A range hood that moves a lot of air is a roof question before it is a kitchen question. When a hood exhausts more air than the house can replace through the small gaps around doors and windows, the kitchen goes slightly negative, and the house pulls air from wherever it can reach. In a tight St. Louis house that often means the attic, a chimney chase, or the gaps around a bath fan. A make-up air intake is the fix: a dedicated opening that brings outside air in while the hood runs. On many homes that opening is a cap on the roof, which means your roof bid has a new hole in it.
Where the intake usually sits
Make-up air can enter through an exterior wall or through the roof, and the right location depends on the kitchen layout, the duct run, and what is above the hood. A roof intake is often the easiest to route from an upper-floor kitchen or a ceiling-mounted unit, but it has to be flashed like any other penetration. The duct passes through the deck, the cap sits above the shingles on a curb or raised base, and the flashing has to lap the courses correctly on the uphill and downhill sides. If the intake is set near a valley, a dormer cheek, or a step in the roof, the flashing gets harder, and the bid should say so in writing.
Ice matters here too. In a St. Louis winter, a cap set low on a north slope can collect snow and ice, and repeated freeze and thaw cycles can push meltwater under the flashing if the base sits too close to the shingle edge. Ask where the cap sits relative to the eave and the nearest valley. If the roofer shows you a cap set right at a course line with little or no height above the shingle surface, that is a question to settle before the contract is signed, not a detail to sort out at the final walk.
What the bid has to name
Most roof bids say vent or penetration and stop there. For a make-up air intake, the bid should name four things: the cap type, the curb or base height, the flashing material and its lap order, and the duct size and wrap where the duct passes through the attic. Each one affects both the price and the leak risk. A cap sized for a different airflow can also be too small for the hood it is meant to serve, and that mismatch often shows up only after the kitchen has been in use for a season.
The bid should also say who installs the duct. In many houses the mechanical contractor runs the duct and the roofer cuts the deck opening and flashes the cap. That split is normal, but it only works when the two scopes meet at a written point. Ask each roofer whether the flashing waits for the duct, whether the cap is set before the duct is connected, and who checks the connection before the roof is closed in. A roofer who answers that the mechanical contractor handles it has not answered the question.
Questions for each roofer
Put these questions to each roofer in the same words, and write each answer beside its question so the replies can be compared.
- Where is the make-up air cap on the roof plan, measured from the nearest eave and the nearest ridge?
- What is the curb or base height above the shingle surface, and what material is the flashing?
- Does the flashing lap the upper courses, the lower courses, or both, and in what order?
- Who cuts the deck opening, and who sets the cap?
- Who checks the duct connection before the roof is closed in, and when?
- Is the cap and flashing priced as its own line, or folded into the general roof number?
When the intake belongs on a permit
Make-up air is a mechanical item, and most jurisdictions handle it through a mechanical permit rather than the roofing permit. The threshold that triggers the requirement depends on the code edition the local permit desk applies, and many residential codes begin the discussion somewhere near 400 cubic feet per minute of exhaust. Do not rely on a roofer's memory of that number. Ask the permit desk directly, or ask your roofer to write down which code edition the bid assumes. If the roof is being replaced at the same time, the intake penetration may need to appear on the roofing permit drawing, and a roofer who has not read the mechanical plan cannot tell you that from the sidewalk.
Keys Roofing writes any penetration like this into the written scope with a photo and a measurement, so the homeowner holds the same page the crew works from. That page is only as useful as the questions behind it, which is why the answers above belong on it before the crew is scheduled.
What to do before the crew arrives
Walk the kitchen and the attic with the mechanical plan in hand, and find where the hood duct runs. Photograph the attic along that route with the date showing in the frame. Mark the intended cap location on the outside of the house so the roofer can match it to the roof plan. If the cap will sit near a chimney, a bath fan, or a second intake, write the distance down. Then call the office at (314) 220-2333 and ask for the make-up air item in writing before a start date is set. A start date is not firm until the duct, the cap and the flashing have all been named on the same page.
Bring the notes to the second visit, not the first. The first visit is for the hood and the kitchen. The second is for the roof, where the cap, the curb height and the flashing lap can be checked against the photos you already have.