A Ladue house with slate on the main roof and shingle on a wing is two roofs in one quote, even when the bid shows a single total. Slate and shingle have different weights, different tear-off methods, different waste factors and different flashing lines, so a bid that folds them into one square count leaves out the parts that cost the most to get wrong. Before you compare numbers, ask each roofer to split the bid by material and by section.
Many older homes in and around Ladue were built with a mix of materials: natural slate or a slate-look product on the front and main body, asphalt shingle on a porch, a kitchen wing, a garage or a rear addition. The mix is often original, and it is often not obvious from the street, because a wing can be roofed in a dark color close enough to the slate that it looks like part of the same roof. Walk the roof with the bid in hand and label each section by what it is made of.
Why one total hides two jobs
A square of slate and a square of shingle are not the same unit of work. Natural slate is heavy, and each piece has to be set by hand, fastened, and checked for cracks as it goes on. Asphalt shingle goes on faster, comes in bundles, and a crew can carry it in fewer passes. When a roofer writes one price per square for the whole house, the slate line is often understated, because the slower labor sits inside an average built from the easier shingle. Ask for each material priced separately, in its own unit, so you can see which number moved when you compare bids.
Weight matters too. Slate pallets are heavy enough that the crew needs to plan where they sit before the deck is open. Ask each roofer how the slate gets from the truck to the eave, whether by hand, by a hoist or by a lift, and whether that method is in the price. A roofer who says the slate just goes up without naming the method has not decided it yet.
Where the two materials meet
The junction is the expensive part. Where a shingle wing runs into a slate main roof, water has to be turned at a step or a valley, and the metal has to be counterflashed into the slate without cracking it. Ask each roofer what metal will be used at that joint, what gauge it is, and who lays it. Ask whether the old flashing will be reused or replaced, because reused lead or copper that has hardened in place often breaks when it is lifted.
The valley between the two surfaces is a separate line. If the wing meets the main body at a valley, the valley metal and the underlayment under it belong on the bid as their own items. A shingle valley and a slate valley are built differently, and a quote that says valley metal without a material or a width has not described the work.
Check the eave too. Slate often projects differently than shingle at the eave, and the drip edge or starter course has to match each material. A starter strip that runs along the full eave of the wing but stops short of the slate will show up as a gap in the first winter. Ask the roofer to show you, on the bid or on a sketch, exactly where the starter changes.
Town roofing: what to check on the roof itself
Once you know which parts are slate and which are shingle, walk the house from the street and then from the yard. Count the sections and write down the material for each. A wing behind a tall oak may look a different color than it does from the driveway, so a photo from the rear is more useful than a memory of the front. Date the photos. If the roof has been patched, note where the patches are, because a slate patch and a shingle patch need different repairs, and a quote should say which one it assumes.
Ice matters in the St. Louis freeze-thaw pattern. A slate eave that holds snow in January can ice over the gutter line of the wing, and the two materials shed water at different speeds. Ask each roofer whether the eave detail accounts for ice on both sections, and whether the ice barrier runs far enough up the deck to cover the slate and the shingle where they meet. Hail season in spring is another reason to photograph each section separately, since slate chips and shingle granule loss look different and should be recorded apart.
What it costs, and why the split matters
Slate and shingle cost different amounts per square, and the difference is not only the material. Slate work takes longer, the disposal weight is greater, and the flashing is often more involved. A bid that shows one blended price per square can make the shingle wing look expensive or the slate look cheap, depending on how the square count was split. Ask for the square count for each material, the price per square for each, and the flashing and valley lines as separate items. Then compare totals only after you have compared those parts.
Ask whether salvaged slate is reused on the wing or the main roof. Some roofers keep sound slate from the tear-off for repairs, and others haul it away. Either way, the bid should say which, because it changes both the material line and the disposal line. If the roofer plans to reuse slate, ask how many pieces are expected to break during removal and who pays for replacements if the count runs higher than expected.
On the shingle side, Keys installs Atlas and Malarkey shingles only. Ask any roofer which brand and product line their shingle price is built on, and whether the wing shingle is the same product as the rest of the house or a different one. A different product on a wing can be a choice you make on purpose, or a substitute the bid never mentioned.
What to ask before you choose
- Which sections are slate, which are shingle, and which are something else, with each one labeled on a sketch.
- The square count and the price for each material, in separate lines.
- How the slate gets from the truck to the eave, and whether that method is priced in.
- What metal is used at the slate-to-shingle junction, its gauge, and whether the old flashing is reused or replaced.
- How the valley between the two materials is built, with the metal and underlayment named.
- Where the starter course changes from slate to shingle, and how the eave detail handles ice on both sections.
- Whether salvaged slate is reused, who pays for broken pieces, and who hauls the rest away.
- Which Atlas or Malarkey product is on the shingle wing, and whether it matches the rest of the house.
A written scope that answers each of these questions is worth more than a lower total that answers none of them. If a roofer cannot say which sections are slate without walking the roof again, ask for the answer in writing before you sign.
Permits and the city desk
Ask which permit the work needs before the tear-off starts. A roof that changes materials on one section can draw a different review than a straight reroof in one material. Confirm with the city's building permit desk whether the permit lists both materials, and whether the description on the permit matches the bid. A permit that names only the shingle and leaves out the slate can cause a problem at inspection.
Missouri does not license roofers at the state level, so the paperwork for this job should come from the company itself. Ask for the written scope and the sketch, and keep a copy. If the roof turns out to hold more slate than the bid assumed, ask for a written change to the scope before the crew proceeds, not after.