Many estate drives in Ladue pass under something with a roof on it. It might be a stone gatehouse with a slate or tile hip, a lodge beside the drive with a shingled gable, or an iron-and-timber arch over the gate that carries a short pitched cap. When the house gets a new roof, these structures often get left out of the first conversation and then come up on the day the trucks arrive. This page is for the homeowner who has a gatehouse, lodge or gate arch and is deciding how to put it into the job.
A separate structure is a separate roof. The gatehouse has its own rafters, its own deck, its own drip edge and its own flashing where it meets a wall. Pricing it as a corner of the house bid means the crew size, ladder setup and material count for that structure are being guessed at. A gate arch is smaller but still has a roof surface, fasteners and metal at the joints. Either one needs a line in the quote that you can read by itself.
Town roofing
Ladue has a mix of older estate houses and newer custom homes on large lots. Gate structures often sit at the street edge, where the lot line, the public right-of-way and the private drive meet. That spot is where the shingle truck wants to turn in and where the trailer wants to stand. A gatehouse at that corner can take up the same space the crew needs for the dumpster and the pallets.
Stone gatehouses are where a roof meets masonry. The usual problem is the counterflashing, the metal set into the mortar joint above the roof edge. In older stone, that joint may be worn, and the roofer will have to cut or reset it. Ask who resets it and in what metal. The same question applies to the coping on a stone pier cap, which sheds water off the top of the gate structure. If the pier cap is reset, that is masonry work and should be named in the bid as masonry, not left inside shingle labor.
Gate arches and lodges with timber framing can have a tight attic. Many have a tall ridge and a short run to the wall plate, so the crew has little room to work from inside. Ask how the crew gets to the roof without standing a ladder against a stone wall that is not theirs to load. Ask whether the lodge has a stair or a hatch, and whether anyone plans to go up through it.
Iron gates on a motor operator need their own check. The gate arm, its wiring and its power source often run through the same trench as the drive lighting. A roofer who pulls shingle bundles through the gate opening can knock the gate or its safety sensors out of alignment. Ask the roofer to name the gate hours on roof day and who opens and closes the gate for the crew.
Ladue homeowners who keep the gate closed on weekdays should also settle drive access on paper. A gated estate drive may need the homeowner or a family member at the gate for each arrival. A crew that arrives at seven and is locked out until nine loses the morning, and the bid should say what that wait costs and who bears it.
What it costs
A gatehouse roof is priced by its own square count, its own flashing and its own staging. A single line for gatehouse inside a whole-house number hides the squares, the pitch and the metal. Ask for the square count for the gatehouse alone, and ask whether that count came from the same measurement as the house or from a separate measure. If the gatehouse is a hip roof, the hips and ridge need their own lengths. If it is a gable, the rakes and eave trim need their own footage.
Masonry work at a gate pier is usually not a roofing line. If the roofer will reset a coping or repoint a joint, that should be priced by a mason or named as a subcontract. Keys Roofing documents the masonry condition in the written scope and states what the roof crew will touch. Whatever is not roof work should be labeled that way so it does not disappear into the total.
Scaffolding or a lift may be the largest single cost for a gate structure. A two-story lodge with a steep pitch may need a tower or a boom. Ask whether the scaffold is in the bid or quoted as an allowance. An allowance is a number that is not yet a price, and a gate structure is a common place for allowances to hide.
Shingles for a gatehouse are ordered by the bundle. Keys installs Atlas and Malarkey shingles, and color has to match the house if the gatehouse is visible from the drive. A separate order can show a different shade from the house order, so ask the roofer to name the shingle line and color for the gatehouse as its own line on the order.
Metal for the gate arch, valleys and drip edge is charged by the foot. Ask for each run by length, not as a lump sum. A lodge eave may need a longer drip edge than the house because its overhang is deeper. Ask how that overhang was measured.
What to ask
Start with a written list of every roofed structure the crew will touch. The list should include the house, the garage, any pool house, the lodge at the drive, the gatehouse, the gate arch and any small shed. Ask each roofer to give a separate line for each one. A roofer who prices the whole property as one roof has not walked the lot.
Ask for the access plan in writing. For each structure, the roofer should say where the ladder stands, which wall or gate it touches, and whether the crew will walk over any lawn or stone. Ask whether the crew will set a ladder against a wall that belongs to a neighbor or a shared drive, and whether that needs a written yes first.
Ask who handles the gate motor and sensors on roof day. Ask who opens the gate, at what time, and what happens if the gate fails with the trailer inside. Ask whether the crew will need the gate open for the full day or only for deliveries.
Ask for the permit desk. Missouri does not issue a state roofing license, so the local permit is the check that matters. Ask which desk the roofer will pull from for a detached gate structure, and whether that desk needs a separate application for the gatehouse. A permit that covers the house may not cover a separate structure.
Ask for the crew's plan at the gate pier. If a coping or cap is reset, ask who does it, what mortar or metal is used, and how the joint will be checked. Ask how the new roof edge will meet the stone so that water does not run back into the masonry.
Ask how each quote lists the gatehouse. If one roofer shows a lump sum and another shows squares and feet, put the two side by side and ask the first roofer to break out the lump. If the answer stays vague, ask again in writing. For a site visit or questions about your gate structure, call Keys Roofing at (314) 220-2333.