Ask for the Architect's Roof Detail Sheet Before the Bid Is Written

A Ladue house built from custom drawings has roof details no bid will guess, so ask for the detail sheet and the original permit set first.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Many older houses on large Ladue lots were built from a set of drawings made for that one house, not from a catalog plan. The roof on such a house often has details that no roofer can see from the ladder: a valley that runs under a parapet, a cornice return tied into a wall, or a flashing drawn to a specific brick course. Before a roofer writes a number, the homeowner should ask for the architect's roof detail sheet, and if the architect's office no longer has it, the original permit set from the municipal desk. Without those sheets, each bid has to guess at the same hidden parts, and the guesses rarely match.

Town roofing

Ladue sits in St. Louis County, and many of its houses were built one at a time on lots large enough that the builder could design around the site. That history helps the homeowner in one way: a custom house usually has a set of drawings, and those drawings usually show the roof framing, the flashing at each wall, and the place where one roof plane meets the next. In a subdivision of near-identical houses, a roofer can learn the layout from one job and apply it to the next. In a one-off house, every roof is its own problem.

Where a detail sheet exists, it answers questions that otherwise turn into change orders. It can show whether a chimney sits on a roof plane or passes through a wall. It can name the metal at a valley, the depth of a built-in gutter, the height of a parapet cap, or the drip at a dormer cheek. It can also show what was never built, such as a second layer of decking that the owner remembers but the drawing does not include. A roofer who sees the sheet can quote the work it describes. A roofer who does not see it will quote from the house as it stands, and the first thing the crew finds under the old shingles will be priced as an extra.

The municipal desk is the second place to look. Permit records for older houses often hold the original roofing permit, a later re-roof permit, and sometimes an addition permit that changed the roof line. Ask the desk whether those records are in a file you can request, and ask for copies of any roof-related sheets. If the desk cannot find a file, that is also useful to know before the bid, because it means the roof's history has to be rebuilt from the house itself.

Ladue's freeze and thaw cycle makes the old details matter more. A flashing that was set tight in a drawing can open once the mortar joint behind it has moved through several winters. Hail season and spring storms test the same joints. A detail sheet will not tell you the condition of the caulk or the mortar, but it tells you where to look, and that gives the roofer a place to start the walk.

What it costs

Getting the architect's sheet usually costs time rather than money, but the time has a price. An architect's office may charge for copies, for a search through old files, or for a short call to explain a detail. Ask the office what the search and copy charges will be before you request the file, and ask whether the charge is a flat fee or billed by the hour. Most offices will answer that on the phone.

The bid cost changes with the detail. A roofer who has the sheet can price a parapet cap, a built-in gutter, or a copper valley as its own line, with the metal named and the length measured. A roofer who does not have the sheet has to add a contingency, and that contingency is often larger than the work it covers. When two bids differ sharply, one common reason is that one roofer had the drawing and the other did not, so the higher number may reflect the detail while the lower number guesses at it.

Ask each roofer to say in writing which sheet they used to price the roof. If the answer is "the house as we saw it," the bid is a field estimate, and the homeowner should expect the number to change once the crew opens the deck. If the answer names the sheet, its date, and its detail numbers, the bid is tied to a drawing both sides can check. Keys Roofing can be reached at (314) 220-2333 to talk through what a bid for a custom house should name.

What to ask

  • Does the house have an architect's roof detail sheet, and who holds the original set?
  • Which sheet number and revision date did you use to price the flashing at each wall?
  • Which details on the sheet were not built as drawn, and how do you know?
  • Is each chimney, dormer cheek, parapet and built-in gutter priced as its own line, with the metal named?
  • If the desk file is incomplete, what do you assume about the decking and underlayment under the old roof?
  • What happens to the bid if the detail on site does not match the sheet?

Keep the sheet copies in the same folder as the bids. When you compare two roofers, compare them against the same drawing, not against each other's memory of the house. A roofer who asks to see the sheet before quoting is doing the work the bid depends on.

The sheet will not tell you whether the roof is failing. A roof can match the drawing and still need repair at the valleys or the step flashing. What the sheet does is make sure the bid describes the roof that is actually on the house, and that is the first thing a Ladue homeowner should be able to check before signing.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.