Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Purple Martin House on a Yard Pole Needs a Move Date Before Roof Day

A martin house on a yard pole can sit in the ladder path or the staging space, so settle its location and nesting dates before you set a roof date.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

Purple martins are one of the few birds that will nest in a box a homeowner puts up on purpose. In a Ladue backyard, a martin house usually sits on a pole in an open part of the lawn, often 12 to 20 feet up, and a colony can come back to the same house for years. When a reroof is coming, that pole belongs in the roof plan. The ladder that reaches the eave, the staging area for the shingle bundles, and the path the crew walks to the back of the house all depend on where the pole stands and whether anyone has to move it. This page is for the homeowner who has a martin house in the yard and a roof date on the calendar, and who needs to know what to decide before the first truck turns in.

Town roofing

Many Ladue roofs take several working days to tear off and reinstall, and the crew needs room for the dumpster, the trailer, the shingle bundles, and a ladder that can reach the eave without leaning on a shrub, a fence, or a play set. Many Ladue lots are wide and deep, which helps, but the open lawn a martin pole needs is often the same open lawn the crew wants for staging. That is the first place a conflict shows up. Walk the yard with the pole in mind and mark where it stands, where the ground is firm enough for a ladder foot, and where the ladder would have to sit to reach the eave on the side that is coming off. A homeowner who does this on paper before the crew arrives will catch the conflict early.

The second conflict is the nest. Martins are colonial birds. They usually return to the St. Louis area in late winter or spring, begin nesting in the house in late spring, and raise their young into early summer before they head south in late summer. An active nest is protected under federal law. The Migratory Bird Treaty Act covers many native birds, and the purple martin is one of them. That means a crew should not tear down an occupied house, disturb an active nest, or move a pole with birds in it. Whether a nest is active depends on whether eggs or young are present, and that check belongs to the homeowner and, where needed, to a wildlife professional, not to the crew's foreman.

Timing is what makes this matter in a St. Louis reroof. A fall or winter job avoids the martin season entirely, and many homeowners find that crews have more open dates then. A spring job, which many homeowners prefer because the weather is usually milder for installing shingles, runs straight into the nesting window. The date on this page is late October, which means the colony has probably already left for the year. The pole question is therefore a planning question for next spring rather than an emergency today. A homeowner who wants the pole to stay put through a spring roof has to say so in writing, because the crew will not know it unless the bid says it.

Ladue homeowners should also check with the city before the roof date is final. Ask whether a reroof needs a permit and what the permit desk wants on the site plan. If the plan changes where the crew stands or what gets moved, put that in the bid, and mention it when you ask the city. A ladder path through the side yard, a staging area in the drive, and any change to the pole's position are all things a homeowner should be able to describe on paper, and a clear description goes a long way toward a clean start.

What it costs

A martin pole and house do not belong inside the roofing price, and a bid that folds them into a general site work line makes the comparison hard. Ask whether the bid includes any work on the pole at all. Some crews will work around a pole that stays put and never touch it. Others will ask the homeowner to take the house down before tear-off, which is a homeowner task, and the bid should say so in plain words. If the crew is asked to lower, store and reset the house, that is labor and a small amount of time, and it belongs on its own line with its own number.

The cost people often miss is the cost of waiting. If the pole has to come out and the nest is occupied, the roof date slides until the colony has left, which in this region means late summer at the earliest. A bid that assumes a spring start and a fixed payment schedule can carry a timing problem built into it. Ask each roofer how the price changes if the start moves, and whether a delay caused by an occupied nest triggers any change in the number. A written answer costs nothing and prevents a surprise at the end of the job.

Shingles are priced by the square, and the number of squares does not change because of a pole. What can change is the labor to work around a fixed object, the time a ladder spends being moved, and the size of the staging area. Ask whether any of that is in the price, and ask for it priced separately if it is not. A roofer who says the price includes everything, and cannot say what everything covers, has not answered the question. Compare the answers side by side, the same way you would compare the shingle line or the flashing line.

What to ask

Put these questions to each roofer before you pick one. Write down the answer, and keep the page you were handed.

  • Where will the ladder stand relative to the martin pole, and will the pole stay in place, be moved, or come down?
  • If the house is occupied, who decides whether it can be moved, and what happens to the roof date if it cannot?
  • Who takes the house down and resets it, and is that in your price or a task you do yourself?
  • Where will the shingle bundles and the trailer sit, and does that space overlap the pole's base or the ground around it?
  • If the start moves to a later month, does the price change, and where is that written?
  • Who tells the crew about the birds on day one, and is that note in the job file?

Keys Roofing documents damage and puts a written scope with photos and measurements in the homeowner's hands. Use that scope to record the pole's location, the ladder path, and the staging space before the first nail goes in. A dated photo of the pole taken from the yard is worth more than a sentence in an email, because it shows exactly where the pole stood on the day the crew arrived.

If you want to talk through the yard before you set a date, call (314) 220-2333. Bring the pole's location and a rough sketch of the lot, and ask the crew to mark the ladder path on it before any date is confirmed.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office