Not every house in Ladue has a residential fire sprinkler system, but many of the larger houses do, and the piping is rarely on the roof plan. When a roof comes off, the crew works a few inches above the deck, in the same space where a sprinkler branch may run along the rafters or across the attic floor. If that pipe is cut, kinked or left unprotected through a cold snap, the damage shows up after the crew has left, and nobody on the roof bid will have promised to fix it.
Why the attic is the place to look
A sprinkler system in a house with an attic usually sends a supply line up from the basement or a mechanical room, then runs branch lines to the heads on each floor. Some of those branches cross the attic, especially where the house has a second story, a finished attic room, or a long wing built after the original roof. The heads themselves sit in the ceilings below, but the pipe that feeds them can sit right under the deck you are about to strip.
In St. Louis the attic is also a freeze risk. A February cold snap can take an unheated attic below freezing for days, and a sprinkler line that holds water will crack at the first joint that cannot expand. The roof tear-off changes the picture. Once the shingles and underlayment are gone, the attic is open to the air for the length of the job, and a line that was sheltered by the old roof is now exposed to whatever the weather brings that week. If your roof date slides into the cold season, this matters more, not less.
Freeze-thaw cycles add a second problem. Water left in a branch can freeze, thaw and freeze again, and the stress shows at fittings and at the drop where the pipe comes down through a wall. A slow drip at a fitting can be mistaken for a roof leak for weeks, which is why the attic check should be on your list before the first nail is pulled.
Town roofing and what to settle first
Most homeowners in the area deal with their roofer, their insurer and their city, and the sprinkler system tends to fall between them. The sprinkler contractor is not the roofer, and the roofer is not responsible for the piping. Unless the bid names the pipe and assigns the work, nobody has to walk the attic before the tear-off starts.
Ask the roofer to walk the attic with you before any material is ordered. Bring a flashlight and look for three things: a supply line running across the joists or along a rafter, a branch that drops down a wall, and a valve or test connection in the attic space. Take photos of each one with a date stamp. If you have a sprinkler contractor on file, ask them for the as-built drawing or the inspection record, because the drawing will show where the branch lines actually run, which the attic may not make obvious.
The roofer should also know whether the system is charged. A dry branch in the attic is a different problem from a charged one, and a crew that cuts a charged line will flood the attic floor and the ceiling below before anyone can shut the valve. Ask who has the authority to shut the system down and whether the sprinkler contractor needs to be on site when that happens.
What it costs, and what the bid should say
A roof bid does not usually price the sprinkler work, and it should not guess at a dollar figure for a contractor it does not employ. What it can do is name the work in writing, so the homeowner can compare the bids on the same footing. The bid should say whether the roofer will protect the attic branch with a shield or a cover, whether a sprinkler contractor will shut down and drain the branch before tear-off, and whether a separate visit is needed to refill, test and restore the system afterward.
Each of those steps has a cost, and the costs can sit in different places. Some bids carry the protection and leave the shutdown to the homeowner. Others include the shutdown and exclude the restoration. A bid that says nothing about the sprinkler line has not priced it at zero. It has simply left the work unassigned, and the unassigned work tends to come back as a change order on the day the attic is open.
The homeowner should also ask what happens if a head or branch is damaged during the job. The bid should say who repairs it, who pays the sprinkler contractor for the repair, and whether the roofer's insurance covers damage to the system. That is a question for the roofer to answer in writing before you sign, and it is a question about the roofer's own scope, not an insurer's decision.
What to ask each roofer
- Does the attic have a sprinkler branch, a riser, or a drop through a wall? Ask them to point to each one on the walk-through.
- Who shuts the system down, drains the branch and confirms it is safe to open the attic?
- Who protects the pipe during the tear-off, and with what material? Ask whether the protection covers the full run where the crew will work.
- Who restores the branch after the new roof is on, and who tests it?
- Is a sprinkler contractor required on site for any step, and is that visit in your bid or in a separate quote?
- If a line is damaged, who repairs it, who pays for the repair, and what does the roofer's insurance cover?
- If the roof date moves into a freeze, what does the crew do with a charged or partly drained branch overnight?
- Who signs the completion paperwork for the system, and where does a copy go?
Write the answers into the scope before you sign. A verbal promise that the crew will be careful is not a scope. A sentence that names the pipe, the step, the person and the price is.
Before the crew arrives
Give the sprinkler contractor and the roofer the same date. Mark the attic access and any valve locations in writing, and keep the attic hatch clear. If you cannot find the as-built drawing, call the installer, because an older system may have been modified in ways the attic will not show. For questions about the roof itself, call Keys Roofing at (314) 220-2333 and ask for the walk-through before the order goes in.