out of service?
  6. Is any part of the gate work, including moving the keypad, inside your bid or outside it?
  7. Will the gate battery or solar backup be checked before and after the job?
  8. Will you put the answers to these questions in the written scope, with dated photos of the gate as it stands before the work starts?

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.