Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

Japanese Maple Limbs Are Thin, So Name Who Trims Them Before Roof Day

A Japanese maple by a Ladue eave needs a trim line, a ladder rule and a cleanup owner written into the roof bid before the crew arrives.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A Japanese maple near the house is a common sight on Ladue lots. It often stands beside a front walk or a side entry, where its finely cut leaves show well from the street. On roof day it creates problems a crew sees within the first hour. The limbs are slender, the trunk is often divided into several stems, and the roots run close to the surface. A ladder set against the eave, a stack of shingle bundles, or a dumpster swung too near the trunk can break a limb or crush the root flare, and the damage may not show until spring. Settling the maple before the crew arrives is a small decision that protects the tree and keeps the staging area clear.

Town roofing

Ladue houses sit on lots where the trees were planted long before the roof was last replaced, and many properties carry a mix of oaks, maples, and ornamental trees. Japanese maples are usually chosen for their shape and color rather than their size, so they often end up in spots where a roofer needs room. A low limb that reaches across the ladder path tends to be the first casualty, because it hangs right where a ladder wants to rest against the gutter line.

The freeze and thaw cycle adds a second concern. St. Louis winters push water in and out of the soil and the bark, and a maple already stressed by a wet spring recovers slowly from foot traffic and compaction in the drip zone. The roof crew does not need to walk under the canopy to do its work, but it does need a clear path from the truck to the eave. Keys Roofing can plan the staging area around the tree, but the homeowner decides whether any limb comes off before the start date.

The city's building department handles the roof permit for work on the house. A tree trim is a separate question. Before any limb is cut, ask the city whether the particular tree or its location triggers any notice or review, and do not assume the roof permit covers it. The same check applies to removing a tree near the foundation, because a removal can change the root zone under the staging path.

Hail season adds a reason to look at the tree before anyone climbs. Thin bark and light limbs take damage from hail, and a cracked limb hanging over the roof is a safety problem before it is a paperwork problem. If a storm has already opened the canopy, photograph the tree from several sides, with the date and the location, before the crew cuts anything. A dated set of photos is the record of what the storm did. Missouri law (RSMo 407.725) bars a roofing contractor from representing or negotiating a homeowner's insurance claim, so any conversation with an insurer about storm damage to the tree belongs with the homeowner and the insurer. Keys documents the roof damage it can see, and it puts a written scope with photos and measurements in the homeowner's hands.

What it costs

A trim line is usually a small part of a roof bid, but it is still a line that should be written down. Ask whether the price includes cutting the limb, hauling the cut wood away, and cleaning up the seed and leaf debris that falls during the tear-off. Maple seeds and fallen leaves wash into gutters and collect in valleys, and the bid should name who clears them and on which day. If the crew does not do tree work, the homeowner may need to hire an arborist separately. That invoice belongs on the homeowner's list of costs, not hidden inside the roof total.

Ask also what happens if the trim goes wrong. A cut limb that falls onto a fence, a car, or a neighbor's property becomes a liability question quickly, so ask each roofer for a current certificate of liability insurance before the crew enters the lot. A bid should not treat a tree job as included unless the bid names it.

Two more costs are easy to miss. If the crew must carry bundles around the trunk instead of rolling a cart straight to the eave, the extra time belongs in the labor line. And if the roofer must move a stone border, a garden bed, or a bird bath to reach the eave, that move belongs on its own line.

  • Trim the maple before the crew arrives, or name the exact limb to be removed in the bid.
  • Price the haul-away and the cleanup as their own lines, not folded into labor.
  • Mark the root zone on the lot sketch so no pallet, cart, or dumpster sits on it.

What to ask

Ask each roofer these three questions in writing, and keep the answers beside the questions they answer.

  1. Where will the ladder rest, and which branches will it pass on the way up?
  2. Who cuts any limb that must come off, and who pays for an arborist if one is needed?
  3. Who clears maple seeds and leaves from the gutters, valleys, and lawn after the tear-off?

Compare the answers, not the confidence behind them. A roofer who says the tree is no concern should be asked to show the ladder line on the sketch. A roofer who says the crew will work around it should be asked what that means for the bundles and the dumpster. The answer that can be checked is the one drawn on paper and dated.

If you plan to keep the maple, ask whether any trim will happen before the start date and why. A dense canopy over a north-facing slope keeps the deck damp for longer, and a damp deck is a problem for a clean nail line. Ask the crew whether it will check the deck for moisture on the morning of the start, and whether that check is priced into the bid or left as an assumption.

Finally, ask whether the roofer will photograph the maple before the first nail goes in. A photo taken on the morning of the start shows the tree's shape, the trunk flare, and the limbs over the roof. That image is useful to the homeowner if a dispute arises about a broken limb, and it is useful to the crew because it fixes the ladder line before anyone climbs. Keys Roofing can be reached at (314) 220-2333 to talk through the staging plan before a date is set.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office