Oil Paintings on Your Upper Walls Need a Crate Plan Before Roof Day

Oil paintings on upper walls need a named crate plan, a holding room and a move date set before the tear-off starts in Ladue.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Upper walls in a Ladue house often carry more than paint. Family portraits, framed prints and the oil paintings bought for a particular room hang on plaster or drywall at the height where a tear-off does its work. When the old shingles come off, the crew's hammering, the scrape of the bar along the deck and the thump of bundles carried across the attic floor all travel down through the framing. Dust from the tear-off finds the gap behind a frame. A painting that has hung untouched for years can tilt, and a wire hanger can slip off its nail. None of this is dramatic, but it is common enough that the bid should say who handles it before the first nail comes out.

Why oil paintings need their own line

A framed oil on canvas is heavier than a print and more sensitive to movement. The canvas can flex inside its stretcher, and old varnish can craze if the piece is struck or left in a warm spot. Works on paper, pastels and photographs are more vulnerable to dust and to moisture. Ask the owner which pieces are original works, which have been appraised, and which have a documented history. Those are the pieces that need a crate plan. The plan costs money whether the roofer handles it, a fine art handler does, or the homeowner's own movers take it on.

Photograph every piece on its wall before anything moves. Note the hanging hardware, the type of wire, and where the picture hook sits in the plaster. If a piece is removed for the tear-off, that record is what shows it was in good condition on the day it left the wall.

Who moves them, and where they wait

There are three common arrangements. The homeowner removes the pieces and stores them in a room away from the attic path. The roofing crew moves them under a written procedure. Or a third party does the crating. Each has a different cost and a different chain of responsibility. What matters for the bid is that the answer is written, names a person, and says where the pieces will wait. "We will be careful" is not an answer.

A spare bedroom, a closet with a door that shuts, or a finished room on the lowest floor is usually the right holding place. Keep the room dry and out of the path of the crew's ladder and material staging. Natural light from a tall window or a skylight can fade pigments over days, so keep the blinds closed in the holding room. Cover each piece with acid-free paper or a clean sheet, and stand it upright. Never stack one piece flat on top of another, and never lean a canvas against an exterior wall where the afternoon sun comes through.

The move day deserves its own date. Set it for the day before the tear-off begins, so the pieces are off the walls, wrapped and in the holding room before the first shingle is pulled. If the crew starts early and the paintings are still up, the shaking of the first morning is when a hook is more likely to let go. That is a scheduling question, and it belongs on the contract's start line, not in a text message on the morning of the job.

Humidity during an open roof

St. Louis has a humid summer and a dry, cold winter, and an open roof matters in both. A tear-off that starts in July can leave the attic hot and damp in the afternoon if the deck is open to the sky. A tear-off that starts in late November can leave the upper floor dry while wind pushes cold air through the attic. Either way, the air in the upper rooms changes while the deck is open. Ask the roofer how long the deck will stay open on a typical day, and how they cover it when rain is forecast. That answer also tells you how quickly a painting in the holding room could see a sudden swing in humidity.

Keep the thermostat steady during the work. If the furnace has a humidifier, ask whether it will run during the tear-off. Tear-off dust pulled into a duct can settle on a canvas surface, and the return vents are a separate line that belongs in the same conversation.

Ask each roofer these questions

  • Who removes the paintings and frames from the upper walls, and who signs for them?
  • Where will each piece wait, and which room is it in?
  • Is the crew working over that room, or is the holding room away from the attic path?
  • What happens if a hanging wire fails during the move, and who repairs the wall?
  • Will the crew take dated photos of each wall before anything comes down?
  • Who rehangs the pieces after the final walk, and who checks them level?

Plaster, picture rails and the wall repair

Older Ladue houses often have plaster over wood lath. Pulling a large hook from plaster can crack the surrounding area, and a plaster crack that opens under a hanging frame is easy to miss until the frame is back up. If a painting hangs from a picture rail, the rail may come down for the tear-off too. Name who patches each nail hole and who paints the patch. A patch painted over before the house is clean is only a cover. Ask for the patch and paint to be done after the final walk, when the dust has settled, so the new paint does not pick up grit.

Where the paper goes

A written note that lists each piece, its location before the work, and its holding room belongs in the job file alongside the scope. Keys Roofing can be reached at (314) 220-2333, and questions about how valuable items will be handled can be raised there before a bid is signed. If the contract does not mention the paintings, ask for a written line before the crew arrives. A verbal promise made on the first walk is hard to check on the afternoon the trucks pull in, and a line in the signed scope is something you can point to later.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.