A garage forge is a small but serious piece of equipment. A coal or gas fire sits on a hearth, a stack or hood carries the smoke up and out, and the bed of coals can stay hot for hours after the last piece of iron comes out. Homes with a workshop wing, a loft turned into a studio, or a garage bay set aside for metalwork sometimes have one. When the roof comes off, that fire may sit close to the roof edge, and nobody on the crew should have to guess where its stack ends.
This page is for the homeowner who has a forge, or is planning one, and is deciding what to settle before a roofer books a start week. The short version: the forge is a line in the roof bid, not a detail for the last day.
Town roofing
Most of the older houses in this area were built with a single main roof and a few smaller roofs over wings, porches and garages. A forge usually lives in one of those smaller spaces, and its stack often exits through the roof of that wing or through a sidewall close to the eave. That is where the tear-off gets crowded. The crew stages bundles, plywood and felt near the wall, runs a dumpster line along the drive, and sets ladders at the lowest courses. Each of those activities can land within a few feet of a hot stack.
Start by finding the stack on paper. Ask the roofer to mark the forge location, the hearth, the stack or hood, and the exact exit point on the roof or wall sketch you both sign. If the stack exits through a sidewall, mark where the wall cap or thimble sits, because that is the point where the crew will be working with flashing. If the stack is a metal pipe that runs up through the attic, say so, because a roof crew that sees an attic pipe will treat it differently from a masonry chimney.
Next, write down the clearance your forge maker lists for the hearth and stack. Use the number printed in the installation manual, not a number a neighbor remembers. The roofer should then write the distance from that clearance line to the nearest staged material. Shingle bundles, felt rolls and plywood sheets stacked against a wall near the stack are the most common problem, because they are heavy, they sit in the same spot for days, and they tend to lean toward the wall as the job goes on. A clear path of that clearance width should be on the sketch, and the crew lead should be able to point to it on the day.
Hot work needs its own rule. If the crew uses a torch, a heat gun, or a propane-fired tool for flashing or a cold-weather seal, the forge area becomes a fire zone for as long as that tool is in use. Ask each roofer who decides when hot work is allowed near the forge, and whether a fire watch is posted after the work ends. Most roofs in this area are asphalt, and asphalt that has just been heated is a poor neighbor for a live coal bed.
Shutdown is the other half. A forge that is still hot on the morning of roof day is a hazard in a yard full of people. Set the rule the night before: the fire is banked, the coals are raked out, the ash is cooled, and the damper or gas valve is closed and tagged. Name who checks that, and whether the check is written into the site log or simply trusted. If you are the person who checks it, put the time on a note on the workshop door.
What it costs
A forge changes the roof bid in a few predictable ways. None of them is a number you can pull from a brochure, so the bid has to show each one on its own line.
- Stack or flue work. If the stack exits through the roof, the flashing, cap and any storm collar around it are priced items. Ask whether the price covers resetting the stack, replacing a cap, or only sealing the existing joint.
- Clearance changes. If the crew must move a stack, add a cap or change the exit height to meet the clearance, that work belongs in the bid with its own description. A clearance change is not a discount on the roof, and it is not free because it is small.
- Staging and protection. Extra time to keep staged material off the clearance line, and any temporary spark screen, shield or cover over the hearth, should be priced. Ask whether those items are included or billed as extras.
- Ash and fuel. Coal ash and spent fuel are not roofing debris. Ask whether removal is in the bid, and whether it goes in the same dumpster as shingles or gets handled separately.
- Shutdown time. If the forge must be cooled and the crew waits for it, the waiting time is a labor question. Ask how that wait is billed, and whether a delay caused by the forge counts against the start date in writing.
Keep these as separate lines. A single lump sum that says roof plus misc will hide the stack work, and that is the work most likely to change once the crew sees the flashing.
What to ask
Before you pick a roofer, ask each one the same set of questions and write the answers beside the bid. Ask for the answers in writing, and compare them line by line.
- Where does the crew expect the stack to exit, and does the roof sketch show it?
- What clearance distance is the crew using, and which manual or listing is it taken from?
- Where will the bundles, felt rolls and plywood wait, measured from the forge hearth and stack?
- Who decides when hot work is allowed within that clearance, and who posts the fire watch?
- Who checks that the forge is cold before the crew arrives each morning, and who checks again at the end of the day?
- Is ash removal in the bid, and is it hauled apart from shingle debris?
- How is a shutdown delay caused by the forge billed, and does it move the start date?
- Does the stack or cap work appear as its own bid line, with a price?
Two more points belong on the same sheet. First, ask whether a change to the stack or its exit height could touch the permit application. A roofer who knows the job will say whether the desk needs to see the change before the crew cuts the flashing. Second, ask whether any part of the roof will be left open overnight near the forge, and how that section will be covered if the weather turns. A tarp over a hot stack is a question the crew should be able to answer in one sentence.
Keep your own copy of the sketch and the answers. If the crew lead changes, or a different foreman arrives on the Monday, the clearance line and the shutdown rule should still be on paper in front of you. A forge is not a difficult thing to plan for, but it is easy to forget when the roof is open and the crew is moving fast.