Many older houses in Ladue have a top floor that holds more than storage. A bedroom under the gable may have a tall walnut armoire, a chest that came down from a grandparent, or a dresser that was never meant to go up a narrow stair. When the roof comes off, those rooms sit directly under the work. The crew will be walking the deck above them, carrying bundles of shingles across it, and running a dumpster chute or a hoist past the eave. Before the first board comes up, you should know which pieces stay, which ones leave the room, and who does the moving.
This is a question for the homeowner to settle with the roofer in writing, because the answer changes the price, the schedule and the risk of damage. A roofer's crew is trained to protect the roof and the walls it touches. Moving a dresser down a flight of stairs is a different job, and most roofing crews will not do it unless the bid says so.
Which rooms sit under the work
Walk the house with the lot sketch in hand and mark every room with a ceiling that the tear-off will expose or that sits below a valley, a dormer cheek or a chimney. Those are the rooms where dust, grit and vibration arrive. In a typical reroof, the attic hatch and the top-floor ceilings are the first places where the crew's activity shows up as a fine layer of granules on the furniture. A dresser near a bedroom window is less of a concern than a bookcase against an exterior wall, because the wall takes the jolt when a bundle is dropped on the deck above.
Some rooms need no change at all. A guest room with a closed door and a bed that stays put can be left alone if the crew agrees to keep its door shut and the vent covers in place. Other rooms need a full clear-out. Mark each one on paper and write down the answer for it, rather than trusting a general phrase like we will protect your home.
Heavy pieces and the stair
The hard part of an antique move is the stair, not the room. A solid oak chest can weigh several hundred pounds, and the turn at the landing is where it stalls and where the wall takes a gouge. If a piece has to leave the room, measure the doorway, the stair width and the landing before anyone books a day. Remove drawers, doors and shelves where that makes the piece lighter and narrower, and tape the drawer fronts shut so they do not slide open on the way down.
Ask each roofer who moves the furniture. Some will say the homeowner moves it, some will say a moving company does, and some will offer their own crew for an added line. Those are three different prices and three different liability answers. A line that says the contractor will assist is not the same as a line that says the contractor will carry. Ask which one it is, and ask for the wording in the proposal.
Protection and what stays in place
Anything that stays in the room needs covering, but the cover matters more than the cloth. Plastic sheeting that traps moisture against a finish will leave a mark on wood faster than dust will. Use breathable moving blankets over the top of each piece, and keep plastic off the surfaces that get warm in the sun through a skylight or a south window. Remove throw rugs and runners before the crew arrives, because a rug on a hard floor slides under a moving foot and nobody sees it until it does.
Floors need their own check. Old oak floors and plaster ceilings below the roof deck can crack or shift when the deck is loaded and unloaded. Walk each affected room with the roofer and take a dated photo of the floor and the ceiling before the tear-off starts. Mark any existing crack with a pencil date. Those photos are the record of what was there before the crew touched anything, and they cost nothing to take.
Rain, heat and the open roof
The open roof is the time when the house is most exposed. A summer afternoon in St. Louis can bring a thunderstorm that arrives faster than the crew can cover the deck, and the rooms below are the first to take water. Ask each roofer what the crew does when rain is forecast, who puts the tarps down, and whether the furniture that stays in the room gets moved to the center of the room away from the walls. A written answer to that question tells you more than a sales pitch about how the job is run.
Winter changes the picture. An open roof in January over a bedroom with an antique bed frame can mean a cold, damp room for days if the crew stops for a freeze. Ask how long the rooms can stay open and what the crew will do if the job has to pause for a week. Get that answer in writing too.
What to ask before the date is set
Put these questions to each roofer and compare the answers on the same sheet. Who moves each heavy piece, and in what price line? Which rooms does the crew consider open to the work, and which does it expect you to close? Who covers the furniture that stays, and with what material? Who checks the floors and ceilings in each room before and after the tear-off? What happens to the furniture if rain starts mid-day? Who puts it back, and who checks that it went back to the same place?
Keep a list in your own hand of every piece you mean to move, its approximate weight and its route out of the house. Give a copy to the roofer and keep one for yourself. If the list and the bid disagree about who moves what, you have found the gap before it cost anything.
If you want to talk through the rooms on your own house before you choose a contractor, the Keys Roofing office at (314) 220-2333 can walk you through what a written scope should cover for the upstairs rooms. Ask for the answers in writing either way, and check them against the bid before any date goes on the calendar.