Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Home Laser Cutter's Exhaust Duct Needs Its Roof Vent Named Before Tear-Off

A home laser cutter in a Ladue basement or garage may vent through the roof, so name that penetration and its cap before the crew writes a number.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A laser cutter is showing up in more Ladue basements, garages and home offices, and it can put a duct through the roof that nobody listed on the first walk. The machine is a cabinet with a sealed beam, a chiller and a fan. When it cuts acrylic, wood or some plastics, it throws smoke and fumes that have to leave the building. Most owners run that exhaust through an exterior wall. A fair number run it up through the roof deck instead, because a basement or a second-floor room has no clean wall path. If yours does, the roof crew needs to know before the number is final.

Why the exhaust path is a roof question

An exhaust duct through the roof is a penetration. It has a flange or a curb, a cap or hood at the top, and a seam where the duct meets the roofing. Each of those is a place where water can get in, and the flashing around it is part of the roof, not an extra. When a bid says "vent," it may mean a plain box vent, a roof jack sized for a bath fan, or a dedicated exhaust cap sized for a larger duct. Those are different parts with different prices, and the difference only shows up if you ask which one is meant.

The size matters too. Many cutters ask for a duct at the outlet that is larger than the duct a bath fan uses. If the roof opening is cut for a smaller duct, the crew will either cut it again or fit a reducer that nobody priced. Ask the roofer to write down the diameter the machine needs and the diameter the roof penetration will be built for. If those two numbers do not match, one of them is wrong.

What to write down before the bid

The bid is only as good as the facts it starts from. Before you sign anything that touches the roof, gather the following and give them to every roofer who comes to look at the house:

  • The make and model of the cutter, and the duct diameter its manual requires at the outlet.
  • Whether the duct is rigid metal, semi-rigid or flexible. Flexible duct sags, traps residue and is harder to flash cleanly.
  • The exact roof location, measured from two fixed points on the house such as a gable wall, a chimney or a dormer cheek.
  • Whether a fan is installed inline with the duct, and where its power comes from.
  • Which roof plane the duct crosses, and whether that plane is also the one being replaced first.
  • Who decides, and in writing, whether the vent moves if the crew finds rafters or blocking in the way.

Keep the list in the same folder as your bids. If a roofer answers one of these by saying they will "figure it out on site," write that answer down next to the question and ask what it does to the price.

Ladue houses and the second roof plane

Older houses in the metro often carry several roof planes, valleys and dormers, and a basement room that was finished later may sit under a roof section that is hard to see from the drive. That is where a laser cutter duct tends to end up. The room is in the lower level, the nearest wall is blocked by a stone foundation or a finished space, and the only clean route is up through a plane that sits behind the ridge from the street. The roof crew may only see that plane from a ladder at the eave or from the far side of the ridge, so the location needs to be marked on paper before anyone climbs.

Ask the roofer to mark the vent on a simple sketch of the roof, with compass directions and distances from the nearest fixed point. Keep a copy yourself. If the crew later needs to move the penetration by a few feet, the sketch shows you whether the new spot is still on the same plane and whether the change was agreed to.

Permits and the municipal desk

A new roof penetration does not always need a separate permit, but the roof permit that covers the job should describe it. Municipal building desks in St. Louis County and in the cities around it each have their own forms, and they do not all handle a roof penetration the same way. Some expect it on the roof scope. Others want a separate line for mechanical work. The only way to know which applies to your address is to ask the desk that serves your property.

Ask the roofer which desk they will pull from, whether the exhaust cap appears on the scope they file, and whether a change in the roof vent after the permit is issued needs a revised drawing. Write the answers down. If the roofer says the vent will be handled "with the permit," ask them to show you the line on the form that says so.

Tear-off dust and the cutter

Tear-off throws granules, fine dust and small pieces of old roofing into the air and onto anything below. If the cutter sits in the room under the vent, that debris can reach its intake, its lens bed and its exhaust fan. A cutter that draws dust into its optics can lose alignment, and a fan that pulls grit can wear out early. None of this is hard to prevent, but it has to be named.

Ask each roofer how they will protect the cutter and the room below during tear-off. A good answer covers the intake with a fitted cover, seals the room door with plastic and tape, and says whether the crew will shut the machine down for the day when the roof is open over it. Ask whether the cover goes on at the start of the workday and comes off only after the final sweep. A vague answer about "cleaning up" is not enough for a machine that costs what a laser cutter costs.

Heat, fumes and the open roof

Some cutters run for hours. When the roof is open over the room, the duct may be the only path for heat and fumes to leave, and the crew may need to change the plan for that day. If the vent is disconnected during tear-off, the cutter cannot run safely, and the homeowner should know that before the crew starts. Ask whether the cutter must be off during the open-roof hours, who decides when it can run again, and whether the duct is capped with a temporary cover on each night.

Also ask what happens if rain gets into the open duct. Water that enters a duct can run down into the room below, and a damp duct can smell or stain before anyone notices. The temporary cover should be tight, weighted or strapped, and checked at the end of each workday.

What to ask each roofer

  1. Will the exhaust penetration be built for the cutter's required duct diameter, and who checked that number?
  2. Does the bid name the cap, the curb or the jack, and what does each one cost?
  3. Where on the roof will the vent sit, and can you see it marked on a sketch before the crew starts?
  4. Who moves the vent if rafters or blocking get in the way, and does the price change?
  5. Which desk will the permit be filed with, and does the exhaust penetration appear on the scope?
  6. How is the cutter covered and protected during tear-off, and when is it shut down?
  7. How is the open duct capped each night, and who checks it?

Compare the answers the way you would compare any two bids. A roofer who answers all seven in writing, with a sketch and a line item for the cap, has given you something you can check. A roofer who answers in general terms has given you a reason to call back.

When the vent should be decided

Decide the vent location before the roof date is set, not after the first shingle comes off. Once the old roof is open, a move costs crew time, and it may force a change to flashing that was never priced. If you are still choosing a roofer, give the sketch and the cutter's specs to each one at the same time, so the answers are comparable.

If you want the roof visit to cover the cutter's vent, tell Keys Roofing about it when you call at (314) 220-2333, and say that the cutter is part of the scope before the visit. A roof visit can look at the penetration, the plane it crosses and the clearance from the ridge, and it can put those notes in writing for you to keep. The point is to have the vent named on paper before the crew arrives, so the number on the page matches the work on the roof.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office