Many older houses in Ladue have decorative brackets, corbels or carved knee pieces under the eave. They look like trim, and most quotes treat them as trim. On a tear-off, though, a bracket may be holding up the fascia, the gutter hanger or part of the overhang, and the crew often finds out which only after the first board comes off. A homeowner who is still deciding should settle who handles these pieces before the roof date is set.
What counts as an eave bracket
An eave bracket is any element fixed to the wall below the roof edge that is there to look like support. That includes a sawn wood bracket, a plaster or composite corbel, and a turned or carved piece that sits under a projecting cornice. Some are purely decorative and fastened to the sheathing or the wall with a few nails. Others are real members. On a house with a deep overhang, the bracket can share the load of the rafter tail, carry the fascia board or hold the gutter hanger. You usually cannot tell which from the ground. A ladder look at the edge helps, but the clearest answer is often in the attic, where the rafter tails enter the wall.
Why the tear-off makes it a roof question
Tear-off removes shingles, underlayment and often the drip edge, and that exposes the rafter tails and the top of the fascia. Crews pry at the edge to free the old drip edge and to loosen shingles stuck to the eave. A bracket sitting at that edge can crack, split or drop when it is pried, struck by a bundle, or stepped on by a crew member working from a ladder. Once it cracks, the repair is a carpentry job, and carpentry is not in every roof bid. The fix is simple: name the bracket, name who protects it, and say what happens if it comes apart.
St. Louis weather matters here too. Wood brackets that have sat under an eave for decades often carry old paint over checked wood. Water gets in at the joints where the bracket meets the fascia, and freeze and thaw cycles open those joints a little more each winter. When the new roof goes on, the bracket may look tighter than it was, or it may show rot that was hidden under the old shingles. A bid written before anyone looks at the bracket cannot say which.
What to write into the bid
Ask the roofer to list every bracket, corbel and decorative eave piece on the elevation sketch, with a count per side. A bid that says trim at eave leaves the crew to decide on the day what comes down. The written scope should say which pieces will be taken down, which will stay in place with protection, and which will be replaced. For pieces taken down, it should say who removes them, where they are stored, and who reinstalls them.
Photos belong in the file before the first nail. Take a close photo of each bracket from the ground and, if you can reach it safely, from the roof edge after the old shingles are off. Note any cracks, paint loss and gaps at the joints. Those photos are the baseline for any later question about who broke what. Keep them with the scope and the contract, and send a copy to each roofer you are considering so that every bid is measured against the same house.
If your house was built before 1978, old paint on brackets and trim may contain lead. Ask each roofer how the crew handles painted wood that is removed or disturbed, where the debris goes, and how the work area is cleaned at the end of each day. A written answer on that point is more useful than a verbal promise that the crew is careful.
Who resets them, and what it costs
Resetting a bracket is usually carpentry: new fasteners, sometimes a new block behind the bracket, sometimes a coat of paint on the exposed face. Some roofers do that work with their own crew and some subcontract it. The bid should name who does it and whether the cost sits inside the roof price or appears as a separate line. If the reset is a separate line, ask for it priced by the piece, so you can see what each bracket costs to put back.
If a bracket cannot be saved, ask whether the bid replaces it with a matching piece or leaves it off. Get that answer in writing, because a missing bracket on a finished house is a visible change, and it is easier to settle before the crew leaves than after. If you want a close match, ask whether the replacement will be made from the same profile or chosen from a stock catalog, and who approves the choice before it is cut.
Ask about the gutter hanger too. Many brackets carry the gutter or the fascia end, and the gutter crew may need to come off before the roof crew can reach the edge. If the roofer and the gutter installer are different companies, the bid should say who removes the gutter, who stores the sections, and who sequences the work so that neither crew waits on the other.
Timing on roof day
The safest order is to remove or cover the brackets before the crew arrives. A homeowner can help by having the lower sections of decorative trim cleared from the wall, with the removed pieces stored indoors, in a garage or in a covered spot away from the drop zone. That step is not a substitute for the roofer's protection, but it keeps a loose piece from being knocked down by the first bundle that lands. Ask the roofer whether they want that done before the crew comes, and whether they will cover the remaining brackets with boards or felt before the tear-off starts.
What to ask each roofer
- Which eave brackets, corbels or carved pieces are in your scope, and are they on the written elevation sketch?
- Which pieces come down, which stay in place with protection, and which are replaced?
- Who stores removed pieces, where are they kept, and who is responsible if one is lost or cracked?
- Who reinstalls them, and is that work in the roof price or a separate line?
- If a bracket is found rotten under the old shingles, what is the unit price for the repair, and who approves it before the work starts?
- How does the crew handle old paint on a house built before 1978, and where does the debris go?
- Who sequences the gutter removal with the roof edge work?
What to decide this week
You do not need a final answer from every roofer before deciding, but you do need one thing from each: a written list of the brackets in the scope. Walk your own house with a phone, take the photos, and send the list with the photos to each roofer you are considering. The reply tells you whether the roofer looked at the edge or only at the shingles. If the answer describes each bracket and who handles it, the roofer has read the house. If the answer says trim is included, ask again, and write down the question and the date you asked it.
If your house has no decorative eave pieces, the same question still applies in a different form. Name the fascia, the crown molding and the drip edge the same way, with who removes each one and who reinstalls it. Keys Roofing can walk the eave with you and put the written scope and photos in your hands before any date is set. The office number is (314) 220-2333.