An older Ladue house often carries carved stone or cast ornament above the eave: a grotesque at a gable corner, a gargoyle at a downspout head, a lion's head on a bracket under the cornice. These pieces sit in the roof edge. The roof crew works directly beneath them, and ladder contact and tear-off vibration can crack or shift them. Before the bid is final, the question is specific: who lifts each piece off, where it waits while the roof is open, and who sets it back.
Where the carved pieces sit on a Ladue roof
Ornament on the older estates in Ladue tends to sit at the corners of a gable, at the return of a cornice, on a bracket over a porch, or on the parapet line of a flat section. Some are limestone, some are cast stone, and many were set long before anyone wrote a roof scope. Each one is held by a dowel, a pin or a mortar bed, and each of those fails differently.
St. Louis winters work water into old joints. A freeze and thaw cycle can swell a rusted pin until the stone face shows a fine line that was not visible the summer before. A piece that looked solid for years may already be cracked at the dowel. That condition exists before the crew arrives, so it belongs in writing before the roof is opened, not in a conversation after a piece has fallen.
Walk the house with a flashlight held low to the wall. Look for three things: a pin or dowel with rust stains running down the masonry, a seam where the piece meets the wall that has opened or shows fresh powder, and a hairline crack running through the face. Note each piece by elevation and compass side, so the scope can name it later. Photograph each one close and from a distance, with a ruler or a coin in the frame, and keep the files with their dates.
What lifting one piece actually takes
A light cornice return can often be removed by hand with a helper on a stable ladder or scaffold. A carved urn, a finial or a grotesque is a different load. Many weigh more than one person can carry safely down a ladder, and the lift may need a hoist, a boom, or a scaffold set at the right height so the piece is not swung against the wall. Ask each roofer to say which method they would use for each piece, and whether the equipment is theirs, rented, or hired through a separate company.
Once the piece is down, it has to wait somewhere. Stone set on a lawn sinks into soft ground after rain, and stone set on a driveway can chip at the edge. A padded spot on a plywood sheet, covered and off the path of the trailer, is the usual answer. The bid should say where that spot is and who moves the piece there.
The reset is the step most bids leave out. A mason may need to clean the old dowel holes, set new stainless pins, and point the joint before the piece goes back. That work is not roofing, and it may need a different contractor. The roofer can coordinate the timing, but the homeowner should know the reset is a separate line, who is doing it, and when it happens relative to the roof close-in.
What it costs
The price for carved pieces should appear as its own set of lines, not folded into labor. Expect separate lines for the lift equipment or the hoist day, the labor to remove and wrap each piece, the storage spot and any padding material, the mason's reset, and new pins or mortar. Where the number of pieces is not yet known, ask for a unit price per piece in writing, so the total moves only when the count does.
Ask whether the bid assumes the pieces are sound. If a roofer quotes a flat price on the basis that the ornament will come down intact, the quote is resting on a condition nobody has checked. A written line that says who pays for a piece that cracks during removal, and what photographs prove its condition before the lift, settles more than a general promise to be careful.
What to ask
- Which pieces on my house does your scope name by location, and which are lumped under a general line for ornament?
- How is each piece lifted, and what equipment does the lift need on the day?
- Where does each piece wait while the roof is open, and who moves it there?
- Who resets each piece, and is the reset priced in your bid or left to me to hire?
- What photographs will you take of each piece before it moves, and will I receive them?
- If a piece cracks during removal, what happens next, and who pays the repair?
- Does the schedule hold a day for the reset, or does the mason come back on a separate date?
Put the answers in the written scope. A roofer who answers each question in the same words in the bid and in the contract has given you a document you can check against the house when the work begins. Keys Roofing can walk the cornice line with you before the bid is final and write each piece into the scope with its location and photographs.