Plenty of older houses in Ladue carry steep gables finished with stucco and dark wood boards laid over it in a pattern. That is the half-timber look of Tudor and English revival houses, and it sits exactly where the roof meets the wall. If you are planning a roof replacement on a house like this, the gable rakes are where a quote tends to go thin. The roofer prices shingles, underlayment and drip edge. The timber boards and the stucco behind them are often nobody's line item, so the number on the page does not show who takes them off, who puts them back, or what the wall looks like afterward.
Town roofing
On many of these gables the wall behind the boards is stucco over sheathing, though older examples can be masonry or lath over solid wood, so the wall type needs a look before the quote is final. Along the rake the roof edge runs up against that wall. When the roof comes off, the drip edge and underlayment have to be tucked where they meet the stucco, and that often means the boards come off first. A board fastened through the finish into the sheathing does not come away cleanly, and the stucco around it usually cracks as it is pried.
Freeze and thaw is the reason the junction matters. A crack at a stucco rake lets water sit against the sheathing through January and February, and the first sign is often a stain on the top-floor ceiling several feet from the gable, which makes the leak hard to trace. Before the tear-off, have the crew and the homeowner walk each gable together, photograph the boards, the stucco line and the rake edge, and keep the photos with the date. Keys Roofing documents the gable this way and puts the photos and measurements in the homeowner's hands in writing.
Ask the desk that issues your roofing permit whether a stucco repair or a timber board reset at the rake needs its own line on the permit. Some desks in St. Louis County treat exterior wall repair as separate from the roof, and a roof permit alone may not cover it. A quick call before the crew is scheduled costs far less than sorting out the scope after the stucco is already open.
Old timber boards are also often wider and thicker than what a lumberyard now stocks. If a board breaks on removal, a replacement may need to be milled to match, and that can take weeks. Ask whether the schedule has room for it, or whether the crew will set the boards aside and reset them on a second visit.
What it costs
A bid for the roof alone does not include the trim, so the trim cost has to be written in on purpose. Stucco patches and board resets are usually priced by the foot, by the board, or by the hour. A line that says trim included hides a number that someone will pay later, and that someone is often the homeowner after the roof is done.
Ask for the linear footage of rake on each gable and the count of boards on each. Ask for a unit price for any board that proves rotten once it is off. A rotten board found on tear-off day should be a priced line in the bid, so the decision happens with the homeowner present rather than as a surprise on the final invoice.
Stucco patches also rarely match the weathered wall around them. A quote should say whether the color coat is included, whether the crew will feather the patch into the surrounding finish, or whether only a base coat is being applied. The roof square count does not measure any of this, so a bid built only from the roof measurement will not show the cost.
What to ask
- Which gables are in the scope, and how many feet of rake is on each one?
- Who removes the timber boards, and where are they stored while the roof is open?
- Who patches the stucco or masonry behind them, and is that work on the roof bid or on a separate trade's quote?
- Does the stucco patch include a color coat and feathering, or only a base coat?
- Who matches the stain or paint on reset boards, and what happens if a board breaks on removal?
- What is the unit price for a rotten board found after it comes off?
- Is any trade on this gable a subcontractor, and does its name, phone number and start day appear in the written scope?
Keys Roofing's office is (314) 220-2333. If the answers come back vague, ask for a walk of each gable before the start date is set. The person walking the gable should be able to point to every board and say who handles it.