Exposed Ceiling Beams Need a Named Protection Plan Before Tear-Off

Beams in an older Ladue house take tear-off dust and ladder bumps, so name who protects them and who checks them before the first shingle comes off.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Many older houses in Ladue have a room with exposed beams, most often a living room, library or dining room where the ceiling was built to show its frame. A roof crew working above that room does not see the beams as finish. They see wood under a deck that is about to come off, and dust that falls through the sheathing once the old shingles and felt start to break loose. Before the first nail is pulled, the beams need a name on the job: who covers them, who checks them, and who signs off that nothing was knocked loose.

Town roofing: why a beamed ceiling is a roof question

Ladue has many older houses with plaster or lath ceilings. Some of their beams were set for looks over a lighter ceiling framing, and others carry real load. A roofer cannot tell which from the room below alone. From the attic floor, the top of a beam often shows where it sits against the rafters, and an estimator who looks up there can tell you whether the beam is tied into the roof structure or sits as a decorative piece on the ceiling plane. That answer changes the work. A decorative beam should never take a ladder, a staging plank or the weight of a debris chute, and any work that touches a structural beam should be checked by whoever does the framing repairs on the job.

The freeze and thaw cycle matters here too. Many roofs in town have been patched over several winters, and by the time the crew opens the deck, the sheathing above a beam may be soft from years of ice at the eave pushing water inward. The beam itself is often dry while the boards beside it are not. That is why the attic walk and the room walk should happen on the same day, with the same person pointing at the same spot. A stain on the top face of a beam is a clue about the attic above it, and it belongs in the photo file before anyone climbs the roof.

Some Ladue houses also have a plaster cove or a built-up crown where the beam meets the wall. Those joints are where cracks start. Tear-off vibration, a dropped bundle or a hammer swung against the wall can open a hairline crack that runs the length of the cove, and a crack like that can look worse after the first heating season. Record the joint before the work starts, and ask the roofer to name the crew member responsible for the room.

What to protect in the room

The protection list is short but specific. Cover the floor below the beam line with a rigid layer, not only a drop cloth, because a crew member standing on a drop cloth can slide. Tape plastic over built-in cabinets, bookcases and any furniture that sits against the wall under the beams. Take down every hanging light, fan and speaker that is fixed to a beam, and photograph the wiring before anyone unhooks it. Ask who removes the fixtures and who puts them back, since a fixture left hanging by one wire is a common mistake in a rushed tear-off.

Fine grit is the hidden problem. Shingle dust and granules settle into the grain of a stained beam and into the seams of plaster. A beam wiped with a damp rag the day after tear-off can look clean, while grit pressed into the grain shows up after the first real cleaning. Ask whether the crew uses a shop vacuum with a filter on the room side of the work, and whether the room gets a final clean before the homeowner walks back in.

Work over the room should also have a stated schedule. Ask when the nailing starts over that section, and whether the crew will keep the debris chute away from the room's exterior wall. A chute that lands against a wall can rattle the plaster on the other side. Those are small details, but they are the details that come up after the crew has left.

Winter work and a beamed room

If the roof work runs into a St. Louis winter, the room needs a plan for heat and humidity. A furnace that keeps the house warm while the roof is open can dry out the wood in the beams and open the joints above them. A room that is closed up and cold can also crack plaster when the heat comes back on. Ask the roofer whether the crew will keep the room's thermostat steady, and whether the room will be sealed off from the attic while the roof is open. A dry day with a crew on the deck and a cold room below is a poor combination for old wood.

The same logic applies to the whole house. Dust from tear-off can be pulled into a forced-air system, so ask whether the furnace filter gets changed after the job and whether it is checked during the open-roof days.

What it costs

The protection itself is usually a small line on the bid: floor cover, plastic, tape, and the labor to pull and reset a fixture. The larger number is the plaster or finish repair if a cove cracks or a stained beam needs refinishing, and that is a line the bid should name or exclude. A bid that says interior protection is included, with no list attached, is not enough to compare. Ask for the list, and ask for the cost of any repair that sits outside it.

If the bid says the homeowner handles the light fixtures, the price should show a line for that, or a note that your own electrician does the work. Neither answer is wrong. The problem is an answer that leaves the fixture out of both the price and the schedule. Compare the protection line across each bid the same way, so you can see which roofer has priced the room and which one has not thought about it.

The roofing contract should also say who is responsible if a beam, cove or fixture is damaged on the job, and how the repair is priced and scheduled. That is a term between you and the roofer, and it belongs in writing before the first shingle comes off.

What to ask

  1. Is each beam in the room structural or decorative, and who checked the top of it from the attic?
  2. Which surfaces get a rigid floor cover and plastic, and who puts them up before the first shingle comes off?
  3. Who removes the lights, fans and speakers fixed to the beams, who resets them, and when?
  4. Where does the debris chute land, and how far is it from the room wall?
  5. Who walks the room the morning after tear-off, and who writes down what they found?
  6. If a cove, trim piece or stained beam is damaged, is the repair in the bid, and at what price?
  7. What is the room's heat and humidity plan if the open roof runs into cold weather?

Write each answer beside the question it answers. Ask for the scope in writing, with dated photos of the room before work starts and the protection list attached. Keys Roofing can walk the room with you and the crew lead before a start date is set, and it attends as the contractor on roof day. If you want to walk the beams before you choose a date, call (314) 220-2333.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.