Gutter-Free Eaves Change the Drip Line, So Name It in the Bid

A bid for a Ladue home with bare eaves has to say where roof water lands, where the ladder stands and who prices a soft fascia board.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

An eave without gutters is a different edge from one with a trough, and most roof bids are written as if every house had a trough. On an older home on a large Ladue lot, the drip line may sit where the shingles stop and the fascia begins, with water coming off the roof at full width and landing on the beds, the walk or the foundation. A bid that says tear off and replace without naming that bare edge leaves the question open until the crew is already on the ladder.

This page is for a homeowner who has two or three quotes in hand and one decision left: whether the bare-eave details are priced and assigned. You do not need to know roofing terms to ask about them. You need the answers written down in the scope.

Where the water lands without a trough

With gutters, water runs to the downspout outlets and leaves the house at known points. Without them, every foot of the eave drops water along the whole run. In a St. Louis winter, that water can refreeze on the walk or at the foot of the wall. The freeze-thaw cycle that works on the region's clay and loam does the same thing at a bare eave. A drip line that stays wet against the foundation through several hard freezes can open the soil beside a stoop or a planting bed, and the damage often shows up in spring rather than in the week the roof is finished.

Ask each roofer to say where the water is expected to fall once the new edge is on, and whether that point is a gravel bed, a brick walk, a patio or a planting. A written answer helps you compare the bids. A general statement that roof water runs off does not tell you anything you can hold a crew to.

What the crew changes on the edge

A bare eave needs a drip edge, and the bid should name the piece. Drip edge is a metal flange that carries water past the fascia and out into the air below the shingles. Where the old roof had a gutter, the fascia behind it may have been built to be hidden, and some older fascia boards were never meant to take weather on the exposed face. The crew may find that the board behind the metal is soft once the old shingles lift off, and that finding changes the day's work.

The bid should also say what happens to the soffit and the rafter tails at the edge. Those are the parts the crew sees first when the shingles come off. If the bid says nothing about them, ask who decides on repairs, who prices them and whether the crew will stop to call you before it replaces anything.

Ladder placement at a bare eave

A roof with no gutters gives the ladder a clear bearing point at the eave, but the crew still needs firm footing. On a Ladue lot with a planted bed, a stone border or a side yard that slopes toward the house, the ladder may stand in the mulch, on the stone or on soft ground after rain. Ask each roofer where the ladder will stand, what gets protected under it and whether the crew will move a shrub or a bench before the first climb. The answer belongs in the scope, not in a remark made at the curb on the day the crew arrives.

If you have a hedge or a flower border under the eave, decide before the crew comes whether it is covered, moved or cut back. That decision affects the labor on the first day, and a bid that leaves it open will charge for the surprise.

Ice at the bare edge

Bare eaves can ice in ways a guttered house does not show. Water runs off the edge, freezes on the walk and builds a ridge of ice against the foundation over a cold week. Ice dams are a separate problem, and they start higher up where heat escapes into the attic and melts the snow on the roof. A bare edge can still make the ground-level damage worse, so the two conversations belong in the same bid.

Before you sign, ask the roofer whether the new eave includes an ice and water membrane along the edge, a heat cable, or neither. Each answer changes the price and the scope. Ask also whether the membrane is named by product and how far up the deck it runs, because a membrane that stops short of the eave line does less than the bid suggests.

What it costs

The eave detail is a line item, and it is usually priced by the foot. It often does not appear on a bid that lists only squares and a shingle product. Ask each roofer to show the drip edge, the fascia repair allowance, the soffit allowance and the ice and water membrane as separate lines. If one roofer folds them into a single labor figure, you cannot compare the two bids on the same edge.

Ask what each allowance covers. An allowance is a stand-in number for work that has not been found yet, and it can change once the old shingles come off. Ask the roofer how a fascia board that turns out to be soft is priced, what unit the price uses, and whether the crew needs your approval before it replaces the board. A bid that answers those three questions in writing gives you a number you can plan around.

Permits and the city desk

Ladue has its own building department, so confirm with the city whether your roof job needs a permit and what the application covers. Changes at the eave, such as a new drip edge, a changed fascia or a different membrane, can sit inside the same application or can raise a separate question about the drawings. Ask each roofer who prepares the application, whether the eave details appear on it and who calls the city for the inspection. Those answers tell you who is responsible if the city asks a question mid-job.

What to ask

  • Where will roof water land once the eave is bare, and is that point written into the scope?
  • Is drip edge priced as its own line, by the foot?
  • What happens to a soft fascia board found after the old shingles come off, and who approves the replacement?
  • Where will the ladder stand, and what gets protected under it in the beds, on the walk or on the lawn?
  • Does the eave include an ice and water membrane, a heat cable, or neither, and how far up the deck does the membrane run?
  • Who prepares the permit application, and does it show the eave details?

Put the answers on paper. A reply that says the crew will handle it, without a line item or a written note, is not an answer you can compare against another bid. If you need to call, the office number is (314) 220-2333. Ask each roofer the same questions in the same words, and keep the replies beside the bids they belong to.

Keeping the bid honest

Each bid should show what it does with the bare edge, not only what it says about the roof surface. When two bids differ on the eave, compare the lines rather than the totals. One bid may price the drip edge and the fascia repair while the other leaves both out, and the gap between the two numbers is not a discount. It is a difference in the job being described. Once the lines match, the price comparison means something, and the eave stops being the place where the surprises hide.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.