Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

Horse Chestnut Husks Land Where Your Roof Crew Walks

Horse chestnut husks are spiny and the nuts roll into gutters, so name who clears them before a Ladue tear-off starts.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

In a Ladue yard, a horse chestnut or an Ohio buckeye usually stands where the owner wanted shade, which often means close to the house and within reach of the eave. Each fall the green husks turn brown and split, and the glossy nuts drop onto the lawn, the walks, the drive and the roof. A roof crew uses those same spots when a tear-off starts. This page covers what a Ladue homeowner should settle with each roofer before a start date is set, so the crew does not discover the nut drop on the first morning.

Town roofing

The timing matters as much as the tree. The nuts fall in the weeks when the St. Louis roofing season is winding down, and a job that starts in late October or early November can land on a lawn that is still covered. The husks are the first problem. They are soft and spiny when they fall, and they break apart into pieces that work into turf and stick to boot soles. Ladders go on the lawn, the trailer sits on the drive and the crew walks the side yard to reach the back slope. Every one of those paths collects husks, and the crew carries some of them onto the house floor if no one clears a route first.

The nuts create a separate problem on the roof itself. A nut is heavy enough to roll down a low pitch and settle in the gutter trough, where it can sit against a downspout outlet. Through a freeze-thaw cycle, wet debris in an outlet can freeze and hold water back at the eave. In a St. Louis winter that shows up as a stain on the soffit or a drip over a door, and the homeowner often traces it back to a gutter that was never cleared. Clearing the troughs before the tear-off starts keeps that question from showing up later.

A shingle roof also takes the nuts on tear-off day, when the old shingles, nails and edge metal come down into the trough. Nuts mixed into that debris slow the cleanup and add bulk to the bin. The roofer does not need to remove every nut from the lot, but the bid should say which nuts the crew sweeps and which ones are the homeowner's to pick up.

Before the crew arrives, walk the lawn with the roofer's lead person and mark the paths the crew will use. Flags on the walks, a rope across a planting bed and a clear line from the drive to the ladder spot cost little and prevent a good deal of the trouble. Ask whether the crew will sweep the staging lanes at the end of each day. Some roofers do that without being asked, and others leave it until the final walk, when the homeowner has already seen the lawn in its worst state.

What it costs

A horse chestnut does not add a line to the roof price by itself, but the clearing around it does. The cost of sweeping husks and nuts off the lawn, the walks and the trough usually sits in one of three places: inside the tear-off labor, as a separate sweep and haul line, or as a homeowner task that the bid assumes will be done before the start date. None of the three is unusual. The problem comes when a bid shows none of them, and the homeowner learns at the final walk that the lawn was never part of the number.

When a sweep is priced, ask how it is measured. An hourly sweep can run long on a large lot, especially when the crew has to work around planting beds. A sweep priced by the load depends on how many loads the dumpster or trailer takes, and the homeowner should know whether the dumpster line already covers the husks. A fixed sweep number is simpler to compare, but it still has to state the area it covers. Put each sweep line on the same sheet as the other bids so the numbers can be compared directly.

A gutter clean before tear-off is its own choice, and it is not always priced the same way. Some roofers clear the trough during the tear-off because the old debris lands there anyway. Others expect the gutters to be clean before the crew arrives and will not clear them without a separate line. Either approach can work. What causes trouble is an assumption that one side will do the work when the other side has not agreed to it. Write down who clears the gutters, and whether that is a number on the bid or a task the homeowner takes on.

A roof bid's square count does not change because a tree dropped its load. Ask each roofer to show the sweep as a line of its own, not folded into the roof area. That keeps the comparison honest, because two quotes can carry the same roof size and still hold very different cleanup assumptions.

What to ask

Put these questions to each roofer before you sign, and ask for the answers in writing. A roofer who answers all six plainly has usually already thought about the lawn.

  1. Who clears the husks and nuts off the lawn, the walks and the drive, and on which day does that happen?
  2. Is the sweep a line on the bid, and if so, is it priced by the hour, by the load or as a fixed number?
  3. Where will the ladders, the trailer and the shingle pallet sit, and does any of that spot fall under the tree?
  4. Will the crew walk the lawn with me before the start date, and who marks the paths?
  5. Who takes the husks and nuts away, and is the dumpster or hauling charge already in the bid?
  6. If nuts or husks end up in a downspout after the install, who clears them, and is that visit priced?

Keys Roofing installs Atlas and Malarkey shingles, so ask for the product line by name in the bid and check it against the pallet when it arrives. If an answer on this list stays vague after one follow-up, ask again in writing and keep the reply with the bid. The Keys office can be reached at (314) 220-2333, and a written answer on the lawn, the gutters and the staging spot is a reasonable thing to request before a start date is set.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office