Many older houses in Ladue have brick or stone veneer walls that run up to the roof line. The veneer is not the structure. It is a layer of masonry held to the wall behind it by metal ties, and the roof meets that layer at the top. When a roof comes off, the crew works right at that junction, so what happens to the veneer and its ties belongs in the bid before anyone lifts a shingle.
This page covers one narrow question: what a roof replacement can disturb at a brick wall, and what to ask the roofer to write down. It does not cover the whole flashing system or the roof deck, which have their own pages on this site. If you have a brick house and a roof on your list this year, this is one of the lines most bids leave vague.
What is behind the brick at the roof line
A veneer wall is built in two parts. The brick faces outward, and a gap of air, called the cavity, sits between it and the sheathing behind. Metal ties run from the brick into the framing or sheathing. The brick carries its own weight down to the foundation, and the ties keep the face from leaning away from the wall behind it. Nobody sees the ties from the yard, and most of them sit well below the roof line.
At the top of a veneer wall, the roof meets the brick. The usual detail is a piece of metal called counterflashing, set into a groove cut in the mortar joint, that laps over the step flashing running up the roof. When the roof is redone, that counterflashing is usually replaced. A new piece needs a clean slot in the mortar, so the mason or roofer may have to cut the joint and chase it out. The metal keeps water out of the wall. The ties may be a few courses lower, out of sight, and the crew can work for a full day without seeing them.
Why the top of the wall takes more abuse than the rest
St. Louis winters push water into masonry in a cycle. Rain and melting snow soak into the mortar at the top of the wall, where the roof sheds water onto the brick. When that water freezes, it expands and widens the tiny cracks in the joints. The next thaw lets more water in, and the cycle repeats. Over a few decades, this is how a top course loosens, a joint starts to crumble, and a tie begins to rust where it is wet.
That is why the roof line is the place to look before a tear-off. The shingles may look fine from the street while the mortar under the counterflashing has already softened. The crew may find that problem only after the old metal comes off. A bid written before anyone looks at the wall has to guess at that condition, and a guess is an unpriced risk.
When the crew actually touches the ties
Most roof replacements never reach the ties. The crew strips shingles, lifts the old metal, and sets new flashing into the joint. The ties matter when the scope calls for more. Examples include rebuilding a section of brick above the roof, replacing a damaged top course, moving a chimney that sits in the veneer, or adding a dormer where the veneer continues. In each case the brick is being opened, and the ties come into view.
If the veneer is old and the mortar has softened, the crew may see ties that are rusted, bent, or no longer connected to the brick at all. A rusted tie is not always a failed tie, and a bright tie is not always a sound one. The person who judges the ties should be a mason or a person the scope names, and the scope should say what counts as acceptable and what gets replaced. Without that sentence, the decision falls to whoever is on the ladder that day.
Signs to look for before the bid
You can see some of this from the ground before any crew arrives. Walk the wall at the roof line with a phone and take close photos in daylight, from straight on and from an angle. Look for:
- Brick faces that bulge or lean away from the wall at the top, especially above a window or door.
- Mortar joints that crumble when you press them with a key or a screwdriver.
- Hairline cracks that run in a stair pattern up the wall.
- Stains that run down the brick below the roof line, which can point to water moving through the wall rather than over the roof.
- Efflorescence, the white salt crust on brick, under the eave.
None of these prove the ties have failed. They tell you the top of the wall deserves a second look before anyone sets a number. A roofer who only checks the shingles will miss them, and a mason who is not on the bid will not be on the roof.
What to ask each roofer
- Will the crew cut, chase, or remove any brick, mortar, or stone at the roof line? If yes, which courses and which walls?
- Who does that work? If it is a mason, is the mason named on the bid, and is the mason's labor a separate line?
- What mortar will be used? A mismatch in color or hardness can make the repair stand out, and it can fail faster than the original joint.
- If a tie is found loose, bent, or corroded, what happens next? Does the crew stop, call you, and wait for an answer in writing?
- Will the old counterflashing be removed in full, or left in place and resealed? Name the metal and the method.
- What photos will show the wall before the work, during the cut, and after the repair? Who keeps them?
Compare the answers side by side. A bid that says only that the wall will be flashed leaves the masonry unpriced, and the first surprise will show up in the middle of a working day.
What the written scope should show
A roof scope that touches brick should name the wall by location, not just by the word brick. A useful line names the north gable wall above the upstairs window, gives a count of courses to be removed, names the mason who will do the work, states the mortar type, and lists the photo set that closes the job. A line like that can be checked later. A line that says repair as needed cannot.
Keys Roofing writes the scope with photos and measurements and puts it in the homeowner's hands before the work starts. If a brick repair is part of the job, the written scope should show it the same way it shows the shingles. If a mason is needed for the wall, the scope should say who calls the mason and when. Questions about how a brick wall at the roof line will be handled can go to Keys Roofing at (314) 220-2333.
Matching the brick, and what Missouri does not require
Matching brick and mortar on an older wall is harder than matching shingles. The old brick may have weathered differently on each face, and new mortar looks different until the old joints have weathered too. Ask the roofer to show a sample of the mortar mix and the brick they plan to use, and ask whether the repair will be visible from the street.
Missouri has no matching statute that requires a roofer or an insurer to make a masonry repair match. Whether a matching payment applies to a claim turns on the policy wording, not on a state rule. That question belongs with your insurer, and it is worth asking before the mason is booked rather than after the wall is open.
A short order of work for a brick house
- Walk the wall at the roof line and take photos before any contract is signed.
- Ask the roofer whether any brick, mortar, or stone will be cut or rebuilt, and get the answer in the bid.
- If the answer is yes, name the mason and the mortar, and put the masonry line on the same page as the roof.
- Agree on what happens if a tie is found loose, before the wall is opened.
- Keep the before, during, and after photos of the wall in the same folder as the roof photos.