Some older houses across the greater St. Louis area have a second-floor sleeping porch that was closed in decades after it was built. The room now has walls, a ceiling, a heating source, and a window that opens onto the yard. From inside it looks like any other bedroom. The roof over it often does not look like the rest of the house, and that is the part a roofing bid can miss.
When a homeowner asks for a roof quote on a house like this, the number usually comes from the main roof planes. The porch roof, the low section that once sheltered an open sleeping porch, may appear as its own line or may be folded into a general allowance. If the new room sits under a shallow pitch, a flat section, or a built-up cap that was never meant to be walked every year, the materials and the labor are different from the main roof. Name that section before anyone climbs a ladder.
Find the roof that still sits above the new walls
Start in the attic and in the room itself. Many closed-in porches keep the old roof deck in place. The ceiling of the new room may be the underside of that deck, or it may be a newer ceiling hung below it with a gap that nobody insulated. In either case the roof is doing two jobs at once: it keeps rain off the old porch edge and it keeps the new room dry. A bid that says only replace the roof does not answer which surface comes off and which stays on.
Ask the roofer to walk the porch section from a ladder placed at the eave, not only from the main roof. Ask for a photo of the joint where the porch roof meets the house wall. Ask whether the porch roof ties into the main roof at a step, at a valley, or at a seam that was added later. Each of those joints needs flashing, and on most bids flashing is priced apart from the shingles or membrane that cover the field.
Before the first visit, go into the room at midday with a flashlight. Look along the top of the window frame, at the corners where the ceiling meets the walls, and at any stain or bowed drywall near the old exterior wall. A dark line along the top of a window or a soft spot in the ceiling corner tells you where water has been getting past the old roof or the old wall. Write down what you see with a date and a rough location, and take photos with the room lit from the side so the texture shows. Those notes will help you compare the roofers' answers later.
The freeze and thaw cycle works on low pitches first
St. Louis winters run through repeated freeze and thaw cycles, and a low-slope porch roof holds snow and meltwater longer than a steep main roof does. Water that sits at the eave can refreeze and push back under the shingles or the membrane. On a sleeping porch, the eave is often where an old gutter was hung, so the drip line may have moved when the walls went up.
Look at where the water goes now. If the old gutter came off when the porch was closed, the water from the porch roof may fall straight onto a patio, a lawn, or the foundation wall. If the gutter stayed in place, check the hangers on the fascia and the outlet at the end of the run. A low roof that drains into a gutter that does not quite reach it leaves a gap, and that gap becomes a splash zone that keeps the soil wet against the wall.
On a low pitch, an asphalt shingle may not be the right material at all. Ask each roofer which material is planned for the porch section and why. A roofer who proposes the same shingle used on the main roof without a reason has not thought about the slope. Ask whether the product is rated for the pitch you actually have, and ask for that rating in writing. If the answer is a roll product, a built-up system, or a metal panel, ask what the warranty covers on that section, since it may differ from the main roof.
Ventilation in a room that was never meant to be a room
An open sleeping porch had no insulated ceiling and no need for a vented attic. Closing it in usually adds insulation to the walls and sometimes to the ceiling, and that changes how air moves above the room. Warm air from the room rises into the cavity above the ceiling. If there is no path for that air to leave, the roof deck can sweat in winter and dry out only slowly in spring. Over several seasons the deck can soften in ways nobody sees from the ladder.
Ask the roofer how the porch section will be ventilated. Ask whether a vent is planned, where it sits, and what it connects to. Ask whether the deck will be checked for moisture before new material goes on, and whether any wet or soft boards found during tear-off will be replaced and priced as a line item. A soft deck is a price question, not a surprise, if the bid says how it will be handled.
Interior protection matters as much as the roof itself. When tear-off puts grit or fasteners through a ceiling that was added after the porch closed in, the room below takes the dust. Ask who covers the bed, the window, and the floor, and whether that work is inside the bid or left to the homeowner. If the room is a child's bedroom or a guest room that gets regular use, ask how the crew will keep that room closed during working hours and how the door will be marked.
What to ask each roofer
- Which roof surfaces will be torn off and which will be left in place on the porch section, named by location and not just as the porch.
- What material is planned for the low-pitch porch roof, and whether that product is rated for the slope you actually have.
- How the wall joint between the porch roof and the house wall will be flashed, and whether that flashing appears as a separate bid line.
- Where the porch roof drains now, and where it will drain after the work, with the gutter or outlet named.
- How the porch section will be ventilated, and whether that vent is in the bid or left out.
- Whether any soft or wet deck found during tear-off is priced by the sheet or by a fixed allowance, and what the allowance covers.
- Who protects the room below, and whether the dust, fastener, and access plan is written down.
Compare the answers line by line. A blank cell is an answer. If one roofer says that a step is covered and another roofer does not mention that step at all, ask the silent one to write the item out in full. A written reply to that question will show you more than a longer phone call.
Writing the porch into the bid
A closed-in sleeping porch belongs in its own part of the roof scope. Ask for it to be listed apart from the main roof planes, with its own square count, its own materials, and its own flashing lines. Ask for dated photos of the porch roof taken from the ground, from the ladder at the eave, and from the attic or the room side where the deck is visible. Keys Roofing documents damage and puts a written scope with photos and measurements in the homeowner's hands, so the porch section should appear in that scope under its own heading rather than inside a general total.
The porch line is the one most likely to change once the old roof comes off and the crew sees what was hidden above the ceiling. Keep the written scope, the dated photos, and your room notes together in one folder so that any change order can be checked against the original page. If you have questions about how a closed-in porch roof is handled on a St. Louis house, call the Keys Roofing office at (314) 220-2333 before the bid is final.