Most roof conversations start with shingles and end with a price. A smaller question sits underneath both: how much of your lot the finished roof, its gutters and its downspouts will cover, and where the water goes after it leaves the roof. If you are replacing a roof on exactly the same lines, that question may take five minutes. If you are adding a dormer, widening a porch roof, or building a new roof over a bay while the main roof is open, the answer can change what a permit desk may ask to see and what the drainage plan has to show.
What impervious area means on a residential lot
Impervious area is the part of a lot that water cannot soak into. Roofs count, and so do driveways, patios, solid walks and compacted gravel. City staff and engineers use the figure to judge how much rain runs off a property during a storm and where that runoff ends up. Some municipalities cap the share of a lot that can be covered. Some ask for a drainage or grading sheet when that share grows past a set point. Others review only larger projects. Which of these applies in your case is a question for the city, and it is not something a roofer can answer from memory of other jobs.
For a homeowner, the practical point is simple. The roof itself is not the only thing that changes when the roof changes. The footprint, the eave lines, the outlets and the ground under the outlets all belong to the same question.
When a roof job changes the number
A tear-off and reroof on the same footprint usually leaves impervious area where it was. The change shows up when the work adds area. A new dormer pushes the roof outward. A porch roof rebuilt a few feet wider adds a new plane. A bay or sunroom that gets its own roof adds a second footprint. A flat section that becomes a patio after the main roof is done adds a hard surface where there was lawn. Any of these can move the figure, even when the shingle line on the house looks unchanged.
Drainage can change without any new square footage. A downspout that used to empty onto the lawn may be moved to the driveway edge because the new gutter layout needs a different outlet. That move can send water toward a neighbor's line or into a low corner that never saw it before. The square footage is the same, but the water path is new, and a careful permit desk will ask about it if the drawings show it.
What to bring to the permit desk
Before the crew writes a number, gather three things. The first is the plat or survey showing the lot lines and the house footprint, with any easements marked. The second is the roof plan with the new eave and ridge lines drawn in, including any added area. The third is a sketch of each downspout with its outlet point and the direction the ground falls at that point. With those three pages, a permit desk can tell you whether it wants a grading or drainage sheet, whether a separate review applies, and how it counts covered area.
Ask the desk to name the document it wants in writing, and write down the name of the person who said it and the date. If the answer changes after the bid is signed, you will know which page to hold the roofer to. If you live in a part of Ladue where the permit desk is not the city hall you expected, confirm that before you send anything. Mailing addresses and the office that signs the permit do not always match.
Questions to ask each roofer
- Does your bid change the roof footprint, or does it replace the roof only on the existing lines?
- Where will each downspout discharge, and is that spot the same as it was before the job?
- Who prepares a drainage sketch if the city asks for one, and is that sketch inside your price?
- If the city asks for a revised sheet after the bid, who pays for the revision and who waits for the answer?
- Will the crew's staging area, the dumpster or any new temporary surface sit on the lawn, the drive or the walk, and will any of it stay after the job?
- Can you mark each outlet on the roof plan before the crew arrives, so you can see the water path in advance?
A roofer who answers these in writing is giving you a usable comparison. A roofer who answers them in passing has not yet priced the part of the job that touches your lot. If you want to talk through the office side of a question like this before you decide, the Keys Roofing office line is (314) 220-2333.
Downspouts, outlets and the freeze
St. Louis winters add a second test to every outlet. Water that lands on a walk or a driveway apron in a thaw can refreeze overnight into a sheet of ice, and the outlet that looked fine in October becomes a slip hazard by January. An outlet that discharges into a low corner can also hold water through the freeze-thaw cycle and push at the ground until a joint opens. Neither of these shows up on a bid sheet, so ask where each outlet lands and whether the splash point is paved, planted or bare.
If an outlet has to move, the splash point should move with it. A downspout extension that runs across a front walk is a trip line, and it is worth routing before the trough is cut. Ask the roofer whether the outlet change is in the bid as its own line, because outlet work done after the gutter is hung is often more expensive than the same work done before.
Flat sections change the water path
A low-slope porch roof or an addition roof drains to a single point, and that point often sends water over a walk or into a planting bed. If the new work lowers, raises or extends that flat section, the water path changes with it. The drain, the scupper or the edge metal decides where the water leaves, so price those pieces as named lines in the bid. Ask how many drains the roofer counted and whether the count was taken from a measured plan or from a photo.
Flat sections also carry the most surprises when the water leaves over a patio edge or a door sill. If the flat section sits above an entry, ask whether the crew will walk the edge metal before the membrane goes down, and whether that walk is written into the schedule.
Walk the lot before the crew does
Take a walk on the lot after a heavy rain, before any work starts. Note where the water pools, where it leaves the property and where it crosses a walk. Photograph each spot with a date on the image. That walk gives you a baseline you can compare to the finished job, and it gives the roofer a clear picture of what the drainage looked like before anyone moved a ladder. On an older lot, grading may have shifted over the years, and a shallow low spot can hold more water than the eye expects.
Ask the roofer to show where each outlet will land on your own survey or a sketch of your lot, not on a generic drawing. A generic drawing can show a downspout in the right place for the house and still miss the neighbor's fence or the low corner by the garage.
What to keep in your folder
Keep the survey, the drainage sketch, the permit correspondence and the signed scope together in one place. Date each page as you receive it. If the city later asks what changed on the lot, or if a neighbor asks where the new water goes, you will have one folder with dates on each page instead of three inboxes and a pile of receipts. The same folder is useful when a final inspection is scheduled, because the inspector will want to see the outlets and the splash points that the drawings promised.