If your Ladue house has a limestone coping on a parapet, a stone sill under a gable window, or a run of cut stone along the eave, the roof job will touch it. The crew needs to stand on the edge, lift the old shingles at the rake and the eave, and set a ladder against the wall. Each of those steps can crack a sill, knock a coping stone loose, or shift a piece that has sat in the same place for decades. Before you choose a roofer, you need to know who resets that stone if it moves, and who pays to set it back.
Where the stone sits on the roof
Older houses in the area often use cut limestone where a newer house would use aluminum, vinyl or plain wood. A coping is the cap over a parapet or a short masonry wall. It sheds water off the top of the wall so the water does not run down the brick below. A sill is the horizontal piece under a window, and some houses carry a stone band under a gable vent or along the base of a dormer. Each of these pieces meets the roof in a different way. A coping sits on the wall with the roof flashing tucked under its edge. A sill sits under the window and may tie into the flashing at the top of a dormer cheek. A stone band at the eave may carry the gutter hangers, which means the stone is part of the gutter line too.
The roof question is not the stone itself. Limestone is heavy, it chips at the edges, and it is often bedded in mortar that has softened over the years. When a roofer lifts a row of shingles at the top of a wall, the stone above that row can move. When a crew walks the edge of a low section, the weight of a person can shift a coping that was never meant to take a load. The question for you is whether the bid treats that movement as a roof item or as a stone item, and whether anyone has written down the condition of the stone before the first shingle comes off.
What the crew can break
Three things tend to go wrong on a stone-edged roof. The first is the joint. Old mortar between coping stones can be cracked or missing, and a stone that looks solid may rock when a ladder hits the wall beside it. The second is the flashing. Metal that was tucked under a coping decades ago may have gone brittle, and pulling it free can tear it, which leaves the wall open at the exact point where water wants to enter. The third is freeze and thaw. Water that gets into an open joint in late fall freezes in January, and a stone that was already hairline-cracked can split along that crack. St. Louis winters cycle through freezing and thawing many times in a season, so a small gap can widen quickly if an open roof sits through a cold stretch.
None of this means the stone will fail on roof day. It means that without a dated record, nobody can tell later whether the crew caused a crack or whether it was there already. That is why the photos matter. Before the crew arrives, walk the stone with your phone. Photograph every coping joint and every sill end from two angles, include a small object for scale, and keep the files with the date stamp on. If a joint is already open, note its width in the photo name. A set like that is the difference between a discussion about what happened and a guess.
Who resets the stone
A reset is usually a separate trade. A roofer works in shingles, underlayment, flashing and metal. A mason sets stone, repoints joints and rebuilds mortar beds. Some roofers keep a mason on call and some do not, and a bid can say either. What matters is that the bid names the party responsible. A sentence that says the roofer will reset a moved coping is a different promise from a sentence that says the roofer will protect the coping and report any movement in writing. Both are different from a bid that says nothing about stone at all, and silence on that point is where disputes start.
Ask whether the reset is in the roof price or priced separately. A coping reset that involves relaying a few stones and fresh mortar can take a mason a full day, and some mortar work needs a second visit after it cures. A roofer's bid may cover the flashing under the stone without covering the stone or the mortar above it. If the roof price is the only number on the page, the stone reset is probably not in it, and you should find that out now rather than after the stone has shifted.
Town roofing
Ladue has many houses with long roof lines, deep eaves and masonry details built to last with far less attention than a newer house gets. That history is useful when you talk to a roofer. Ask which stone details on your house the roofer has worked around before, and what they did with the flashing under a cut coping when the mortar had already let go. Listen for specifics. A roofer who has handled stone edges will describe the sequence of lifting, protecting and resetting in plain steps. A roofer who has not will often say the stone is outside the scope and move on quickly, which is useful to know before you sign.
Check the permit side as well. A roof permit in St. Louis County covers roof work, and a stone or masonry repair can be treated as a separate item by the permit desk, depending on what is changed. If the stone reset adds masonry to the job, ask the roofer to say in writing which permit covers which work. That keeps the inspection from stalling on a detail nobody listed. Missouri does not license roofers at the state level, so the written scope is where the job's boundaries have to be set.
What it costs
Expect the stone line to be priced on its own. A roofer can price the tear-off and the new roof per square, and that number belongs in the roof bid. A coping reset is usually priced by the linear foot or by the stone, plus mortar and mason time, and that number belongs on a separate line. A sill reset under a single window is a small job, but it still needs a mason's visit and a safe way to reach the sill. Ask the roofer to show the stone reset as its own item with a unit and a quantity, so you can compare it fairly between bids.
Do not accept a round-number allowance without a description behind it. An allowance line that says stone repair as needed, at a flat figure, tells you the roofer has guessed, and it does not tell you what happens if the stone needs more work than the figure covers. Ask what happens when the reset runs past the allowance, who approves the extra work, and whether that approval has to be in writing before the mason starts. A clear answer to that question is worth more than a lower total that leaves the stone open to interpretation.
What to ask
Put these questions to every roofer you are comparing, and write down the answers in the same words so the bids can be read side by side.
- Which stone details on my house will the crew work around, and where does each one sit on your drawing?
- Who resets a coping or sill that moves during the tear-off, and is that party named in the bid?
- Is the stone reset in the roof price, or priced on its own line with a unit and a quantity?
- Does the reset need its own permit line, and who applies for it?
- How will the stone be photographed before the crew arrives, and will I receive the dated set?
- If a joint cracks during a freeze before the reset is done, who covers the opening, and who keeps the roof sealed until the mason returns?
Keys Roofing can walk the stone with you before the crew is scheduled and put a written scope in your hands, with photos and measurements of each stone detail the roof touches. Keys documents the condition of the stone and attends as the roofing contractor on the day the work happens. For a Ladue house with cut stone at the edge, call (314) 220-2333 before the roof date is set, so the stone line is written into the bid before the first shingle comes off.