Many large houses in Ladue have a conservatory, sunroom or glazed garden room built off the back, sometimes added decades after the main house went up. If yours has a glass roof, the shingle work on the main house is only part of the job. The glass has its own frame, its own sealant and its own line where it meets your house wall. A roof bid that says "replace roof" without naming who handles that line leaves the most failure-prone seam unpriced.
Town roofing
Ladue sits in St. Louis County, and much of the older stock here was built with masonry walls and a steep main roof, with a conservatory added at a lower pitch later. Those additions often have a ridge or a lower edge that runs straight into the house wall. That meeting point is where water gets in. Counterflashing has to be cut into the masonry joint, the base flashing has to sit under the glass frame, and the glazing may be done by a different crew than the one that installs shingles.
The local weather works on that seam in two ways. In winter, the freeze and thaw cycle pushes on glazing sealant and on the masonry joint, so a bead that looks sound in October can separate by February if it was laid on a cold surface. In spring, hail season brings the risk of cracked insulated glass panels and dented aluminum caps on the glass frame. Hail that cracks an insulated unit often shows up later as condensation between the panes, which is easy to mistake for a seal problem alone. Both risks mean the bid should say what happens to the glass, not only to the shingles.
The shingle portion of a conservatory roof is usually simpler, but it still has details that differ from the main house. The eave and valley need ice and water protection, and the lower slope may need a different underlayment plan than the steeper roof above it. Keys installs Atlas and Malarkey shingles, so the spec should name the product and the underlayment under the membrane, and it should name the same things for the conservatory as for the main house.
What to check on the glass before the bid
Before any roofer walks the job, ask a plain question: which parts of this roof are glass, which are shingle, and which are metal? Many conservatory roofs are a mix. The glass slope drains into a gutter, a box channel or a hidden trough, and that outlet is often concealed behind a trim board. If nobody has traced where it discharges, the water may run back toward the foundation.
Walk the glass with the roofer before the crew arrives. Look for existing cracks at the pane edges, condensation between the panes, loose glazing stops and any repaired seams. Take photographs with the date stamp on, and keep them in your own folder. If a pane is already cracked, say so in writing before the work starts, because a pane broken during tear-off will be hard to separate from one that was already failing.
Ask how the glass panels will be removed and stored. Some conservatory roofs have panels that lift out as a unit, and others have glass that is set into a continuous frame. The method changes how many hours the crew needs and how much of the frame has to be reset. A bid that says only "glass roof replaced" is not telling you which method it uses.
What it costs
A glass conservatory roof should not be priced as a single line item. The bid should show the shingle area, the glass area, the sealant, the flashing at the house wall and any glass replacement as separate lines. A lump sum hides who bears the cost of a pane that breaks on tear-off day, and it hides the difference between a sealant job and a full glazing reset.
Ask for the lead time on replacement glass before you sign. Insulated units and custom frame sections are often ordered after the measurement is taken on site, which means the crew may have to stop work and wait. If the bid does not say who pays for that wait, the wait will be a change order later. The same goes for a bid that includes a sealant allowance without a stated quantity.
Compare the masonry work separately as well. Cutting counterflashing into an old joint takes time and patience, and some roofers quote it as part of the shingle install while others quote it as a masonry sub. Neither is wrong, but the bid should say which one applies, so you can compare the same work across two quotes.
What to ask
- Who installs the glazing, and is that crew named in the contract?
- At what air and surface temperature is the sealant applied, and is that limit written into the schedule?
- Where does the counterflashing sit in the masonry joint, and what metal is it made from?
- Who photographs the glass panes before the crew disturbs them, and who keeps those photos?
- If a pane cracks during tear-off, who orders the replacement, and who pays for the lead time?
- Where does the gutter outlet from the glass slope discharge, and who checks it after the first rain?
- Which parts of the roof are shingle, glass and metal, and does each have its own line in the bid?
A roofer who answers these questions in writing has already thought about the seam. A roofer who says the glass will be "taken care of" has not, and you should ask for the answer before choosing a date. If you want to talk through a specific Ladue conservatory before you decide, call Keys at (314) 220-2333 and describe which parts of the roof are glass and where they meet the house.