A shed dormer is the flat-topped box that pushes out of a sloped roof to make room for a bathroom or a bedroom under the eave. On many older Ladue houses it sits against the main slope like a second roof that was added later, and that means the place where the two roofs meet is a separate piece of work. Most roof quotes list the shingles on the dormer roof as one line and the main roof as another, then fold the joint between them into a general labor figure. That joint is where water finds its way in during a February thaw, so it deserves a line of its own.
Where the dormer meets the main slope
A shed dormer usually touches the main roof in three places. The two sidewalls rise from the main slope to the dormer's own roof, and the back wall is the upper edge where the dormer roof leaves the main slope and turns up. The back wall is the one most homeowners never see from the yard. It is the seam that runs across the roof at an upward angle, and the flashing along it is what sends water down over the shingles instead of behind them.
On a well-built dormer the back wall gets a continuous piece of metal, often called a backer or back pan, bent to the angle of the joint. The upper shingles lap over it and the lower shingles lap under it. Where each sidewall meets the main slope, step flashing runs up the side one piece at a time, woven into the shingle courses. Each piece should be counted before the shingles go on, because a missing step is easy to overlook once the roof is covered and nobody can see the gap from the ground.
What goes wrong at the upper wall
When water gets past the back wall, it runs down the dormer roof and under the main-slope shingles. The first sign is often a stain on the ceiling of the room directly below the dormer, sometimes weeks after the rain that caused it. On older houses the usual cause is a back wall sealed with a bead of caulk instead of metal, or a backer lapped the wrong way so that water runs into the seam rather than off it. Caulk is a stopgap at this joint. It can look fine in October and split by January, because the freeze and thaw cycle in St. Louis moves the wood and the sealant at different rates.
The sidewalls fail differently. They take wind-driven rain from the southwest and the west, and that rain can push past step flashing that was set too high or nailed through the wrong course. A sidewall that leaks rarely shows the leak at the sidewall itself. The water travels along the rafter and shows up on the wall of the room below, which is why a stain several feet from the dormer can still trace back to the sidewall joint.
Ice at the back wall
Ice damming is the other reason the back wall needs a close look. Snow melts on the main slope above the dormer, the meltwater runs down to the back wall, and the cold eave below the dormer refreezes it. The ice builds up behind the shingles and pushes water under the laps. Ice and water shield is the membrane that is supposed to stop this, and on a shed dormer it has to run up the dormer roof and under the back wall, not stop at the eave line of the dormer. Many quotes name the membrane but never say how far it reaches on each side of the dormer, and that distance decides whether it does any good.
If your house has a north or east exposure at the dormer, ask how the membrane is lapped at the sidewalls as well. The membrane is only as good as its seams, and a sidewall that was membraned on one side and skipped on the other will show the gap the first time the snow stays on the roof for a week.
What it costs
The joint is priced in pieces, and those pieces should appear on the quote as separate lines. The dormer roof itself is one line. The back wall pan, measured in linear feet and listed by metal gauge, is a second. The sidewall step flashing, counted in pieces on each side, is a third. The ice and water membrane at the joint, measured by area and by how far it runs up the dormer, is a fourth. If the interior ceiling under the dormer needs to be opened for a leak check, that is a fifth line that some quotes leave out completely. A single total with none of these lines does not show you which pieces were included, and it does not show what happens if the back wall turns out longer than the crew measured from the ground.
The cost of these lines depends on the length of the back wall, the pitch of the dormer roof, and how many sidewall steps the joint needs. Those are measurements, not guesses, and a roofer who measured the dormer from a ladder or from the drive should say so in writing. If the number is a range, the scope at each end of the range should say what changes between them.
What to ask
Put these questions to each roofer before you compare totals. The answers will show you which quote has priced the joint and which one has priced the roof and hoped the joint would take care of itself.
- How many linear feet of back wall pan are in the quote, and what metal gauge and finish does it use?
- How many step flashing pieces are counted on each sidewall, and where does the count start and stop?
- Does the ice and water membrane run under the back wall, and how far up the dormer roof does it reach on each side?
- Does the quote replace the dormer roof shingles, or does it match only the main roof and leave the dormer as it is?
- Is the dormer shown as its own roof on the written diagram, with its slope and its joint marked?
- If a stain appears on the ceiling below the dormer in the first winter, who inspects it, and under what terms?
- Does the permit application describe the dormer roof as part of the replacement, and who checks the flashing at the inspection?
A roofer who answers each of these in plain numbers has probably walked the dormer. A roofer who answers with the word included and nothing more has probably not measured it, and the joint is where that gap will show up later.
Before the crew starts
Before the shingles come off, photograph the ceiling and walls of the room under the dormer, including any existing stain, and date the photos. Tell the crew which room sits under the dormer and where the ladder should stand so that nobody works from a spot that puts the ladder on the ceiling side of the wall. Ask where the old flashing will go and whether any of it is reused. Old step flashing that was bent to a different angle is not a safe thing to reuse at the joint, and the crew should say which pieces they will replace.
Ladue is its own municipality, so the building office that handles your address is the place to confirm what the permit covers. Ask whether the dormer roof is part of the permit scope, and whether the flashing at the joint is inspected before it is covered. Keys Roofing can walk the dormer on your house with you and put the joint lines into a written scope with photos and measurements, so you have the same count in your hands that the crew will use. To set up that walk, call (314) 220-2333.