Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Heating Oil Vent Can Reach Your Eave, So Put It in the Roof Quote

An older Ladue house may vent its heating oil tank up the wall to the eave, so find that pipe before the roof crew does.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

If your Ladue house still heats with oil, it has a tank somewhere on the property and at least two pipes running to the outside. One is the fill pipe, where the delivery truck connects. The other is the vent, which lets air out as the tank takes in fuel. On older houses on the larger lots, the vent does not always stop at the foundation. It can climb along an exterior wall, bend under the eave, and end close to the roof edge. A roof crew working that edge with ladders, a tear-off, and a dumpster will reach that pipe whether or not the bid mentions it.

This page is for the homeowner who has a roof decision in front of them and has not yet walked the outside of the house with the heating company in mind. The answer you need is simple: find where the vent ends before you pick a roofer, and make sure every bid says what happens to it.

Town roofing

Ladue houses were built across several decades of heating changes. A house that started on coal, moved to oil, and was later partly converted to gas may still carry a vent that no one has looked at since the conversion. The pipe is often painted to match the trim or siding, which makes it easy to read as a downspout or a bit of conduit. When a roofer writes a quote from the street and a quick look at the attic, the outside pipe usually does not show up at all.

Freeze and thaw cycles make the vent's end a practical question here. A vent that is crushed, shifted, or packed with ice cannot do its job, and a St. Louis January tests every joint. Ice that builds at the eave can work up under shingles near any pipe that passes the roof edge. Water then runs down the pipe and into the wall. A homeowner would rather learn about a poor termination on a dry October afternoon than after a thaw has started a stain on the wall below.

The gutter line matters too. On many of these houses the downspout discharges within a few feet of the vent, and the splash from a full trough can run down the pipe and wet the wall around its base. Ask the roofer whether the gutter work will be done while the vent is still in its current place, or whether the pipe will need to be lifted and reset during the gutter install.

The fill pipe usually sits outside the house near the tank side, under a cap, and rarely reaches the roof. The vent is the one to watch. Ask your heating company whether your tank has a vent that runs up a wall, and if so, where it terminates. The answer tells you whether the roof crew will need to work around it, whether the eave is involved, and whether the pipe will have to be disconnected and reset when the new fascia or gutters go on.

What it costs

No roof bid should carry a price for the oil lines themselves, because that work belongs to the heating side. The cost of the pipe has three parts. First, the heating company visit, where a technician disconnects, caps, and checks the lines so the roof crew can work safely. That is a separate invoice from the roof. Second, the roofer's time to flash, seal, or re-set the vent where it passes the eave or the roof edge. Third, any new termination piece if the old one cannot be reused.

A roof bid is incomplete when it has no line for that work at all. Look for a sentence that says the crew will work around existing oil vent piping, or a line that says the homeowner's heating contractor will disconnect and reseat it before the tear-off. If the bid says nothing, the first crew morning becomes the time you negotiate. When you compare totals, count the missing line as an open question, not as zero.

Keys puts the written scope, the photos and the measurements in your hands before the work starts, so the pipe's location is in the file with everything else. The heating visit is for your oil company to schedule and invoice. Keys will not tell you what that visit should cost. If you want to ask about the roof side of the pipe, the office number is (314) 220-2333.

What to ask

Ask these before you sign anything:

  1. Does the house have an oil tank, and if so, where do the fill pipe and vent leave the building?
  2. Where does the vent end: on the wall, at the eave, above the roof edge, or into the soffit?
  3. Who disconnects and caps the lines, and will that visit happen before the tear-off date?
  4. Does the roof bid include the flashing, sealant or sleeve needed where the vent passes the roof edge?
  5. Will the crew photograph the vent before the tear-off and again after the new roof is set?
  6. Who checks that the vent is open and clear before the final walkthrough?

Put the answers in writing, next to the roof scope. If your roofer cannot answer the first question on the phone, that tells you something about how the rest of the job will be documented. Keys writes the scope and attaches the photo log, and that log is the document you keep if the heating company later asks where the crew worked.

Do not let the roof crew move, cut, or reroute an oil line to make room for a ladder. A ladder can be set somewhere else. A line that is bent or loosened on roof day becomes a call to the oil company on a cold morning. The crew's job is to know the pipe is there, work around it, and stop when it is in the way.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office