Some older houses in Ladue have a laundry chute that runs from an upstairs hall or bath down to a basement or first floor utility room. In a number of these houses, the top of the chute sits in a closet or a short wall that rises into the space above the second floor ceiling. When the roof comes off, that opening becomes a direct line from the work zone into the rooms below. If nobody has named who caps it, the chute can carry tear-off dust, nail heads and small shingle pieces down into the laundry room, the basement stairs, or whatever sits at the bottom.
This is a small item on a roof bid, and it is easy to skip because nobody thinks of the chute as part of the roof. It is part of the roof work, though, because the crew is cutting and lifting shingles directly above it. The decision you need to make is simple: who covers the top, who covers the bottom, and who cleans up anything that falls in before the job is closed.
Where the chute actually ends
Before you talk price, find both ends of the chute. Go into the upstairs closet, open the door, and look up. Then go to the basement or utility room and look at where the chute lands. Write down the two locations, the approximate height of each opening above the floor, and whether there is a metal door, a wood door, or no door at all. A chute with no door at the top is an open shaft.
Ask whether the chute passes through the attic at any point. In some houses the chute runs up past the second floor ceiling and ends under the roof deck. In those houses, the crew working on the roof above the chute is working over an open hole that runs straight down through the house. Ask the homeowner what the chute was built for, whether it was ever used after a remodel, and whether it still has a working door. You will not learn this from a floor plan, and a roofer who has only seen the outside of the house will not know it either.
Why the cap matters on roof day
Tear-off produces fine grit, old granules, nail heads and broken pieces of shingle. Much of that falls straight off the roof edge, but some of it goes wherever the air carries it. A crew pulling shingles from above an open shaft can push debris into the chute, and once it is inside, it lands at the bottom and sits there until someone opens the door.
Dust is a second issue. A chute acts like a narrow chimney for air moving between floors. If the bottom door is open and the top is not sealed, dust can travel into the laundry room or basement even when the rooms where the crew works are closed off with plastic. Closing one room does nothing for a chute that connects to the room next to it.
Rain is the third reason the top needs a cover. St. Louis storms can arrive with little warning in late spring and summer, and a roof that is open for a day can take water. Water that gets past an open roof edge and into a chute runs downward and can soak the floor at the bottom before anyone notices. A cover over the top is the only thing that keeps that path closed while the roof is open.
What to settle before the crew arrives
A written plan for the chute should answer four questions. Who covers the top opening in the closet or attic, and with what material? Who covers the bottom opening, and does that cover stay in place until the final walk? Who checks the chute for debris at the end of each working day? And who removes anything that has already fallen in, and is that removal shown on the bid or billed separately?
For the top, a rigid panel such as plywood, screwed or taped over the opening, is a common approach. For the bottom, a sealed door or a heavy plastic cover taped tight to the frame does the job. The material matters less than the fact that it is named. A line that says the crew will protect the chute leaves the method open to the crew's judgment on the day, and that judgment is usually made when the crew is tired and the shingles are coming off faster than planned.
Ask each roofer whether the chute cover is a separate line in the bid or part of a general interior protection line. A general line can be correct, but only if the roofer will show you what it includes. Ask what happens if the chute cover is damaged or knocked loose during the day, and who replaces it before the crew leaves.
Who handles the inside of the house
A roofing crew works on the roof. The chute is inside the house, often in a closet or hall that the roofer does not otherwise enter. That is why the answer belongs in writing. Ask each roofer who walks into the closet, who covers the opening, and whether the crew will tell you before they open the chute on the day the job is finished.
If a roofer says the homeowner should handle the chute, write that down as well. It moves the work to you, and it may need to be scheduled before the roof day, especially if the cover has to be cut to fit the opening. A plan that depends on the homeowner being home at the right hour is weaker than one the roofer owns.
What it costs
A chute cap is usually a small line compared with the roof itself, but it is a real cost. Plywood, tape, plastic, and the labor to measure and fit them all take time. If the chute is long, or if the bottom landing sits in a finished room that needs floor protection, the cost rises with the amount of protection needed. Ask each roofer to name the cover as its own line and to say whether it is included in labor or charged separately.
Do not accept a single number for interior protection without knowing what it covers. Two bids can show the same total while one includes a sealed chute cover and the other covers only the stairs. Compare the lines by what they protect, not by how they are labeled.
What to ask
- Where does the chute open at the top, and is there a door on that opening?
- Does the chute pass through the attic or end at the roof deck?
- What material covers the top, and who fits it before the first shingle comes off?
- What covers the bottom, and does that cover stay in place until the final walk?
- Who clears any debris that has already fallen into the chute, and when does that happen?
- Is the chute cover written into the scope with the same wording that appears in the bid?
- If rain starts while the roof is open, who checks the chute cover before the crew leaves?
Before the first shingle comes off
Ask the homeowner to open the chute door and take a dated photo of the inside, top and bottom, before the crew starts. A phone photo is enough. Take one of the closet or hall where the top opens, and one of the room where the bottom lands. That gives everyone a reference if a question comes up after the job, and it shows the condition of the chute before any work touches it.
Keep those photos with the rest of the roof paperwork, along with the signed scope. If the chute is not on the scope, add it before anyone signs. A chute cover is a small detail, but on a roof day it is one of the few places where dust, water and debris can reach the rooms of the house the homeowner uses every day.
For questions about the chute or any other line in a roof bid, call Keys Roofing at (314) 220-2333. Ask for the written scope to be sent to you before you sign anything, and read the interior lines as closely as the shingle lines.