Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Steam Shower Upstairs Puts Its Water Line Where the Crew Works

A steam shower on an upper floor adds a water line, a drain and a sealed enclosure that a Ladue roof crew has to plan around before tear-off.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A steam shower takes more planning on roof day than a standard shower, and most of that planning happens on the second floor. Many Ladue houses from the 1920s through the 1950s put an upstairs bathroom against an exterior wall, often the same wall where the roof meets the house at the eave or a dormer. When a homeowner adds a steam unit to that room, the roof crew's work and the bath's water, heat and electrical needs share the same space for several days. This page covers what to name in writing before tear-off starts, so the bath is not damaged by weather, dust or a crew working on the wall above it.

What a steam shower adds to the upper floor

A steam enclosure is more than a tiled stall. It usually has a steam generator, a hot-water supply, a drain sized for the room, a sealed glass door and a 240-volt circuit for the generator. The generator is often mounted in a closet, a mechanical chase or an attic bay on the far side of the wall, and that placement matters on roof day. If the generator sits in a closet directly below the roof edge, the crew's work at the eave shakes the wall around it. If the unit sits in an attic bay, the crew may need to step around it, and the attic floor may be the only path to the roof hatch.

Ask each roofer to walk the bath wall and the closet with you before the bid is final. Write down where the generator sits, where the water shutoff for the steam line is and where the drain line runs through the floor. A bid that says "protect bath" without naming the wall is not enough.

The water line is the first thing to name

A steam shower depends on a shutoff that a homeowner can reach without climbing into the attic. On roof day, the crew may need to pull old flashing, open a vent stack or cut into a roof penetration near a plumbing wall. Any of those tasks can disturb a supply or drain line in the same chase. Name the valve that stops water to the bath before tear-off begins, and confirm that it works. Ask whether it stays closed for the whole roof week or only during the hours when the crew is working above that wall.

Ladue homes with older galvanized supply lines deserve a closer look before a steam unit goes in, because the pipe can be brittle when a nearby vent is moved. A plumber may need to be on the job for that check. Ask each roofer whether the plumbing check is in the bid or whether it is a separate call you would have to make yourself.

Dust, vibration and tile

Tear-off dust is fine grit that settles on every horizontal surface in a room below the roof. A steam shower has a tiled floor, a glass door and often a finished wall of cement board or large-format tile. Grit on the glass scratches under the first cleaning, and grit on the tile can work into the grout. Ask each roofer how the bath is sealed off during tear-off. The answer should include plastic over the door opening, a plan to keep the door closed and a cleanup of the glass and tile before the room is handed back.

Vibration from tear-off can also loosen grout at the tile corners and shift the glass panel if its track is not secure. A homeowner can ask for dated photos of the glass track and the tile corners before roof day, so there is a record if a hairline crack appears after the crew leaves.

Heat and humidity on roof day

A steam unit runs hot and produces moisture. If the bath is closed off from the rest of the house during tear-off, the generator will usually be shut down for the week. That is a reasonable call, but it needs to be written down. The homeowner should decide whether the generator is powered down at the breaker, drained or left with its door closed. A roofer who says "we will not touch it" has not answered the question. Ask who turns it off, who turns it back on and whether the generator's drain is cleared before it is refilled.

St. Louis roofs can go from warm afternoons to hard freezes within a few weeks in late fall. If the roof is open overnight during a cold snap, the bath's supply line should be drained and the steam generator should be kept above freezing. Ask each roofer how an open roof is handled on a cold night, and whether the bath's water is shut off when the crew leaves for the day.

Permits that sit beside the roof permit

A roof permit covers the roofing work. A new or altered steam shower usually needs its own plumbing and electrical permits, and those can be pulled through a different desk or on a different schedule than the roof. In St. Louis County, the desk that handles a roof is not always the desk that handles a plumbing change. Ask each roofer which permits the bid assumes, and check with the municipal permit desk for your address to see which permits are already on file before the steam unit is installed.

If the steam unit is installed after the roof, its electrical circuit should be inspected before the wall is closed. If it is installed before the roof, the roofer should know where the generator and its drain sit, so the flashing and the vent do not land on them.

What to ask each roofer

  • Where is the steam generator, and is it on the same wall the crew will work on?
  • Which valve stops water to the bath, and who turns it off and back on?
  • How is the glass door and tile floor protected from tear-off grit?
  • Is the steam unit powered down at the breaker for the roof week, and who makes that decision?
  • How is the bath handled on a cold night if the roof is open?
  • Which permits does the bid assume, and which desk pulls them?
  • Who photographs the glass track and tile corners before tear-off starts?

Write each answer beside its question, and check the answers against the scope the roofer hands you. If a roofer cannot answer a question about the bath, that gap is worth knowing before you sign.

Where the bath fits in the roof bid

A roof bid is a roof bid. It should not carry the steam unit, the tile or the plumbing work in its price. What it can do is name the bath as a protected area and state how it is protected. A line that reads "bath wall protected, glass covered, water valve named, steam unit powered down by homeowner" is clear. A line that reads "bath protected" is not. The difference matters when a stain, a crack or a bent glass track shows up after the crew has left.

Keep a copy of the scope and the photos in the same folder as the steam unit's paperwork and the plumbing permit. If the bath needs work later, that folder shows what was there before roof day.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office