An electric car changes roof day in a small way that is easy to miss. The car can be moved to the street in ten minutes. The charger cannot. It is bolted to a wall, fed by its own circuit, and often placed near the garage door or on an exterior wall close to the drive, which is exactly where a roof crew wants to stage bundles, run a hoist line or drop a trailer. Before a start date is set, the homeowner should know where the charger hangs, what it draws from, and whether anyone plans to cut its power while the roof is open.
Find the charger before the crew does
Start with the wall. A charging unit on the garage wall sits in the same zone as the door track, the ladder line and the spot where a crew hands shingles up from the drive. A unit on an exterior wall is closer to the drop zone, where tear-off debris falls straight down and then slides along the ground. Measure the unit's height above grade and its distance from the nearest corner of the house, then ask the roofer to mark it on the site sketch. A charger that is missing from the sketch is a charger nobody planned around.
Ask also whether the wall behind the unit is sound. Many units are screwed into siding, stone veneer or a brick face, and a crew moving a ladder against that wall can knock a mount loose. This is a question about the wall, not the roof, but it belongs in the same walk because the crew will be working beside the unit for days.
The cable, the car and the drive
The charging cable is the part that moves. On an ordinary evening it coils on its hook. On roof day it may be run out to a car parked on the drive, or left lying across the apron where the trailer turns. A cord on the drive is a trip line for anyone carrying bundles, and a cord that gets stepped on can split its jacket, which is a second repair nobody budgeted for. Ask each roofer whether the cable will stay coiled on every roof day, and whether the crew will cover or cone any cord that has to cross a walking path.
Then settle the car. Some homeowners leave the car in the garage for the week, but a garage the crew uses as a staging room is not a place for a parked car with a cable plugged in. Others move the car to the street, which may be fine on a quiet block and a problem on a block with street sweeping or a posted parking rule. Whichever choice is made, write it on the schedule with a day and a time, not just a general plan to move it.
Power off is not the same as charging stopped
Crews often ask that power to the work area be shut off, or that certain circuits be checked, before tear-off dust and water reach the panel. A charger on a dedicated circuit may be on that list, and it may also sit on a breaker the crew does not touch at all. If the breaker is switched off, the car will not charge, and a homeowner who needs the car for a Monday morning drive will want to know that in advance. If the breaker stays on, the unit is powered while work goes on overhead, and the cable should still be coiled.
Ask each roofer who decides which breaker gets switched, who does the switching, who checks it is back on at the end of the day and who restores it at the final walk. These are four different jobs. A roofing contractor can note the breaker on the scope and the day it changes, but any reconnect of an electrical circuit belongs to whoever holds the electrical work, and the homeowner should know that person's name before the crew starts. Put the answer in writing, next to the breaker's location in the house.
Charging itself also has a schedule. A car plugged into a unit on a cold St. Louis morning can take longer to reach a full charge than it does in mild weather, and a day with the power off stops the charge entirely. A homeowner who must have a full battery by a certain hour should ask each roofer for the windows when the charger will be unavailable, then plan the charge around those windows rather than around a guess.
Permits and the wall unit
A wall charger is an electrical installation. In many St. Louis County jurisdictions a new unit, or a new circuit feeding one, is inspected under an electrical permit, and that permit is separate from the roofing permit a roof job pulls. A roof permit does not automatically cover a charger, and a charger that goes in after the roof is finished can need its own paperwork and its own inspection. The answer depends on the permit desk that serves the address, so ask that desk, not a neighbor.
Ask the roofer whether the permit they pull will list the charger on the site at all, or whether it covers only the roof. Ask the homeowner's electrician, if there is one, whether a permit is open for the unit and whether its inspection will land before or after the roof day. If the charger is being moved as part of the roof work, the move itself may need a permit and a line on the scope, which is easy to miss when the roof is the only item being discussed.
What to ask each roofer
- Where will the charger unit sit relative to the ladder line, the staging area and the drop zone, and will it be marked on the site sketch?
- Will the charging cable stay coiled on every roof day, and will any cord that crosses a walking path be covered or coned?
- Where will the car be parked for the duration, and who moves it if the garage is needed?
- Which breaker serves the charger, who switches it off, who checks it, and who switches it back on?
- Who owns any electrical reconnect, and is that step named in the scope with a price or a line showing it is excluded?
- Is an electrical permit open for the charger, and is it separate from the roof permit?
- What are the hours each day when the charger will be unavailable, so the car can be charged around them?
Compare the answers by their specifics. A reply that says the crew will be careful with the charger tells you little. A reply that names the breaker, the day it goes off and the person who turns it back on tells you what the crew actually plans to do.
Write the answers into the scope
Every answer belongs in the written scope, not in a phone call or a text. Keys documents the site, including the wall where a charger is mounted, with dated photographs and measurements, and puts that written scope in the homeowner's hands. A photo taken from the drive with a tape held against the unit makes its location clear to anyone who reads the scope later, including an electrician or an inspector. Keep one copy with the roof papers and send the other to the person who handles the electrical work, so the same breaker and the same wall are described the same way in both files.
If the answers change after the scope is signed, get the change in writing too. A new start date can move the breaker day, and a new car plan can move the parking line. Each change should carry a date and the name of the person who agreed to it.
What to bring to the first visit
- The make of the charger and the unit's mounting height, measured from the ground.
- A photo of the breaker panel and the label on the breaker that serves the charger.
- Your electrician's name and number, if one already handles the unit.
- Your car's usual parking spot and the street rules on your block.
- Any permit number on file for the charger.
Keys can be reached at (314) 220-2333 to set the first visit. The charger's location can be photographed on that visit, so it is part of the written record from the start.