A Dutch gable is the upper triangle of a gable end that sits on a flared shoulder instead of rising straight from the wall. On older houses in Ladue you will see the shape on Dutch Colonial and Colonial Revival homes, where the lower roof comes down close to the first floor and the gable above it kicks outward. From the street it reads as one gable. From the attic and the roof deck it is two roof planes meeting at a shoulder, and the shoulder is the place where a roof quote tends to go thin.
Where the shoulder sits
The flare creates a short horizontal ledge, or a steep kick, where the lower roof plane meets the wall of the upper gable. Water running down the upper gable has to cross that ledge before it reaches the lower roof, and it has to cross without finding a seam. On most houses the first sign of trouble is a stain on the wall of the upper gable, just above the lower roof line. The stain is often some distance from the real failure, because water travels along the sheathing and the top plate before it shows on the plaster or the trim.
This is why the shoulder should be inspected before anyone quotes the tear-off. A roofer who looks only at the field shingles on each slope will count square footage correctly and still miss the detail that decides whether the new roof sheds water at the shoulder.
What a roof bid has to name
A line that says "reroof gable ends" does not tell you who builds the shoulder or what material goes into it. Ask each roofer to write down three things before you compare totals:
- The metal or membrane used at the shoulder, with its gauge or thickness and the width of each piece.
- The step flashing or counterflashing where the shoulder meets the wall, and whether the existing flashing is reused or replaced.
- The direction the shingles will run across the flare, and how the cut pieces at the kick will be fastened.
Keys documents the shoulder with photos and measurements before the tear-off begins, and it puts that written scope in the homeowner's hands. That record matters later if the new roof needs a second look at the shoulder. The same three lines should appear in every bid you collect, so you can compare like with like.
The valley where the flare meets the roof
Where the flared section meets the lower roof, the two planes form a valley. A valley on a Dutch gable is shorter than a main-roof valley, but it carries water from a steep upper section onto a lower slope that may have a different pitch. Ask each roofer whether the valley will be open metal, closed-cut shingles or a woven shingle pattern, and what the metal is. Open valleys need a named metal and a width. Closed-cut valleys need the shingle product line named, and on the lower plane that will be Atlas or Malarkey, since those are the only shingles Keys installs.
The valley is also where a bid can hide a change order. A quote that says "valley work included" may be pricing a standard valley, while the shoulder needs a longer piece of metal to clear the flare. Ask for the length of valley metal in linear feet, and compare that number across bids.
Brick, siding and the counterflashing
The wall at the shoulder is often brick on the lower floor and siding or stucco on the upper gable. The flashing has to suit both. On brick, counterflashing sits in a reglet cut into the mortar joint, and the reglet depth and the metal gauge should be stated in the bid. On siding, the flashing usually sits behind the lowest course of siding and over the step flashing, and the bid should say how the siding will be lifted, reset or replaced.
Many older Ladue houses have mortar that has been repointed several times. Ask the roofer whether the reglet will be cut into existing mortar or into a new joint, and whether a mason is needed. If the answer is that the roofer will caulk the joint, ask why caulk is used instead of metal, and write the answer down. Caulk at a shoulder is a maintenance item, not a flashing system.
The rake trim and the gable vent
The upper gable has two more details that a bid often skips. The first is the rake trim, the board or metal that runs along the sloped edge of the gable. On a Dutch gable the rake trim has to follow the flared profile, and the cut at the shoulder is a place where water can get behind the trim. Ask who cuts and fits the rake trim at the shoulder, and whether the trim will be painted or wrapped.
The second detail is the gable vent, if one is present. A vent set into the upper gable has to be checked for the same reason as any other opening. Ask whether the vent will be reset, replaced or left alone, and whether the attic side will be inspected for insulation that may have been pushed against the vent louvers. Attic air movement matters on these older houses, and a vent that is blocked by insulation can hold moisture against the sheathing behind the shoulder.
What it costs, and where the line goes
A Dutch gable adds work that does not show up in the square count. The shoulder needs its own flashing lines, the valley at the flare needs its own metal, and the rake trim takes more cutting than a straight gable. Each of these should appear as a separate line in the bid, not folded into a general price for the gable ends. A separate line lets you see what the roofer is charging for the shoulder and lets you ask why one bid carries more or less than another.
Be cautious about any bid that gives a single gable-end price without describing the shoulder. The total may look reasonable while the actual scope at the shoulder is a few feet of standard flashing and a caulk line. Ask the roofer to break the gable into its parts: the upper triangle, the shoulder, the valley, the rake and the wall flashing. Then compare each part across the bids you have.
Questions to put to each roofer
- Will you photograph the shoulder, the valley and the wall junction before the tear-off, and will I receive those photos?
- What metal or membrane goes at the shoulder, and what gauge or thickness is it?
- Is the counterflashing set in a reglet, and what is the reglet depth?
- How long is the valley metal at the flare, in linear feet?
- Who cuts and fits the rake trim at the shoulder, and is it included in the price?
- Will the gable vent be reset, replaced or left in place, and who checks the attic side?
- Who is responsible for the siding or stucco at the shoulder if it has to be lifted?
A roofer who answers all seven questions in writing has shown you the shoulder before the crew arrives. A roofer who answers them in general terms has shown you the price, not the scope. If you want to talk through a specific gable on your house, the Keys Roofing office can be reached at (314) 220-2333.