Pigeons like a flat ledge under a roofline. On many brick houses in Ladue the top of a cornice, a stone sill course, or a parapet cap gives them a dry shelf out of the wind, and the owner sees the droppings before the birds. Owners who want the birds off often install a row of stainless spikes or a strand of wire along that ledge. The spikes are rarely mentioned in a roof quote, and they are one of the first things a ladder crew hits when the eave is opened.
This page is for a homeowner who is partway through picking a roofer and wants one fact settled: who takes the spikes off the ledge before the tear-off starts, and who pays to put them back. The answer changes the number on the bid more than most owners expect.
Where the spikes sit on the house
Spikes sit in three places. The first is the top of a cornice, where the crown of a projecting trim board meets the wall. The second is a stone or precast sill course under a dormer or a gable window. The third is a parapet cap or a short brick wall that runs past the roof edge. Each one is attached differently, and the removal work depends on which.
Spikes on a wood cornice are usually screwed or nailed through a base strip into the trim. Spikes on brick are typically set in mortar joints, drilled into the masonry, or glued with a construction adhesive. Wire systems hang from stand-off posts fixed to the top of the masonry. The spikes on a stone sill are the hardest to remove cleanly, because a drilled hole in limestone or cast stone can crack the edge if the drill walks.
Freeze and thaw matters here too. Adhesive that has held through several St. Louis winters can bond to the face of the brick and pull a flake of the face when it comes off. A stand-off post that sat through a few hail seasons may have a loose base that moves when someone leans on it. Neither problem is visible from the driveway, which is why the walk-around should be done with the spikes in view, not from the ground.
Where the crew meets them
A roofing crew reaches the eave with a ladder, a staging plank, or a boom lift, and each of those tools needs a bearing point. On a Colonial with a deep cornice, the top of the ladder rests on the trim or the gutter. When spikes sit on that trim, the ladder either rides over them and cracks the base, or the crew stops and asks the owner what to do. Neither is good for the schedule.
The spikes also collect tear-off debris. Old shingle grit and nails fall into the spike rows and sit there. Pigeon droppings, feathers and nesting material mix into the same gap. When the crew strips the eave, that mix goes into the dump bin with the shingles unless someone plans for it.
Nests and the birds themselves
Before anyone removes a spike or pulls a strand, the crew should check for active nests. Most native birds are covered by the federal Migratory Bird Treaty Act, so an active nest with eggs or young should not be disturbed. Feral pigeons are not covered by that act, but a crew should check for nests before it removes ledge hardware all the same, because songbirds often share the same ledge. Nests on a cornice return are easy to miss from the ground. If a nest is found, the work stops at that bay until the birds have left, and the schedule moves with it. A roofer who says the birds will be dealt with on the day is not giving you a date.
Ask the roofer, in writing, who does the nest check and when. The answer should name a person, a time before the ladder goes up, and what happens if a nest is found. If the answer is that the crew will look as they go, the bid has no line for the stop.
What to write into the bid
A roof bid that leaves the spikes out is leaving a removal and a reinstall out. The bid should say which of three things happens to each spike run.
- Removed and kept by the owner. The crew takes the spikes off, bags them, and sets them aside in a labeled spot. The owner decides whether to reinstall them.
- Removed and reinstalled. The crew takes the spikes off before the tear-off and puts the same type back on the same ledge after the new roof is set. The bid should name the reinstall as its own line.
- Removed and not replaced. The owner has decided to leave the ledge bare. The bid should say who fills the screw holes or mortar gaps and with what material.
Each of those options has its own cost. Removal is a labor line, because it takes a person on a ladder or a lift. Patching holes in brick or cornice is a masonry or carpentry line. Reinstalling spikes is another labor line plus materials. None of those should hide inside a single lump sum for the roof.
Questions to put to each roofer
- Who removes the spikes, and are they employees of the roofing company or a subcontractor?
- Is the removal part of the roof price, or a separate line, and how is it priced?
- Who checks for active nests, and what happens to the schedule if one is found?
- Does the crew take photos of the ledge before and after the spikes come off?
- Who patches the holes in the cornice or brick, and does that patch match the existing paint or mortar?
- If a spike base cracks during removal, who pays for the repair, and is that written down?
- Where do the removed spikes go while the roof is open?
Ask each roofer the same list and compare the answers in writing. If one bid says the spikes are included and another says they are not, the difference is the whole gap in price, and it is not a difference in roof quality.
Before the ladder goes up
Walk the ledge with the roofer before the crew arrives. Stand on the ground, count each spike run, note the attachment type you can see, and take a dated photo of each section. If you have a spare mount, a bracket or a bag of the old screws, keep them for the reinstall. Owners often lose track of what was on the ledge after a few years, and the photo is the only record that shows the spacing.
The bird count is part of the same walk. If you see droppings on the sill below an active spike run, tell the roofer that the birds are using the ledge now. That fact can change the timing of the removal, because the crew may need to wait for a nesting cycle to finish. It is a fact to put in writing, not a fact to hope the crew notices.
The ladder will land where the spikes are, so the spikes have to come off first. Put the removal on the roof schedule as its own day, or as the first step of the tear-off. Then the crew can set the ladder on the trim, and the trim is still there to hold it.