Terrace Pavers Over Your Roof Come Up Before the Membrane Does

A rooftop terrace on a Ladue house sits on a membrane, so the pavers and pedestals must come up first and go back in writing.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A terrace on a roof over a Ladue bedroom or sunroom usually looks like a patio from the yard. Under the pavers it is a roof. Someone has to lift the stone, pull the pedestals, and expose the membrane before the tear-off can start, and that work is easy to leave out of a bid because the homeowner only sees the finished surface.

What sits between the paver and the deck

On a typical raised paver terrace the layers from the top down are the pavers, the pedestals or a sand-and-mortar bed, a drainage mat or board, a protection layer, the waterproofing membrane, and then the roof deck. Each layer has its own job. The pavers shed rain to the drains. The pedestals hold the paver plane above the membrane so water can run underneath it. The membrane is the actual roof. Some terraces are built with the pavers set directly on a mortar bed, and those are harder to lift cleanly because the mortar bonds to the stone.

The point for a homeowner is that the terrace surface and the roof membrane are two separate items with two separate lives. The membrane may be due for replacement in twenty years while the stone is still sound, or the stone may crack in a February freeze while the membrane is fine. A bid that says "replace roof" without naming the terrace layers leaves the crew guessing where the roof stops.

Why freeze and thaw changes the lift

St. Louis winters push water into every joint of a paver deck. When the water freezes it expands, and when it thaws the stone can sit slightly higher than it did in the fall. Over several cycles the pedestals can shift and the pavers can rock. Some owners notice a hollow sound when they walk the terrace, or a paver that will not sit flat. Those signs usually mean the drainage layer has clogged with leaf litter and fine sand, so water is standing on the membrane rather than running off it.

That matters on tear-off day. Pavers bedded through several freeze-thaw cycles often come up in pieces, and the sand under them is often wet. A crew that expects to lift stone in a dry week and finds a soaked bed will need more time and more handling. Ask each roofer how they plan to lift the stone, where they will stack it, and whether the pavers will be counted as they come up. Pavers that break in handling are a cost, and the bid should say whether they are replaced and by whom.

The terrace has to come off in order

Terrace work runs in a sequence that a crew cannot skip. The pavers come up first, then the pedestals, then the drainage layer, and only then can the old membrane be cut back and removed. If the crew starts pulling the old membrane while stone is still on top, the stone falls and the membrane tears. If the stone comes up before the drainage layer is inspected, nobody sees where the water was going.

Ask for the order in writing. A reasonable written sequence names the day the pavers come up, the place they will be stacked on the lot, the day the membrane is exposed, the day the deck is checked for soft spots, and the day the new membrane is inspected before the terrace is rebuilt. The same sheet should say which steps belong to the roofing crew and which to a paver or landscape contractor, since many homeowners hire those trades separately.

Who owns the rebuild

This is the question that most often goes unanswered. A roofer can replace the membrane under the terrace. A mason or landscape contractor can reset the pavers. The bid has to say who does each part, who pays for the pedestals and the drainage mat, and who is responsible if the rebuilt terrace leaks at its edge. Once the membrane is back, the paver contractor is working on top of a roof, which is a different job from setting a patio slab on grade.

Check the membrane warranty too. Some membrane makers require their own drainage layer or a specific paver system for the warranty to hold. A rebuild that uses a different pedestal or a different drain outlet can void coverage without anyone saying so. Ask the roofer to name the membrane product and to confirm in writing that the terrace rebuild uses the parts the warranty lists.

The permit question

A terrace on a roof can change what the permit covers. A rebuild of the surface may look like cosmetic work, but the membrane under it is part of the building envelope, and the load of stone and pedestals on the deck counts as well. Ladue is a city of its own inside St. Louis County, so ask the city's building office, not the county desk, whether the terrace work needs to be listed on the roof permit or pulled separately. Get the answer in writing, with the name of the person who gave it and the date.

Ask also whether the deck can carry the terrace load after the rebuild. An older Ladue house may have a framed deck designed for a roof, not for stone on pedestals. A roofer is not the right person to judge the framing, so the bid should say whether an engineer's letter is needed and who orders it.

What to ask before you sign

  • Which terrace layers are in the bid, from the pavers down to the deck, and which are excluded?
  • Who lifts the pavers, counts them, stacks them, and replaces the broken ones?
  • In what order will the pavers, pedestals, drainage layer, and membrane come up, and who signs off on each step?
  • Which membrane product is named, and does its warranty require a specific pedestal or drain?
  • Does Ladue's building office want the terrace work on the roof permit, and who will confirm that in writing?
  • Who pays for an engineer's letter if the deck framing is in doubt?

Keys Roofing can put a written scope with photos and measurements of each terrace layer in your hands before the crew starts. The office line is (314) 220-2333.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.