Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Garage Floor Drain Carries Tear-Off Grit Toward the Sewer

Cover a Ladue garage floor drain before tear-off, and write down who clears it if grit gets past the cover.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

On a tear-off day, the old shingles, nail heads, granule dust and torn felt all have to leave the house. Most of it goes into the dumpster in the drive, but some of it ends up on the garage floor, and if the garage has a floor drain, some of that grit is only a broom stroke from the pipe. A bid that never mentions the drain can leave you with a slow line by spring.

Town roofing

Many Ladue houses have an attached garage on the side or back of the lot, with the drive running right up to the bays. That is where the crew usually lands the dumpster, stacks the bundles and walks the debris out at the end of each day. A garage with a floor drain near the bay doors is common enough to plan for, and the drain may connect to the house drain, to a sump basin, or to a line that runs out to the street. You need to know which one before the first shingle comes off, because each one carries grit to a different place.

Asphalt grit does not dissolve. It settles in the trap, builds up in the low part of the pipe, and mixes with leaves and mud that wash in from the drive during a storm. Granules are sharp enough to wear down a sump pump check valve, and nail fragments can lodge in a trap and catch more debris behind them. Over a few months, a partly blocked line can slow down until the first heavy rain shows it. Freeze and thaw in St. Louis winters push water back into any line that is already restricted, so the problem often appears in January, not in the week the roof was finished.

The easiest check is to look at the drain before anyone plans the tear-off. Lift the grate or remove the cover, look down the opening with a flashlight, and pour in a bucket of water. Watch how fast it goes. If the water stands, or drains with a gurgle, the line is already slow, and that is worth knowing before the crew arrives, because a slow line on tear-off day is harder to explain to a plumber later. Take a photo of the drain as it is, with a dated phone image, so that the condition before the job is on record.

Keys can cover the drain as part of the tear-off setup, but the bid should say so in writing. A rubber drain plug, a sheet of plywood set over the grate, and tape along the floor edge will stop most of the grit. The cover should go in before the first load of old shingles comes down the chute, and it should stay in place until the garage floor has been swept and the bays are clear. Ask the roofer to photograph the cover in position before work starts, and ask whether the cover comes off at the end of each day or stays on until the final walk.

Timing matters too. A tear-off in late fall or early winter leaves an open roof through the weeks when the ground is most likely to freeze and thaw, and a garage drain that is already slow will be the first thing to show it. If your schedule can move, ask each roofer how the drain and the open roof will be handled through the cold stretch, and whether the cover will be checked after each rain.

If your garage drain connects to a sump, mark the sump discharge line too, and make sure the pump still runs during the tear-off. A pump that is running with its basin cover off will carry grit into the basin, and grit in the basin wears the impeller and the check valve. Ask the roofer whether the basin will be covered and whether the crew will stay clear of the discharge outlet on the lot.

What it costs

Covering a floor drain is a small line in a roof job: a cover, a few minutes of labor, and a photo. It should be a named line in the bid, not a general phrase about protecting the work area. If the bid does not mention the drain at all, assume the drain is not covered, and ask the roofer to add a line that names it.

Clearing a clogged drain or a sewer line is a plumbing bill, and the amount depends on how far the blockage sits from the opening, how old the pipe is, and whether a camera can reach it. Get a written quote from a licensed plumber before you need one, so that you know the number when you are standing in a wet garage in February with a slow drain and a truck outside. Do not accept a roofing bid that promises to clean the drain without also saying how the cleaning is done and who pays for it.

Ask whether any drain cleaning needed after the job is billed to you or handled by the roofer. Then ask the roofer to write the answer into the contract, with the date and the name of the person who said it. A verbal promise to take care of it is not a scope, and the two can look very different once the crew has left.

What to ask

  1. Does the garage have a floor drain, and where does its line go: to the house drain, to a sump basin, or out to the street?
  2. Who installs the drain cover, what material is it, and will the crew photograph it in place before the first shingle comes off?
  3. Who sweeps the garage floor after the nail sweep, and does that happen every day or only at the end of the job?
  4. If grit reaches the line and the drain backs up within the year, who visits, who pays the plumber, and where is that answer written down?
  5. Will the sump basin get its own cover, and does the bid name it?
  6. Where does the crew stage the dumpster so the bay doors can still open during the job?
  7. Does the cover come off at the end of each day, or does it stay until the final walk?

Bring the garage layout and the drain location to the first walk. A photo of the floor with the grate in view is enough to start the conversation, and a note on whether the drain is connected to the house, a sump, or the street will save a second visit. Keys can be reached at (314) 220-2333 to set up that walk and to talk through the drain before the crew is scheduled.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office