A holly planted close to the house is one of the few shrubs that brings two problems to roof day at once. The leaves are stiff and spined, so a crew working along the eave gets scratched through gloves and snags on tarps and cords. The berries, on female plants, ripen red in fall and hang on into winter, then drop and stain walks and steps. Neither problem is large on its own. Both need a named owner before the crew arrives, because a roof bid that says nothing about the shrub leaves the crew to decide on the day.
Where the holly sits against the house
Walk the wall first, on a dry day if you can. Measure how far the outer branches reach past the drip edge and how close the top of the hedge comes to the lowest course of shingles. A holly that stops a foot short of the fascia is a different job from one that has grown into the gutter. If branches touch the gutter, the crew will be working through them to reach the eave, and the trough may need to come down before the new one goes up.
Note where the hedge turns the corner of the house. Many holly plantings wrap a corner, and that corner is usually where the ladder lands. Mark the ladder point on your sketch so the trimmer and the roofer are looking at the same spot. If the holly sits over a buried sprinkler line or a water spigot, write that down too, because the crew will not know it is there.
Moisture at the lower courses
A dense hedge that grows tight to the wall keeps air from moving across the lower courses and the fascia, so the wood and the starter strip stay damp longer after a rain. The effect is slow and easy to miss. The concern is not a leak that shows up in a week. It is a lower edge that takes longer to dry each spring, and a crew that finds the wood damp when it strips the old eave. Ask whether the roofer plans to check the fascia and the rafter tails for moisture when the old eave comes off, and whether that check sits inside the bid or gets billed later as an extra.
Fallen holly leaves also lodge in the lower valleys and in the gap where the gutter meets the shingle edge. Leaves that stay wet there hold moisture against the roofing for days. A cleanup that happens only once, at the end of the job, does not fix that. Ask how often the crew will clear the eave during the job, and whether that clearing is part of the daily work or a single line at the end.
The trim line, written as a date
A trim is not the same as a removal. Some homeowners want the holly cut back to a clear band a few feet from the wall so the crew has room to stand and stage shingles. Others want it pulled out and replaced after the roof. Each choice has a different cost, and the bid should say which one it assumes. If the roofer's number assumes a clear band and the trimmer has been hired for light shaping, the crew will stop on the first morning to wait for the rest of the cut.
Set the trim date at least a week before the scheduled start. A holly trimmed hard on the day of the roof leaves a lot of loose leaves on the lawn, and the crew's first hour goes to clearing them from the ladder path. A trim on a dry day is also easier to rake than one on a wet day, since wet leaves cling to the grass and the walk.
The berry cleanup
Berries on a female holly fall in late winter and early spring, and in some years they stay on the plant until the birds take them. A roof in January or February can land on a yard where the berries are still on the branch, and a roof in March can land on a yard covered in fallen fruit. The stain on concrete is real, and it does not always rinse off with a garden hose. Ask who sweeps the walk and the steps, and ask whether that sweep is done at the end of each day or only once at the end of the job.
Berries also reach the gutter trough. If the hedge sits under the eave, the berries land in the trough and the first rain carries them toward the downspout. Put a gutter clean-out on the list for the day the roof is finished, and ask who does it.
What the bid should say
Write four lines into the roof bid, and ask the roofer to repeat them back to you in their own words before you sign. First, who trims the holly and when. Second, who hauls the cuttings away and where they go. Third, who sweeps the berries and leaves from the walk, the steps and the gutter trough, and how often. Fourth, who replaces any branch or plant that a crew member breaks while moving a ladder.
Keep the list short. A roof bid with four clear lines is easier to check than one with a long paragraph about site protection. If a roofer says the crew will handle the shrub without further detail, ask for that in writing, with the words cut, haul and sweep attached to a named person and a named day.
Questions to ask on the walk-through
- How far from the wall will the crew need a clear band to set the ladder and stage shingles?
- Is the trim included in the number, or does it come as a separate line from a tree service?
- Who hauls the cuttings, and does that haul sit inside the bid?
- Where do the crew's gloves and tarps go after they have caught on the spines?
- Who clears the gutter trough of berries after the roof is finished?
A roofer who answers those questions without looking at the hedge has not walked the wall. A roofer who walks the wall, measures the clear band and writes the answer into the scope has given you something you can check on roof day.