A hospital bed in a bedroom is not furniture on a roof job. It has a motor, a power cord, controls that get bumped, and a person who has to sleep in it while the crew works above the ceiling. Many roofing bids do not mention it, so the question tends to land on the first morning, when the crew asks where the bed is supposed to be. Settling it before the date is set is far easier than moving a bed on a day when the ladder is already against the eave.
Town roofing
Ladue has a lot of two-story houses where the bedrooms sit directly under the main roof, and the roof deck and attic are the zone where tear-off dust and nail debris move first. A bedroom on the upper floor is usually the room closest to the work. Ceiling plaster or drywall can shake when the crew strips the old roof overhead, and dust that comes through a light fixture or a bath fan settles on whatever is below it. If the bed is in that room, the question is not only where the bed goes but whether the room can stay closed off for the length of the job.
St. Louis weather adds a second layer. A tear-off in April can run into a thunderstorm, and a tear-off in November can run into a night that drops below freezing with part of the deck still open. A roofer should be able to say in plain words how the roof is closed each evening, but the closing is only as good as the plan for the room below. A person in a hospital bed cannot easily get up and move if a tarp fails or a cold draft comes through an open attic hatch, so the room needs a heat plan and a clear path for a caregiver before the crew starts, not after.
Where the bed goes on tear-off day
There are three workable answers, and each one needs a name and a date in writing. The first is to move the bed to another room on the main floor for the whole job. That keeps the person away from dust and the crew's ladder line, but it needs a clear route through the house and a second room that can take a bed and a bedside table. The second is to keep the bed in place and seal the room, which means hanging plastic sheeting over the doorway, taping the return grille and the bath fan, and asking the crew to use only the stairs on the far side of the house. The third is to move the person, with the bed, to a relative's home or a rented room for the hardest days. That is a family decision the roofer cannot make for you.
Whichever answer you pick, put the room and the dates into the scope. "We will protect the bedroom" is not a plan. "The upstairs rear bedroom is sealed on tear-off days, the return grille is covered, and the crew uses the side stair" is something a crew lead can follow and you can check at the end of each day. The same line should name who moves the bed, who sets it back, and what happens if the bed has to move twice because the schedule slips.
Power, controls and the cord the crew will step over
A hospital bed draws power from a dedicated outlet, and that outlet is often the one place a crew does not think about. The crew's tools run off a generator or an extension cord from the drive, and a crew member who trips a breaker can shut off the bed's head and foot motors at the wrong moment. Before the first day, ask the roofer where the crew will run its power, whether it will use the bedroom circuit, and who will check the bed's controls after each break. A plug that is labeled and kept out of the crew's path prevents a large problem with very little effort.
Backup matters too. If the house loses power during a storm, the bed's motor may stop, and some beds have a manual crank that needs someone who knows how to use it. Ask the person who uses the bed, or the caregiver, to show the roofer where the crank is and whether the bed can be lowered by hand. This is a homeowner's check rather than a roofing task, but it belongs in the same conversation.
Dust, air and the mattress
Tear-off dust is fine grit, granules and old felt, and it reaches a mattress through open windows, the bath fan, and the attic hatch. A zippered mattress cover keeps grit off the surface, and clean bedding changed after each roof day is a simple habit. If the person in the bed has breathing problems, an oxygen concentrator or air purifier also needs a line in the plan, because tear-off can throw dust into the room even with the door shut. Ask each roofer how they keep the house air clean during tear-off and whether they run a fan that pulls air out of the work area.
What it costs
The bed itself costs nothing to the roofer, but the labor to move it, disconnect and reconnect it, and set it back is real. Many roofing bids do not include furniture moves, and a homeowner who assumes the crew will move a hospital bed will find out on the day. Ask whether the bid includes moving furniture in the room or only protecting the floor, and get the charge for any move in writing, whether it is flat or hourly. If a relative or a paid helper has to be present on each roof day, that cost sits outside the roof bid and belongs in your own planning.
Renting equipment for a second room, such as a second bed or a commode, is also a household expense. Count these costs before the date is set. A roof date that slips two weeks because the bed move was never planned can cost more in caregiver time than the roofer's move charge would have been.
What to ask
Put these questions to every roofer, and compare the answers word for word. For this room, the answers tell you more than the price does.
- Which room will the crew treat as the clean room, and who seals it on each roof day?
- Does the bid include moving the bed, and if so, who moves it and who sets it back?
- Which circuit will the crew use, and who checks the bed controls after each break?
- How is the roof closed each evening, and what happens to an open section if rain or a freeze arrives overnight?
- Who is the named contact on the crew when a caregiver needs the work stopped for a few minutes?
- What happens if the roof date moves and the bed has to move a second time?
A roofer who answers each of these in plain sentences has likely planned for a room like this before. A roofer who says the crew will "work around it" has not written the plan down yet, and the written scope is where the plan belongs. Ask for the scope to name the room and the dates, and read it aloud before you sign.