Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

Dry-Stacked Garden Walls Can Shift Under a Roof Crew's Weight

Dry-stacked stone garden walls in older St. Louis County yards can move under ladders and stacked shingles, so check them before the crew stages.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Plenty of older yards in St. Louis County have a garden wall built from stone set without mortar. It holds a raised bed, a terrace, or the edge of a walk. From the sidewalk it looks solid. Underneath, each stone rests on the course below it and on small chinks packed in behind, and that arrangement stays stable only while the ground stays put. When a roof crew works in that yard, the ladder feet, the stacked shingle pallets and the foot traffic all press on the same soil the wall depends on. This page is for the homeowner who has a dry-stacked wall near the house and is deciding what to do before the roof date is set.

What dry-stacked means in practice

A dry-stacked wall has no mortar holding the units together. The weight of the stone and the friction between faces keep it upright. Good builders set each course back slightly into the slope, which is called batter, and they fill the space behind the stones with gravel so water drains away rather than sitting behind them. A wall built this way can last for decades. It can also move a little every winter as water enters the soil, freezes, and lifts. St. Louis freeze-thaw cycles are the usual cause of the slow lean that many owners first notice in March or May.

For roof planning, the point is that a wall which has stood for years can still be close to its limit. A small push at the top, or a slight change in the soil under the footing, can start a bulge that looks sudden to the homeowner but has been building for a season. The wall does not need to look broken to be carrying less margin than it did.

Where the roof crew puts weight

Roof work loads a yard in three ways. The first is the ladder. An extension ladder rests on two feet, and on soft or uneven ground each foot can sink. If a foot lands on the uphill side of a wall, the rails can press the top course outward. The second is material. A single bundle of shingles often weighs more than fifty pounds, and a full pallet weighs well over a ton. Staging a pallet against a low wall, or on top of one, adds load in a way the wall was never built to take. The third is traffic. Crews walk the same path many times in a day, carrying bundles, tools and debris. On a wet day that path can churn the soil at the foot of a wall and loosen the stones.

None of this means the wall will fail. It means the crew should not treat the wall as part of the open yard. A wall that stands fine under a lawn mower can need a different rule once a ladder and a loaded pallet are set near it for a full working day.

Checking the wall before roof day

Before the date is set, walk the wall with a level and a string line. Lay the string along the top course, then measure how far the stones sit from it at several points along the run. Note any bulge, any gap opening between courses, any stones that have dropped out of line, and any soil washing out at the base. Take photographs from the same spot each time, with a tape measure or a known object in frame so the image shows scale. Keep the original files with their date stamps, not screenshots.

Timing matters too. A wall checked after a long dry spell may look sound, while the same wall checked after a thaw or a heavy rain may show movement that was there all along. If the roof date falls soon after a hard freeze, repeat the walk on the morning the crew arrives. That second look tells you whether anything has changed since the first.

If the wall shows movement, the question is not whether the roof can proceed but where the crew can stand. That usually means moving the ladder to a sound section of ground, laying boards under the feet, or staging materials in the driveway instead of beside the wall. A wall that already leans should not carry a stacked pallet at all. Ask the contractor to mark on your yard plan which sections of wall will be kept clear for the entire job.

What to ask each roofer

Put the wall on the list you send to every bidder. The questions are short. Where will the ladder feet go, and will they sit on boards on any section within reach of the wall? Where will the shingle pallet sit, and how far is that from the base of the wall? Who decides on the day that a section of ground is too soft to use, and does that person have the authority to change the plan without waiting for the office? Ask who repairs any stones displaced during the job, and whether that repair is in the bid or billed separately.

Ask the last question in writing. A stone that rolls off a wall during a roof day is easy to dispute later, and a written answer settles who pays before anyone has to argue about it. Also ask whether the roofer has worked around dry-stacked walls before and how they handled one. A specific answer, such as which section they moved the ladder off of and why, tells you more than a general promise to be careful. A vague answer is worth noting on your comparison sheet.

Setting the wall into the roof plan

Once the roofer agrees on where the ladder and materials will sit, write that plan onto the same sketch as the house. Mark the wall, the ladder positions, the pallet spot, and the walking route from the truck to the eave. Give a copy to the crew lead and keep one yourself. If the crew later moves something, the sketch shows what was agreed and where. Most disputes about a yard come from a plan that existed only in someone's memory.

If a section of the wall needs rebuilding after the roof is finished, that is a separate masonry job with its own price and its own schedule. Keep it out of the roof bid unless the roofer has named it as a line item with a number beside it, so the two sets of work do not blur together when the final invoice arrives.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office