Many older Ladue houses have a cellar that never became a basement in the modern sense. It sits under a back porch or a side terrace, sometimes built of stone or brick with a flat or arched vault, and it is reached by a short stair and a heavy lid. When the roof comes off, the crew needs somewhere to stage bundles, tear-off debris and ladders. If the flat area above the cellar is the only open ground on the lot, the staging pile lands on a structure that was never designed to carry it.
Why the cellar lid is a load question
A vault or lid over a root cellar is built for soil, a light slab and foot traffic. A stack of shingle bundles weighs far more than a family walking across a terrace. Asphalt shingles are sold by the square, and once bundled a single square often weighs somewhere between 200 and 300 pounds. A pallet holding several squares sits as a concentrated load on one small patch of the lid. Add a debris container edge, a pile of old decking and a worker standing still for an hour, and the total can exceed what the vault was sized for. Nobody knows that number unless someone asks the original builder or a structural engineer, and most homeowners have never been told it.
The risk is not only collapse. A lid that flexes under a pallet can crack the mortar at its edges, and a crack that opens during tear-off may not show until the next heavy rain finds it. Water then travels along the crack into the cellar, and the stain shows up weeks later in a place nobody was watching.
What to find out before the crew stages
Start by walking the area above the cellar with the homeowner and the roofer together. Look for the vault type. A visible arch of brick or stone under the slab, a steel lintel at the stair opening, a precast panel or a poured lid with rebar showing at the edge each suggests a different limit. If the cellar predates the last major renovation, ask whether drawings were kept with the house papers, since many older Ladue houses changed hands with their drawings still sitting in a closet.
Take these questions with you to the walk:
- Where is the top surface of the vault, and is there a visible crack or spalling at its edges?
- Is there a water stain under the stair landing or along the lid seam, which suggests the lid has been wet for years?
- Which open area will hold the bundles, and how far is it from the cellar hatch?
- Will the roofer lay plywood or steel plate over the lid to spread the load, and who pays for those sheets and their removal?
Write down the answers as the roofer gives them. A roofer who has worked around old cellars will name the spot and the protection without hesitation. A roofer who says the crew will decide on the day has told you the plan is not yet made.
Where the staging can go instead
Usually the right answer is the drive, a firm section of lawn or a side yard, not the terrace above the cellar. Ground-level staging on firm soil spreads weight across the subgrade and is easier to move if the crew needs to shift it mid-day. If the drive is gravel or pavers, check the crushed base before the trailer lands, because a soft base can settle under a loaded trailer and leave ruts that cost more to fix than the staging saved.
Large Ladue lots often have an open side yard with room for a pallet and a container. That space is usually a better choice than an area that sits over a void. The homeowner should also decide whether the lawn will be protected with boards or left open. Either choice belongs in the scope, with a named person responsible for putting the protection down and taking it up.
What the written scope should say
The roofer's written scope should name the staging area by location and state how the cellar lid will be protected. A line that says the crew will be careful is not a plan. Ask the roofer to write three things: the exact spot for shingle pallets, the spot for the debris container, and whether any weight will sit on the cellar lid at any time during the job. If the answer to the last one is yes, ask for the plywood or plate size, the number of sheets, and who places and removes them.
Missouri does not have a roofing license that settles staging questions, and no permit desk reviews where a pallet sits on your lot. The protection lives in the paper between the homeowner and the roofer. Keys Roofing puts a written scope with photos and measurements in the homeowner's hands before the first nail, and the staging plan belongs in that scope alongside the shingle line and the nail count.
When the cellar is still in use
Some cellars still hold canned goods, wine or old furniture. If the homeowner keeps the cellar in use, ask the roofer whether tear-off dust and any vibration from the crew will reach shelves below. Dust can come through the seam at the hatch and settle on everything inside, and the crew should cover the hatch during tear-off. Name who sets that cover and who removes it, and say whether the cost is inside the bid or billed separately.
If the cellar has a stair that the crew must use to reach a lower roof or a porch deck, mark that path as well. A stair that carries ladders and bundles needs a handrail check before the first load goes down.
Questions to ask before the site visit
Before the roofer comes out, ask one short question on the phone: where will the shingle pallet sit on my lot, and does that spot sit over the cellar? A roofer who has done this work will answer in one sentence. An answer that defers the decision to the day of the job is a reason to get the plan in writing first.
When you call the office at (314) 220-2333, ask that the staging spot and the cellar protection be recorded in the visit notes, not only in the conversation. Ask for the name of the person who will be on site and who will make the call if the staging spot has to change.
What to do this week
Walk the cellar lid with a tape measure and take photos from the same two corners each time. Note any stain under the stair, any crack at the lid edge, and the distance from the hatch to the nearest open lawn. Keep those photos in one folder and send the same set to each roofer with the same question. Compare the answers line by line, and check whether each one names the staging spot, the lid protection and the person who places the sheets. The roofer who puts those details in writing has given you the number you need to make the decision.