A two-story foyer in an older Ladue house often has a chandelier hung on a long chain or cable from a ceiling twenty feet or more above the tile. The fixture is not part of the roof, but it hangs in the room where tear-off debris, nail gun cords and grit from the deck can all fall. Before the crew starts, someone has to decide whether the fixture comes down, gets covered where it hangs, or stays exposed with a plan for the dust. Each roof bid should say which one is happening and who does the work.
This page is for the homeowner who has the quotes on the table and is still deciding what to ask. You do not need to know how a chandelier is rigged. You need one answer from each roofer: who touches the fixture, and on which day.
Town roofing: why the foyer sits in the drop zone
On a standard tear-off, old shingles and underlayment come off in sections and go into a dumpster or a chute. Lighter debris, grit and the odd fastener drift down through the openings the crew makes in the deck. Many older houses in Ladue put the front entry under a gable or a dormer, so the section being opened can sit directly above the stairs and the chandelier. The fixture then hangs in the middle of a room where the staging is likely to land.
Vibration matters too. Hammering on the deck above a long-hung fixture can set it swinging. A chandelier that swings for an afternoon can knock a ceiling medallion, a wall sconce or one of its own glass pieces. That is a small risk, and a plan handles it, but it is not a reason to skip the question.
Three ways a roofer can handle the fixture
There are three common answers, and each carries a different amount of time and risk.
- Lower it. The fixture is unhooked, lowered on its chain or cable, wrapped and stored in a bedroom or dining room away from the work. This is the cleanest answer for dust, but someone qualified has to disconnect the wiring and reconnect it afterward. The bid should name that person and say whether the reinstall is in the price.
- Cover it where it hangs. The fixture stays up. The crew wraps it in plastic and tapes the wrap at the canopy, then removes the cover once the deck is closed. This keeps dust off the glass and brass, but it does not stop a swing or a dropped tool. It is usually the practical answer when the chandelier is heavy and the ceiling is plaster.
- Leave it exposed with a stated plan. Some roofers will say the fixture stays uncovered and the foyer is closed off during open-roof hours. That can work, but only if the bid says how the barrier is set, who sets it, and who checks it at the end of each day.
None of these is right by default. The trouble is an answer that names none of them. A bid that promises the interior will be protected, without saying what that means above the foyer, has left the question open.
What the fixture's age and weight change
An older chandelier may hang from a box that was never meant to carry a heavy fixture on a chain, or the canopy may be cracked or loose. A piece with brass arms and crystal can weigh enough that the person lowering it needs a second set of hands. Before roof day, ask whether the crew will look at the canopy and the mount. If the answer is no, the fixture's safety is still not a roofer's job, but the crew should know not to lean on it or use it as an anchor for a rope or a ladder.
Ask also how the foyer's power is handled. The light may share a circuit with an attic light, a bath fan or the outlet the crew wants for a compressor. A bid should say whether power to the foyer stays on through the day, and who tells the homeowner before it is shut off. A chandelier on a dimmer or a smart switch can behave oddly when a circuit drops, so ask for that to be written down too.
Where the crew walks through the foyer
The front entry is often the only door the crew uses for materials, and a foyer is a poor place to stage anything. Ask each roofer which door the crew enters by, where the shingle bundles and dumpster rope will go, and whether the stairs stay clear. A tall foyer also takes long ladder reach, so ask whether the crew will set a ladder inside the house at all. Many roofers do not, and the answer tells you how the interior is protected.
Ask the same question about the household. Children, pets and visitors do not know the foyer is a hazard on roof day. The bid should say who keeps the front door closed and what happens when someone who was not told opens it anyway.
What it costs
A lowering and reinstall is a labor line, and it can be priced apart from the roof. Ask for it by name. If an electrician you hire lowers the chandelier, the roofer's bid should not carry that cost, but it should say when the crew will wait for the electrician and what happens if that visit slips. If the roofer's crew handles the fixture, ask whether the price includes the reinstall and whether any part of the canopy or mount is replaced. Cracked canopies and broken crystal are repair items, and they belong in their own line rather than inside a general figure.
Covering in place costs less in time but more in risk, and the price difference between the methods is often small. Compare what each roofer says the cover costs, and what happens to the cover once the work is done.
What to ask, in writing
Before you sign, ask each roofer for the answer on the foyer in one sentence. The sentence should name the fixture, the method, the person doing the work and the day it happens. For example: the entry chandelier will be lowered by a qualified electrician hired by the homeowner, wrapped and stored in the dining room on roof day, and reinstalled by the same electrician before the final walk.
Then check the rest of the bid for the same fixture. Some quotes mention the interior in one place and not another. Look at the protection section, the staging section and the closeout list. If the chandelier is not named in any of them, it is not covered anywhere.
Ask every roofer the same question, and write down each answer as it comes in. Two answers that differ on the foyer tell you which roofer has thought about the room and which one has not.
Photos before anything moves
Ask each roofer to photograph the foyer, the chandelier, the canopy and the ceiling before the crew starts. Keys documents damage and puts a written scope with photos and measurements in the homeowner's hands. The same habit belongs inside the house. A dated set of photos taken before anyone touches the fixture gives you a reference if a crystal piece, a cord or a canopy turns up broken later. Keep the photos with the contract, not on a phone that may be replaced.
If the question goes unanswered
If the chandelier is not mentioned in the bid, the crew will decide on the day. That is usually when a fixture gets covered in a hurry or left alone with the dust. Settle it now, while you can still ask. A written line takes a minute to add to a bid, and it saves a standoff at the front door on roof morning with a crew waiting on the ladder.