An older house in Ladue often has a window in the gable, a transom over the front door, or a landing window on the stair that holds leaded or stained glass. Those panels sit close to the roof edge, which is also where the crew sets its ladder, lands its bundles and drops the first tear-off debris. A roof bid can list shingles, underlayment and flashing line by line and still say nothing about the glass a few feet from the work. This page covers that gap and what to settle before the crew stages anything.
Town roofing
Many of the older houses in Ladue have steep gables, dormers and entries with a decorative window set high in the wall. The glass in those openings was often set in lead came, a soft metal channel that holds each piece, and sealed with putty against a wood sash or a stone surround. Lead came bends under load. Putty dries and cracks over decades of freeze and thaw. A panel that has held for eighty years can loosen after a single hard shake, which is why the age of the glass matters as much as the age of the roof.
The St. Louis climate adds to the risk. Hail season brings stones that can crack an exposed pane, and a storm that rattles a shingle loose can also rattle a sash. In winter, ice on the eave can push water behind the trim that holds a panel's frame. None of that is new information, but a roof replacement is the one time in a decade when a crew is standing next to that glass for days with a ladder, a dumpster and a stack of shingle bundles nearby.
Ask your roofer to walk the exterior of the house with you and mark every window within reach of the crew's ladder path. Note which ones have leaded or stained glass, which have an interior or exterior storm panel, and which sit directly above a planned staging area. That walk tells the crew where the risk starts before anyone unloads a truck.
What the glass needs before the tear-off
Leaded and stained glass is not the same as a standard insulated window. The panel is held by its came and its putty, not by a vinyl frame that can be unclipped in a minute. A roofer working from a ladder should not be asked to remove or lift these panels, and the bid should say so. The glass is normally protected in place, with a rigid cover fastened outside or inside the opening, and the cover is removed only after the roof work nearby is done.
Protection has three parts. The first is a cover that keeps falling debris, grit and tools off the glass. The second is a clear rule about who installs and removes that cover, and when. The third is a plan for the period after the work, when the crew has left and the glass has to be checked for new cracks, loose came or displaced putty.
Some panels also have a protective exterior layer added in an earlier repair. That layer can be scratched by a ladder rail or a shingle edge, so the crew should know it exists before the first climb. Settle this in writing so the ladder does not find the glass first.
Name who covers, who removes and who repairs
A bid that protects the glass names three people. The roofer covers the opening and keeps the ladder and staging away from it. A glazier, who is a separate trade, handles any repair to the leading, the glass or the putty. You, the homeowner, decide whether the glazier is booked and who pays for that work. A roofer cannot make a glazier's repair a line item in a roofing scope and then keep the scope open, because the glazier's work has its own price and its own schedule.
- The roofer names who installs the exterior cover on each stained or leaded panel, and when it comes off.
- The roofer names the ladder position for every gable and transom in the drop zone, and says which ones will not be used.
- The roofer says who removes any interior storm panel, and who puts it back.
- The homeowner names the glazier, or confirms that you will choose one yourself.
- The bid states whether a glazier's visit is inside the roofing price or billed separately.
Vibration, impact and the first day
Tear-off is loud and it moves the house. A pneumatic nailer, a shingle bundle that slides off a staging board, or a pry bar that slips can send a shock through a wall that a gable panel feels. Leaded glass is the most sensitive to this because the came flexes. A pane that moves a few millimeters can crack its putty seal, and the crack may not show until the next freeze.
That is why the first day matters. Ask the crew to start on the side of the house away from the glass, or to work the gable last if the sequence allows it. Ask that the cover be on before the first nail comes off. And ask that the crew stop and call you if a pane sounds different, shifts when touched from the outside, or shows a new line.
Photograph the glass before the crew arrives
A dated photo set is the cheapest protection a homeowner can give a stained or leaded window. Take each panel straight on in good light, then take a close view of the came joints, the putty at the sill and any existing cracks. Use the same camera and keep the originals. Name each photo for its location, such as front gable left or entry transom. Do this before the crew arrives and again after the final walk.
- Each stained or leaded panel, straight on, in daylight.
- The came joints and putty at the sill, close up.
- Any existing crack, chip or lifted edge, with a coin or ruler for scale.
- The exterior trim and sill around each panel.
- The ladder path and the spot where the crew plans to stage.
- The same set again at the final walk, from the same positions.
Keep the set in a folder you control. Your roofer may keep a job photo log too, and both files are useful if a question comes up later. Missouri law (RSMo 407.725) bars a roofing contractor from representing or negotiating a homeowner's insurance claim, so any glass question that becomes a claim belongs with you and your own insurer. Your photo set is the start of that file.
What it costs
The price of protecting stained or leaded glass depends on how many openings are near the roof, how high they sit, and whether the covers are built on site or supplied. A single transom over a front door is a small line. A row of gable windows above a second-story porch is a larger one. Lift access, scaffolding or a rented boom for the high openings can change the number more than the glass does.
Ask each roofer to list the protection as its own line in the bid, not as a sentence under general site work. Ask whether the cover is priced per opening, per panel or per hour. A bid that folds the protection into a general line makes it impossible to compare one roofer's care with another's, and it leaves no line to point to when the crew has finished.
The repair of a cracked or loose panel is priced by a glazier. Ask whether that price is in the roofing bid, whether it is only a referral, or whether it is outside the bid entirely. The answer should be written. A roofer who says the glass is covered by the roof price when the glazier is not in the bid has not answered the question.
What to ask
- Which windows, transoms and sidelights in the house have leaded or stained glass, and which of them sit within reach of the crew's ladder?
- Who installs the cover on each panel, and who removes it, and on what day?
- Will any panel be lifted, moved or unset by the roofing crew, and if so, who is responsible for the reset?
- Where will the ladder stand for each gable and transom, and why there?
- Will the crew work the gable last, and what happens if it has to be done first?
- What does the crew do if a pane cracks, shifts or lets in water during the work?
- Who calls the glazier, who pays for the visit, and is that visit inside the roof bid?
- What does the final walk include for the glass, and who signs for it?