Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Formal Reflecting Pool Needs a Staging Rule Before Roof Day

The pool's coping, pump and cover decide where the roof crew can stand, so name each one in writing before tear-off starts.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A reflecting pool is one of the features that makes a large Ladue lot look finished, and it is also one of the easiest things for a roof crew to step on without anyone meaning harm. The shallow basin, the stone coping around its edge and the pump box tucked nearby all sit in the ground the crew needs for staging, ladder feet and the trailer that brings shingles up to the eave. Before the bid is signed, the pool and everything attached to it should have a name, a boundary and a written rule for what happens to it on roof day.

Why the coping is a staging surface

Crews stack bundles on whatever flat, firm ground is closest to the wall they are roofing. A stone or brick coping walk looks sturdy, and it often is, but a coping course set on a thin mortar bed can crack when a stack of shingle bundles or a loaded hand truck crosses it. Ask each roofer which surface they plan to use for bundles, and whether the coping has been checked for loose units before the pallets arrive. If the answer is the lawn beside the pool, ask what that lawn will look like after the trailer has turned on it.

Freeze and thaw matter here too. In St. Louis winters, water that sits in a coping joint freezes, expands and pushes units out of line. A pool rim that looked level in October can have a new gap by March. That is a reason to photograph the coping and its joints before the roofing schedule is set, so that any movement after the job is measured against a dated record.

What the liner and pump need from the crew

A reflecting pool usually has a liner or a concrete basin under the water, and a pump line that runs back to a small equipment box. None of that belongs to the roofing scope, but all of it sits near the drop zone where tear-off debris lands. Shingle grit, nails and bits of felt that fall into still water can clog the skimmer, cling to the liner seams or get into the pump intake. If the pump runs during the job, grit can also be pushed through the return, which means the water you see at the end of the day may not be as clean as it looks.

The simplest rule is to cover the pool before tear-off starts. A tight mesh cover, weighted at the edges, keeps most debris out of the water. Drain the pool only if the owner has a plan for the water and for refilling it, because a drained basin in a freeze can crack a liner or a concrete floor. Whether to drain, cover or run the pump through the job is the owner's decision, and the bid should say which one the crew has priced around.

Where the ladder and the trailer stand

Roof crews set ladders at the eave and carry materials along the side of the house. On a formal lot, that path often runs between the house and a garden wall, past a pool and across a narrow strip of lawn. Ladue lots tend to be wide and deep, but the usable side yard is often the part with the pool, the wall and the shade of the oaks, so the flat ground is smaller than the lot suggests. The trailer that brings the shingle pallet needs a flat place to sit, a turning radius and a clear line to the gate. If the only flat ground is the pool terrace, the bid has to say whether the crew will use it, and whether the owner has agreed in writing.

Ask each roofer to walk the path with you before the schedule is final. Mark the coping edge, the pump box, the route to the back gate and the place the ladder feet will land. Then ask them to show you, on that walk, where the bundles will wait. A roofer who can answer that without looking at the drawing has probably run this kind of job before. A roofer who says the crew will figure it out on the day is leaving the staging decision to the first morning, when the trucks are already at the curb.

What to put in the bid

The bid should name three things: the pool and its equipment, the staging surface, and the cleanup. For the pool, that means a line for covering it, a line for protecting the pump and a line for who checks the skimmer and filter after the job. For staging, it means naming the surface the crew will use and stating whether any coping or paving is at risk. For cleanup, it means saying who removes grit from the pool surface, the coping and the pump basket, and whether that work is in the price or charged separately.

You should also ask whether the roofer will document the pool and coping before the first nail. Photographs with dates on them, taken from the same spots each time, are the simplest record if a stone shifts or a pump line is disturbed later. The photos belong in your file, not only in the crew's.

Questions to ask each roofer

  • Which surface will the crew stage bundles on, and is the coping on that surface checked for loose units first?
  • Will the pool be covered before tear-off, and who supplies and removes the cover?
  • Will the pump run during the job, and who watches the intake and the filter?
  • Where does the trailer park, and does its turn clear the garden wall and the back gate?
  • Who removes shingle grit from the water, the coping and the pump basket, and is that in the price?
  • Who takes the dated photos of the pool, the coping and the pump box before the job starts?

Write each answer down beside its question. If one roofer answers in full and another says the pool is not a concern, the difference is worth more than a small change in the total. Keys Roofing can walk the lot with you and put the staging plan in writing. The office number is (314) 220-2333.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office