Most Ladue homes were built with the furnace in the basement and nothing above the top floor but framing and insulation. Some additions, and some older houses remodeled to finish a bonus room under the roof, put an air handler in the attic instead. If yours does, the roof crew will be working a few feet from a live electrical box, a condensate drain and a filter rack. None of those is part of the shingle price unless the roofer writes it into the scope.
Find the air handler before you compare quotes
Walk the attic with the roofer or your own contractor before any bid is final. Look for a flat metal cabinet or a squat box sitting on a platform or hung from the rafters, usually with a supply duct leaving the top or side and a return duct entering from below. Near it you should find a small disconnect box on the framing, and under the unit a shallow metal pan that catches condensate. Some units also have a float switch in that pan that cuts power if water rises. Write down what you see and where it sits relative to the access hatch and the planned path of the shingle bundles.
Measure the distance from the unit to the eave on the side where the crew will work. If the unit sits near the rafter tails, the tear-off will be close to it, and the bid should say how the crew protects it from falling debris and from foot traffic on the deck above.
The power shutoff needs a name and a time
The disconnect at the unit is the first thing to settle. Crews need the unit off while they work near its wiring, and the homeowner should not have to guess when that happens or who flips the switch. Ask each roofer three things in plain terms: who turns the disconnect off, at what point in the day, and who turns it back on and checks that it runs.
Some attic air handlers share a circuit with the attic light or the stair lighting. If that is the case in your house, the crew will need the breaker number, and the bid should name it so the electrician or the roofer knows which breaker to flip. Ask whether the roofer plans to shut power at the panel or at the unit, and whether that choice leaves the attic dark during the day. A headlamp for the crew is a small line item that many bids leave out.
The condensate drain and the pan
The cooling coil drips water into a pan, and a drain line carries that water out to a floor drain, a utility sink or an exterior exit. During a St. Louis summer the unit runs hard, so a drain that is blocked by tear-off grit or a crushed line can overflow the pan and put water through the ceiling below. The problem often shows up days after the crew has left, which is why the bid should say who checks the pan on the first cooling day.
Ask where the drain line exits. If it runs through a wall or out the eave, it may pass through an area that is cold during a January freeze, and a line that stays full of standing water can freeze and back up. Ask whether the roofer will cap the drain during tear-off and remove the cap at the final walk, and whether anyone will run water through it before the crew leaves so you know it flows.
Dust, filter and return air
Tear-off dust moves. Shingle grit, sealant dust and nail fragments can be pulled into the return side of an air handler that is running during the job. The bid should say whether the return grille is covered, whether the filter is removed during the work, and who installs a new filter at closeout. A filter that was clean on the day the roof started and is loaded with grit on the day it is finished is a common complaint after a tear-off.
Ask the roofer to confirm that the supply and return openings in the attic are covered with plastic or taped before the first bundle is opened, and that the covers come off only when the attic has been cleaned. If the air handler is serviced by a separate HVAC company, the bid should say who calls them and who pays for any cleaning of the coil that the dust requires.
What to put in writing
- The location of the air handler, the disconnect and the drain exit, drawn on the scope or written as a short note with photos.
- Which breaker or disconnect cuts power, who operates it, and the hour the unit goes off and comes back on.
- Who checks the condensate pan and drain before the crew leaves each day, and whether a float switch was tested.
- How the drain is capped during the work and who clears it at the final walk.
- Who covers the return grille, who replaces the filter at closeout, and who cleans the coil if dust reaches it.
- Who calls the HVAC service company if the unit needs attention, and who pays that bill.
What to ask each roofer
Ask each roofer to describe, in their own words, what the crew will do with the attic air handler from the first morning to the final walk. A roofer who has done this work will answer without hesitation and will mention the disconnect, the drain and the return cover. A roofer who answers that the attic is fine and the crew does not touch the mechanicals has not thought about the unit, and that answer belongs on your comparison sheet next to the bid.
Ask also whether the roofer will reduce the number of times the attic is entered during the work. Every trip up through the hatch carries dust and foot traffic past the unit, and a crew that plans its attic visits around the bid is easier to manage than one that goes up whenever it needs a tool.
If you want to walk the attic with a Keys Roofing estimator before you choose a start date, call the office at (314) 220-2333. Bring the make and model plate from the unit if you can find it, and note whether the air handler is on the same circuit as any attic lighting, so the walk can answer the power question on the first visit.